Wagga Wagga Local Environmental Plan 2010 No 378

Effective date Publication date Amendments included Notes
01 November 2024 01 November 2024 2024 (EPI 552)
2024 (EPI 556)
23 February 2024 23 February 2024 2024 (EPI 42)
10 November 2023 10 November 2023 2023 (EPI 608)
2023 (EPI 609)
01 November 2023 01 November 2023 2023 (EPI 522)
01 October 2023 01 October 2023 2023 (EPI 554)
18 August 2023 18 August 2023 2023 (EPI 458)
01 May 2023 01 May 2023 2023 (EPI 83)
26 April 2023 26 April 2023 2021 (EPI 650)
2022 (EPI 832)
01 December 2022 01 December 2022 2022 (EPI 592)
21 November 2022 21 November 2022 2022 (EPI 628)
07 October 2022 07 October 2022 2022 (EPI 601)
30 September 2022 30 September 2022 2022 (EPI 48)
30 June 2022 30 June 2022 2021 (EPI 650)
2022 (EPI 314)
09 March 2022 09 March 2022 2022 (EPI 71)
01 December 2021 01 December 2021 2021 No 6
2021 (EPI 650)
26 November 2021 26 November 2021 2021 (EPI 711)
2021 (EPI 714)
05 November 2021 05 November 2021 2021 (EPI 655)
01 October 2021 01 October 2021 2021 (EPI 579)
14 July 2021 14 July 2021 2021 (EPI 225)
2021 (EPI 226)
23 June 2021 23 June 2021 2021 (EPI 302)
01 February 2021 01 February 2021 2020 (EPI 762)
29 January 2021 29 January 2021 2021 (EPI 21)
22 January 2021 22 January 2021 2020 No 30
11 December 2020 11 December 2020 2020 No 40
28 October 2020 28 October 2020 2020 (EPI 636)
17 April 2020 17 April 2020 2020 (EPI 155)
01 March 2020 01 March 2020 2020 (EPI 69)
14 February 2020 14 February 2020 2020 (EPI 51)
07 February 2020 07 February 2020 2020 (EPI 39)
15 January 2020 15 January 2020 2019 (EPI 620)
2019 (EPI 621)
31 October 2019 31 October 2019 2018 No 46
28 February 2019 28 February 2019 2019 (EPI 133)
2019 (EPI 137)
10 December 2018 10 December 2018 2018 (EPI 717)
09 November 2018 09 November 2018 2018 No 40
26 October 2018 26 October 2018 2018 (EPI 607)
31 August 2018 31 August 2018 2018 (EPI 477)
2018 (EPI 488)
27 July 2018 27 July 2018 2018 (EPI 404)
2018 (EPI 405)
2018 (EPI 406)
04 May 2018 04 May 2018 2018 (EPI 189)
20 April 2018 20 April 2018 2018 (EPI 154)
03 April 2018 03 April 2018 2018 (EPI 105)
01 September 2017 01 September 2017 2017 (EPI 492)
2017 (EPI 493)
25 August 2017 25 August 2017 2017 (EPI 453)
30 June 2017 30 June 2017 2017 (EPI 324)
02 December 2016 02 December 2016 2016 (EPI 739)
05 August 2016 05 August 2016 2016 (EPI 309)
04 April 2016 04 April 2016 2016 (EPI 168)
11 March 2016 11 March 2016 2016 (EPI 126)
27 January 2016 27 January 2016 2016 (EPI 43)
14 August 2015 14 August 2015 2015 (EPI 469)
15 July 2015 15 July 2015 2015 No 15
08 May 2015 08 May 2015 2015 (EPI 203)
01 May 2015 01 May 2015 2015 (EPI 190)
17 February 2015 17 February 2015 2015 (EPI 69)
08 January 2015 08 January 2015 2014 No 88
15 August 2014 15 August 2014 2014 (EPI 513)
14 July 2014 14 July 2014 2014 No 33
10 January 2014 10 January 2014 2013 No 111
01 July 2013 01 July 2013 2013 No 5
28 June 2013 28 June 2013 2013 (EPI 361)
15 March 2013 15 March 2013 2013 (EPI 116)
07 January 2013 07 January 2013 2012 No 96
09 November 2012 09 November 2012 2012 (EPI 556)
05 October 2012 05 October 2012 2012 (EPI 506)
20 July 2012 20 July 2012 2012 (EPI 335)
01 November 2011 01 November 2011 2011 No 41
13 July 2011 13 July 2011 2011 (EPI 362)
2011 (EPI 363)
25 June 2011 25 June 2011 2011 (EPI 102)
07 January 2011 07 January 2011 2010 No 119
16 July 2010 16 July 2010

Wagga Wagga Local Environmental Plan 2010 (EPI 378)

notfd 16.07.2010.

Date of commencement, on publication on LW, cl 1.1AA.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 47) (2024 EPI 556)

notfd 01.11.2024.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Wagga Wagga) 2024 (EPI 552)

notfd 01.11.2024.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (Land Use Zones) (No 2) 2024 (EPI 42)

notfd 23.02.2024.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (Flood Planning) 2023 (EPI 609)

notfd 10.11.2023.

Date of commencement, on publication on LW, sec 2.

Standard Instrument (Local Environmental Plans) Amendment (Flood Planning) Order 2023 (EPI 608)

notfd 10.11.2023.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Housing and Productivity Contributions) 2023 (EPI 554)

notfd 29.09.2023.

Date of commencement, 1.10.2023, sec 2.

Standard Instrument (Local Environmental Plans) Amendment (Exceptions to Development Standards) Order 2023 (EPI 522)

notfd 15.09.2023.

Date of commencement, 1.11.2023, cl 2.

State Environmental Planning Policy Amendment (Agritourism) 2023 (EPI 458)

notfd 18.08.2023.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (National Construction Code) 2023 (EPI 83)

notfd 24.02.2023.

Date of commencement, 1.5.2023, sec 2.

State Environmental Planning Policy Amendment (Land Use Zones) 2022 (EPI 832)

notfd 16.12.2022.

Date of commencement, 26.4.2023, sec 2.

The amendment made by Sch 1.25[13] to cl 7.10(1) was without effect as the text to be amended was amended by Sch 1.25[11]. The amendment made by Sch 1.25[13] to cl 7.10(2) was without effect as the text to be omitted did not appear in that clause..

Standard Instrument (Local Environmental Plans) Amendment (Canal Estate Development and Public Bushland) Order 2022 (EPI 628)

notfd 21.10.2022.

Date of commencement, 21.11.2022, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 46) (2022 EPI 601)

notfd 07.10.2022.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Agritourism) Order 2022 (EPI 592)

notfd 06.10.2022.

Date of commencement, 1.12.2022, cl 2.

State Environmental Planning Policy Amendment (Local Distribution Premises) 2022 (EPI 314)

notfd 24.06.2022.

Date of commencement, 30.6.2022, sec 2.

Standard Instrument (Local Environmental Plans) Amendment (SEPPs) Order 2022 (EPI 71)

notfd 04.03.2022.

Date of commencement, 9.3.2022, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) 2022 (EPI 48)

notfd 18.02.2022.

Date of commencement, 30.9.2022, sec 2(2).

Amending legislation

Wagga Wagga Local Environmental Plan 2010 (Amendment No 43) (SI )

notfd 25.02.2022.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 44) (SI )

notfd 30.09.2022.

State Environmental Planning Policy (Housing) 2021 (EPI 714)

notfd 26.11.2021.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Miscellaneous) Order 2021 (EPI 711)

notfd 26.11.2021.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 42) (2021 EPI 655)

notfd 05.11.2021.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Land Use Zones) Order 2021 (EPI 650)

notfd 05.11.2021.

Date of commencement of Sch 1[1]–[15] [17] [19] [23]–[48] and [50]–[53] and Sch 2, 1.12.2021, cl 2(1).

Date of commencement of Sch 1[16] [18] [20]–[22] [49] [54] and [55], 30.6.2022, cl 2(1A).

Date of commencement of Sch 3, 26.4.2023, cl 2(2).

Wagga Wagga Local Environmental Plan 2010 (Amendment No 41) (2021 EPI 579)

notfd 01.10.2021.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Natural Disasters) 2021 (EPI 302)

notfd 18.06.2021.

Date of commencement, 23.6.2021, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Flood Planning) Order 2021 (EPI 226)

notfd 14.05.2021.

Date of commencement, 14.7.2021, cl 2.

State Environmental Planning Policy Amendment (Flood Planning) 2021 (EPI 225)

notfd 14.05.2021.

Date of commencement, 14.7.2021, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 40) (2021 EPI 191)

notfd 23.04.2021.

Date of commencement, on publication on LW, cl 2.

Community Land Development Act 2021 No 6

Assented to 26.03.2021.

Date of commencement, 1.12.2021, sec 2 and 2021 (598) LW 14.10.2021.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 39) (2021 EPI 127)

notfd 19.03.2021.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 38) (2021 EPI 22)

notfd 29.01.2021.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 37) (2021 EPI 21)

notfd 29.01.2021.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 36) (2020 EPI 767)

notfd 18.12.2020.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Secondary Dwellings) Order 2020 (EPI 762)

notfd 18.12.2020.

Date of commencement, 1.2.2021, cl 2.

Liquor Amendment (Night-time Economy) Act 2020 No 40

Assented to 27.11.2020.

Date of commencement of Schs 4.6 and 7, 11.12.2020, sec 2(1) and 2020 (713) LW 11.12.2020.

Standard Instrument (Local Environmental Plans) Amendment (Definitions) Order 2020 (EPI 636)

notfd 28.10.2020.

Date of commencement, 28.10.2020, cl 2.

Statute Law (Miscellaneous Provisions) Act 2020 No 30

Assented to 27.10.2020.

Date of commencement of amendments made by Sch 4, 22.1.2021, sec 2(4).

Wagga Wagga Local Environmental Plan 2010 (Amendment No 35) (2020 EPI 546)

notfd 11.09.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 34) (2020 EPI 448)

notfd 31.07.2020.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Energy Storage Technology) Order 2020 (EPI 155)

notfd 17.04.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 32) (2020 EPI 134)

notfd 03.04.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 33) (2020 EPI 118)

notfd 27.03.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 30) (2020 EPI 117)

notfd 27.03.2020.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Planning for Bush Fire Protection) 2020 (EPI 69)

notfd 28.02.2020.

Date of commencement, 1.3.2020, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 31) (2020 EPI 51)

notfd 14.02.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 27) (2020 EPI 39)

notfd 07.02.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 29) (2020 EPI 26)

notfd 24.01.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 28) (2020 EPI 13)

notfd 17.01.2020.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 26) (2020 EPI 6)

notfd 10.01.2020.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Miscellaneous) 2019 (EPI 621)

notfd 13.12.2019.

Date of commencement of Schs 1 and 5, 15.1.2020, cl 2(1).

Standard Instrument (Local Environmental Plans) Amendment Order 2019 (EPI 620)

notfd 13.12.2019.

Date of commencement, 15.1.2020, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 25) (2019 EPI 493)

notfd 04.10.2019.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 24) (2019 EPI 349)

notfd 19.07.2019.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 23) (2019 EPI 339)

notfd 12.07.2019.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Primary Production and Rural Development) 2019 (EPI 137)

notfd 28.02.2019.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Primary Production and Rural Development) Order 2019 (EPI 133)

notfd 28.02.2019.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Greater Sydney Commission) Order 2018 (EPI 717)

notfd 07.12.2018.

Date of commencement, 10.12.2018, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 22) (2018 EPI 608)

notfd 26.10.2018.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 21) (2018 EPI 607)

notfd 26.10.2018.

Date of commencement, on publication on LW, cl 2.

Children (Education and Care Services) Supplementary Provisions Amendment Act 2018 No 46

Assented to 27.09.2018.

Date of commencement of Sch 2.3, 31.10.2019, sec 2(1) and 2019 (200) LW 24.5.2019.

State Environmental Planning Policy Amendment (Land Use Terms) 2018 (EPI 488)

notfd 29.08.2018.

Date of commencement of Sch 1.1 and 1.2, 31.8.2018, cl 2 (1).

Standard Instrument (Local Environmental Plans) Amendment (Land Use Terms) Order 2018 (EPI 477)

notfd 29.08.2018.

Date of commencement, 31.8.2018, cl 2.

State Environmental Planning Policy Amendment (Artisan Food and Drink Industries) 2018 (EPI 406)

notfd 27.07.2018.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Garden Centres) Order 2018 (EPI 405)

notfd 27.07.2018.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Artisan Food and Drink Industries) Order 2018 (EPI 404)

notfd 27.07.2018.

Date of commencement, on publication on LW, cl 2.

Forestry Legislation Amendment Act 2018 No 40

Assented to 27.06.2018.

Date of commencement of Sch 3.12, 9.11.2018, sec 2 and 2018 (620) LW 9.11.2018.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 20) (2018 EPI 189)

notfd 04.05.2018.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 19) (2018 EPI 161)

notfd 20.04.2018.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Minimum Subdivision Lot Size) Order 2018 (EPI 154)

notfd 20.04.2018.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Coastal Management) Order 2018 (EPI 105)

notfd 23.03.2018.

Date of commencement, 3.4.2018, cl 2.

State Environmental Planning Policy Amendment (Child Care) 2017 (EPI 493)

notfd 01.09.2017.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Child Care) Order 2017 (EPI 492)

notfd 01.09.2017.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Vegetation) Order 2017 (EPI 453)

notfd 25.08.2017.

Date of commencement, 25.8.2017, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 18) (2017 EPI 324)

notfd 30.06.2017.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 16) (2016 EPI 739)

notfd 02.12.2016.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 17) (2016 EPI 580)

notfd 09.09.2016.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Observatory and Defence Facility) Order 2016 (EPI 309)

notfd 10.06.2016.

Date of commencement, 56 days after publication on LW, cl 2.

Local Environmental Plan (Regional LEPs Consequential Amendments) 2016 (EPI 168)

notfd 04.04.2016.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment Order 2016 (EPI 126)

notfd 11.03.2016.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Maps) Order 2016 (EPI 43)

notfd 27.01.2016.

Date of commencement, 27.1.2016, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 15) (2015 EPI 469)

notfd 14.08.2015.

Date of commencement, on publication on LW, cl 2.

Statute Law (Miscellaneous Provisions) Act 2015 No 15

Assented to 29.06.2015.

Date of commencement of Sch 3, 15.7.2015, sec 2 (3).

Wagga Wagga Local Environmental Plan 2010 (Amendment No 14) (2015 EPI 203)

notfd 08.05.2015.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 4) (2015 EPI 190)

notfd 01.05.2015.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 13) (2015 EPI 69)

notfd 17.02.2015.

Date of commencement, on publication on LW, cl 2.

Statute Law (Miscellaneous Provisions) Act (No 2) 2014 No 88

Assented to 28.11.2014.

Date of commencement of Sch 2, 8.1.2015, sec 2 (1).

Standard Instrument (Local Environmental Plans) Amendment Order 2014 (EPI 513)

notfd 15.08.2014.

Date of commencement, on publication on LW, cl 2.

Statute Law (Miscellaneous Provisions) Act 2014 No 33

Assented to 24.06.2014.

Date of commencement of Sch 2.36, 14.7.2014, Sch 2.36.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 12) (2014 EPI 307)

notfd 30.05.2014.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 11) (2014 EPI 174)

notfd 04.04.2014.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 10) (2014 EPI 76)

notfd 21.02.2014.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 9) (2013 EPI 685)

notfd 06.12.2013.

Date of commencement, on publication on LW, cl 2.

Statute Law (Miscellaneous Provisions) Act (No 2) 2013 No 111

Assented to 03.12.2013.

Date of commencement of Sch 3.27, 10.1.2014, Sch 3.27.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 8) (2013 EPI 361)

notfd 28.06.2013.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 6) (2013 EPI 184)

notfd 03.05.2013.

Date of commencement, on publication on LW, cl 2.

Liquor Amendment (Small Bars) Act 2013 No 5

Assented to 19.03.2013.

Date of commencement, 1.7.2013, sec 2 and 2013 (292) LW 21.6.2013.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 7) (2013 EPI 116)

notfd 15.03.2013.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 3) (2013 EPI 38)

notfd 01.02.2013.

Date of commencement, on publication on LW, cl 2.

Forestry Act 2012 No 96

Assented to 21.11.2012.

Date of commencement of Sch 4.41, 7.1.2013, sec 2 and 2012 (680) LW 21.12.2012.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 5) (2012 EPI 556)

notfd 09.11.2012.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Definitions) Order 2012 (EPI 506)

notfd 05.10.2012.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 2) (2012 EPI 335)

notfd 20.07.2012.

Date of commencement, on publication on LW, cl 2.

Transport Legislation Amendment Act 2011 No 41

Assented to 13.09.2011.

Date of commencement of Sch 5.52, 1.11.2011, sec 2 and 2011 (559) LW 28.10.2011.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 1) (2011 EPI 445)

notfd 26.08.2011.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Standard Instrument) 2011 (EPI 363)

notfd 13.07.2011.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment (Miscellaneous) Order 2011 (EPI 362)

notfd 13.07.2011.

Date of commencement, on publication on LW, cl 2.

Standard Instrument (Local Environmental Plans) Amendment Order 2011 (EPI 102)

notfd 25.02.2011.

Date of commencement of Sch 2, 25.6.2011, Standard Instrument (Local Environmental Plans) Order 2006 (155), cl 9 (1).

Statute Law (Miscellaneous Provisions) Act (No 2) 2010 No 119

Assented to 29.11.2010.

Date of commencement of Sch 2, 7.1.2011, sec 2 (2).

This is a consolidated list of all history notes for this title. View the history notes inline to see the point-in-time history of provisions for a particular historical version by clicking the Turn history notes on button.

No reference is made to certain amendments made consequential on the amendment of the Standard Instrument (Local Environmental Plans) Order 2006.

Cl 1.3

Am 2017 (324), cl 5.

Cl 1.8A

Am 2023 (609), Sch 1.1[1].

Cl 1.9A

Am 2011 (363), Sch 26 [1]; 2019 (621), Sch 5[2]–[4].

Cl 2.1

Am 2012 (335), Sch 1 [1]; 2015 (203), Sch 1 [1]; 2022 (832), Sch 1.25[1].

Land Use Table

Am 2011 (363), Sch 26 [2]–[32]; 2012 (335), Sch 1 [2]; 2012 (556), cl 4 (1) (2); 2014 No 88, Sch 2.73 [1] [2]; 2015 (203), Sch 1 [2]–[21]; 2016 (168), Sch 1 [2] [5]; 2017 (493), Sch 1.1 [1]; 2018 (488), Sch 1.1 [1] [2]; 2018 (607), cl 5 (1) (2); 2019 (137), Sch 6 [1]; 2021 (655), cl 4(1)–(5); 2022 (314), Sch 1; 2022 (832), Sch 1.25[2]; 2024 (556), Sch 1.

Cl 4.1A

Ins 2016 (739), Sch 1 [1]. Am 2022 (832), Sch 1.25[3] [4].

Cl 4.1AA

Ins 2011 (363), Sch 26 [33]. Am 2022 (832), Sch 1.25[5].

Cl 4.2A

Am 2011 (363), Sch 26 [34]; 2015 (69), Sch 1 [1]; 2021 (21), Sch 1[1]; 2022 (832), Sch 1.25[5] [6].

Cl 4.2B

Am 2011 (363), Sch 26 [34]–[36]; 2022 (832), Sch 1.25[5].

Cl 4.6

Am 2011 (363), Sch 26 [37]; 2015 (203), Sch 1 [22]; 2022 (832), Sch 1.25[7].

Cl 4.6A

Ins 2021 (21), Sch 1[2]. Am 2022 (832), Sch 1.25[8].

Cl 5.1

Am 2024 (552), Sch 1.

Cl 5.3

Am 2011 (363), Sch 26 [34]; 2022 (832), Sch 1.25[7].

Cl 5.4

Am 2011 (363), Sch 26 [38] [39]; 2015 (469), Sch 1 [1]; 2018 (406), Sch 1.141 [1] [2].

Cl 5.5

Subst 2021 (714), Sch 11.41.

Cl 5.9

Am 2011 (363), Sch 26 [40]. Ins 2021 (302), Sch 1.30. Am 2022 (832), Sch 1.25[5] [9].

Cl 5.13

Am 2011 (363), Sch 26 [41].

Cl 5.22

Subst 2023 (609), Sch 1.1[2].

Cl 5.24

Subst 2023 (458), Sch 1[4].

Cl 5.25

Subst 2023 (458), Sch 1[4].

Cl 6.1

Am 2019 (621), Sch 1.13; 2023 (554), Sch 1.

Cl 7.1

Subst 2016 (739), Sch 1 [2].

Cl 7.1A

Ins 2011 (363), Sch 26 [42].

Cl 7.2

Rep 2021 (225), Sch 1.

Cl 7.3

Am 2013 (116), Sch 1 [1].

Cl 7.4

Am 2013 (116), Sch 1 [2].

Cl 7.5

Am 2013 (116), Sch 1 [3].

Cl 7.6

Am 2013 (116), Sch 1 [4].

Cl 7.7

Am 2022 (832), Sch 1.25[4]; 2022 (832), Sch 1.25[4] [5].

Cl 7.8

Ins 2015 (69), Sch 1 [2].

Cl 7.9

Ins 2015 (203), Sch 1 [23]. Am 2022 (832), Sch 1.25[10] [11].

Cl 7.10

Ins 2015 (203), Sch 1 [23]. Am 2022 (832), Sch 1.25[11] [12]; 2024 (42), Sch 1.50.

Cl 7.11

Ins 2016 (739), Sch 1 [3].

Cl 7.12

Ins 2016 (739), Sch 1 [3]. Am 2017 (493), Sch 1.2 [2].

Cl 7.13

Ins 2021 (579), Sch 1.

Sch 1

Am 2018 (189), cl 4; 2018 (488), Sch 1.2; 2022 (601), cl 4; 2022 (832), Sch 1.25[14] [15].

Sch 2

Am 2015 (469), Sch 1 [2]; 2020 (39), Sch 1; 2020 (69), Sch 1.13; 2023 (83), Sch 1.10[1]; 2023 (609), Sch 1.26.

Sch 4

Am 2012 (335), Sch 1 [3]–[5]; 2013 (361), Sch 1 [1]; 2020 (51), cl 5.

Sch 5

Am 2015 (190), Sch 1 [1] [2]; 2018 (607), cl 5 (3) (4); 2022 (48), Sch 2.

Dictionary

Am 2010 No 119, Sch 2.41; 2013 (116), Sch 1 [5] [6]; 2013 (361), Sch 1 [2]; 2015 (69), Sch 1 [3]; 2023 (83), Sch 1.10[2].

Maps

Am 2011 (445), cl 4; 2012 (335), cl 4; 2013 (38), cl 4; 2013 (116), Sch 1 [5] [6]; 2013 (184), cl 4; 2013 (361), Sch 1 [2]; 2013 (685), cl 4; 2014 (76), cl 4; 2014 (174), cl 4; 2014 (307), cl 4; 2015 (69), cl 4; 2015 (190), cl 4; 2015 (203), cl 4; 2015 (469), cl 4; 2016 (580), cl 4; 2016 (739), cl 4; 2017 (324), cl 4; 2018 (161), cl 4; 2018 (607), cl 4; 2018 (608), cl 4; 2019 (339), cl 4; 2019 (349), cl 4; 2019 (493), cl 4; 2020 (6), cl 4; 2020 (13), cl 4; 2020 (26), cl 4; 2020 (51), cl 4; 2020 (117), cl 4; 2020 (118), cl 4; 2020 (134), cl 4; 2020 (448), cl 4; 2020 (546), cl 4; 2020 (767), cl 4; 2021 (22), cl 4; 2021 (127), cl 4; 2021 (191), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.

Wagga Wagga Local Environmental Plan 2010

Publication: 16 July 2010 PDF icon 2010 (SI 378)

The following links are the currently available options to download documents as XML.

Download XML

Download legislative history XML