Water (Part 2—General) Regulation 1997



Part 1 Preliminary
1   Name of Regulation
This Regulation is the Water (Part 2—General) Regulation 1997.
2   Commencement
This Regulation commences on 22 August 1997.
3   Definitions
(1)  In this Regulation:
the Act means the Water Act 1912.
(2)  In this Regulation, a reference to a Form is a reference to a Form set out in Schedule 3.
4   Notes
The explanatory note and table of contents do not form part of this Regulation.
5   Extension of definition of “River”
For the purposes of paragraph (c) of the definition of River in section 5 (1) of the Act, that part of the Gol Gol Channel shown hatched black on the map marked “DWR Plan No 44/623”, a copy of which is deposited in the Parramatta Office of the Department of Land and Water Conservation, is prescribed as being a river.
5A   Streams of water not within definition of “River”
For the purposes of the definition of River in section 5 (1) of the Act, the following streams of water are prescribed as not being rivers:
Barratta Creek, as shown on Central Mapping Authority map entitled “Morago 7827–II & III” (First Edition 1:50 000 Topographic Series)
Box Creek Escape Channel, as shown on Central Mapping Authority map entitled “Morago 7827–II & III” (First Edition 1:50 000 Topographic Series)
cl 5A: Ins 9.4.1998.
Part 2 Licences, permits and authorities
Division 1 Applications for licences, permits or authorities
6   Application forms
An application under a section of the Act specified in Column 1 of Schedule 1 must be in the form specified in Column 2 of that Schedule opposite that section.
7   Deposits to be lodged with applications
A deposit of $30 must be lodged with the following applications:
(a)  applications for licences under sections 10, 13 and 13A of the Act,
(b)  applications for authorities for joint water supply schemes under section 20 of the Act,
(c)  applications for group licences under section 20K of the Act.
Division 2 Form of licence
8   Form of licence
(1)  A licence under section 12 or 13 of the Act must be in Form 8.
(2)  A licence under section 13A of the Act must be in Form 9.
Division 3 Fees and charges
9   Fees for licences, authorities, permits and renewals
(1)  The fees payable for licences, authorities for joint water supply schemes, group licences and permits (and for their renewal) are to be calculated in accordance with Schedule 2.
(2)  A fee covers the period for which a licence, authority, group licence or permit is issued or renewed.
10   Refunds of fees
(1)  The Ministerial Corporation may refund a part of the last fee paid for a revoked, cancelled or modified licence, authority for a joint water supply scheme or group licence.
(2)  A refund may only be paid to a person who is an applicant for a further licence or authority in respect of works on (or on land including) the same land as the land on which the works the subject of the revoked, cancelled or modified licence or authority were situated.
(3)  The maximum refund payable is an amount that bears such proportion to the amount paid for the licence or authority as the residue of the period for which it was granted bears to its total period.
11   Time for payment of fees
A fee must be paid:
(a)  within 5 weeks after the Ministerial Corporation notifies the applicant of the amount of the fee, or
(b)  if an appeal or objection is lodged—within one week after a decision on the appeal or objection is made, or
(c)  if the Ministerial Corporation extends the period within which the fee must be paid—within that extended period.
12   Fees for transfer of water allocations
(1)  For the purposes of section 20AJ of the Act, the fee for the transfer of a water allocation is:
(a)  $250 in respect of a transfer applied for under section 20AI (1) of the Act, or
(b)  $75 in respect of a temporary transfer applied for under section 20AI (2) of the Act.
(2)  A fee is to be lodged with the application for the transfer.
(3)  The Ministerial Corporation may refund the whole or part of the fee:
(a)  if the application is withdrawn before determination or is rejected by the Corporation, or
(b)  in such other circumstances as the Corporation considers appropriate.
cll 12: Am 9.4.1998.
13   Maximum charges under section 22C of the Act
For the purposes of section 22C (4) (b) of the Act, the maximum rate in respect of all works and methods of obtaining water is $21 per megalitre of water where the water is taken and used for any one or more of the following purposes:
(a)  irrigation,
(b)  water supply for stock,
(c)  mining,
(d)  recreation,
(e)  carrying on any industrial operation,
(f)  town water supply.
cll 13: Am 9.4.1998.
14   Times and manner of payment of charges (section 22C (4) (c) of the Act)
(1)  A charge referred to in section 22C of the Act may be paid by instalments if the Ministerial Corporation so determines.
(2)  The number of instalments and the amounts of the instalments are to be as determined by the Ministerial Corporation.
(3)  A charge or an instalment must be paid to the Ministerial Corporation within one month after a notice requiring payment has been served on the licensee or holder of the authority or permit.
(4)  The notice must be served:
(a)  personally, or
(b)  by leaving it at the property or premises on which the licensee or holder resides or carries on business (or by leaving it with a person seemingly above the age of 14 years and apparently resident or employed on the property or premises), or
(c)  by posting it by prepaid letter addressed to the licensee or holder at his or her place of residence or business last known to the Ministerial Corporation.
15   Interest on overdue charges
For the purposes of section 22C (6A) (a) of the Act, the prescribed rate of interest is the rate prescribed under section 101 of the Civil Procedure Act 2005 with respect to the payment of interest on a judgment debt.
cl 15: Subst 2005 No 28, Sch 5.49.
Part 3 Transfer of certain water rights
Division 1 Preliminary
16   Definitions
In this Part:
entitlement means a licence, authority or group licence under Part 2 of the Act.
permanent transfer means a transfer (other than a temporary transfer) of rights to take and use water.
temporary transfer means a transfer of rights to take and use water:
(a)  for a period that does not exceed 5 years, or
(b)  for a period that (when aggregated with the period or periods for which any other transfer or transfers has or have been obtained by the transferee under this Part or under Part 4 of the Regulations repealed by this Regulation) does not exceed 5 years.
transferee means the person or body to which any rights to take and use water under an entitlement are transferred by operation of a provision of this Part.
transferor means the person or body from which any rights to take and use water under an entitlement held by that person or body are transferred by operation of a provision of this Part.
water source means:
(a)  a river, lake or section of a river, or
(b)  a combination of 2 or more of them.
cl 16: Am 2009 (602), Sch 1 [1].
17   Application of Part
(1)  This Part applies to transfers, between holders of entitlements or between the holder of an entitlement and a person who is an applicant for an entitlement, of rights to take and use water from a water source that is not the subject of a volumetric water allocations scheme under Division 4B of Part 2 of the Act.
(2)  This Part applies only to a water source that the Ministerial Corporation has determined to be subject to this Part.
(3)    (Repealed)
cl 17: Am 22.3.2002; 2009 (602), Sch 1 [2].
18   Transfer of water rights
(1)  The holder of an entitlement (other than the Ministerial Corporation) may transfer the whole or part of the holder’s rights to take and use water under the entitlement:
(a)  subject to the approval of the Ministerial Corporation, to the holder of another entitlement or (in the case of a permanent transfer) to a person who is an applicant for an entitlement, or
(b)  to the Ministerial Corporation, by notice in writing given to the Ministerial Corporation.
(2)  The Ministerial Corporation, as holder of an entitlement, may transfer, on the application of the transferee, the whole or part of the Ministerial Corporation’s rights to take and use water under the entitlement to the holder of another entitlement or (in the case of a permanent transfer) to a person who is an applicant for an entitlement.
cl 18: Am 22.3.2002. Subst 2009 (602), Sch 1 [3].
Division 2 Applications for transfers
18A   Application of Division
This Division does not apply to a transfer from the holder of an entitlement to the Ministerial Corporation of rights to take and use water.
cl 18A: Ins 2009 (602), Sch 1 [4].
19   Applications for transfer generally
(1)  An application for a transfer of rights to take and use water must be in a form approved by the Ministerial Corporation.
(2)  The Ministerial Corporation may, in relation to an application:
(a)  require the transferor to provide specified information and consents, and
(b)  require the transferee to provide specified information and evidence.
(3)  Subclause (2) (a) does not apply to a transfer from the Ministerial Corporation to another person or body of rights to take and use water.
cl 19: Am 2009 (602), Sch 1 [5].
20   Applications for permanent transfer
An application for a permanent transfer of rights to take and use water must be accompanied by an application by the transferee for a new entitlement (or, if the transferee is the holder of an authority or a group licence, for an amended entitlement) that comprises or includes the rights to be transferred.
21   Applications for temporary transfer
An application for a temporary transfer of rights to take and use water may only be approved by the Ministerial Corporation if the transferee is the holder of an existing entitlement.
22   Application fees
(1)  An application for a permanent transfer of rights to take and use water must be accompanied by a fee of $275.
(2)  An application for a temporary transfer of rights to take and use water must be accompanied by a fee of $90.
(3)  The Ministerial Corporation may refund the whole or part of a fee:
(a)  if the application is withdrawn before determination or is rejected by the Corporation, or
(b)  in such other circumstances as the Corporation considers appropriate.
23   Approval of applications
(1)  In determining whether or not to approve a transfer of rights to take and use water, the Ministerial Corporation may take into consideration such matters as it thinks fit, including (without limiting the matters that may be considered):
(a)  the social and economic effects that a transfer would have if approved, and
(b)  whether there has been a history of water usage (and, if so, the extent of that usage) under the transferor’s entitlement, and
(c)  the impact on the flow and water quality of the water source that a transfer would have if approved.
(2)  The Ministerial Corporation may, as a condition of its approval, require the transferor to surrender permanently part of the transferor’s rights to take and use water under the entitlement.
Division 3 General
24   Giving effect to transfers of rights
(1)  A permanent transfer of rights to take and use water between the holder of an entitlement and a person other than the Ministerial Corporation is to be effected by the issue of a new entitlement to the transferee.
(2)  A temporary transfer of rights to take and use water between the holder of an entitlement and a person other than the Ministerial Corporation is to be effected by altering the conditions to which the entitlements of the transferor and transferee are subject.
(3)  A permanent or temporary transfer of rights to take and use water between a holder of an entitlement and the Ministerial Corporation is to be effected, after the receipt of the relevant notice referred to in clause 18 (1) (b) or the approval of the relevant application referred to in clause 23, by:
(a)  the issue of a new entitlement to the transferee, or
(b)  altering the conditions to which the entitlements of the transferor and transferee are subject.
(4)  The Ministerial Corporation may refuse to give effect to a transfer of rights to take and use water to or from the Ministerial Corporation for any or no reason.
cl 24: Am 2009 (602), Sch 1 [6] [7].
25   Superseded rights to take and use water
(1)  The rights of a transferor to take and use water under an entitlement are, on completion of the transfer of the rights, abated to the extent of the transfer and any surrender under a condition of the approval of the transfer.
(2)  Any such abatement:
(a)  is to be in the form of:
(i)  a reduction of the area in relation to which the entitlement authorises the holder to take and use water, or
(ii)  a modification of the conditions of the entitlement,
or in such other form as may be determined by the Ministerial Corporation, and
(b)  has effect for the approved period of the transfer.
(3)  The Ministerial Corporation may cancel the entitlement of a transferor if all the rights to take and use water under the entitlement are permanently transferred.
26   Transfer zones
(1)  The Ministerial Corporation may from time to time determine areas as transfer zones for the purposes of this Part.
(2)  The Corporation may refuse to approve a transfer of rights to take and use water in respect of locations that are within different transfer zones if it is satisfied that:
(a)  the transfer would result in the transferee’s transfer zone being subjected to an unacceptable commitment, and
(b)  any conditions determined by the Corporation have not been complied with.
Part 4 Miscellaneous
27   Public authorities
The following are prescribed as public authorities for the purposes of sections 14A, 18M and 22A of the Act:
A Department of the State
Rail Corporation New South Wales
Forestry Corporation
A local council
A county council
cl 27: Am 2002 No 55, Sch 1.13; 2003 No 96, Sch 3.24; 2012 No 96, Sch 4.51.
28   Declared trusts (definition of “trust” in sections 20V (1) and 22C (1) of the Act)
The following trusts (constituted under Part 3 of the Act) are declared to be trusts to which Division 4B of Part 2 and section 22C of the Act apply:
Bama Irrigation Trust
Bringan Irrigation Trust
Bullatale Creek Water Trust
Bungunyah-Koraleigh Irrigation Trust
Glenview Irrigation Trust
Goodnight Irrigation Trust
Little Merran Creek Water Trust
Pomona Irrigation Trust
West Cadell Irrigation Trust
29   Prescribed period for temporary transfer of water allocations
For the purposes of section 20AI (3) (a) of the Act, the period of 5 years is prescribed.
30   Prescribed uses under section 22C of the Act
For the purposes of section 22C (3) (a) of the Act, the following are prescribed uses:
(a)  mining,
(b)  recreation,
(c)  town water supply,
(d)  domestic.
cl 30: Am 9.4.1998.
31   Annual returns as to land irrigated
(1)  The holder of a licence or a group licence and each of the holders of an authority for a joint water supply scheme must furnish to the Ministerial Corporation, during the month of July in each year, a return in a form provided by the Corporation.
(2)  The return must include the following particulars in respect of the preceding 12 months:
(a)  the area of land irrigated,
(b)  each class of crop irrigated,
(c)  the method of irrigation,
(d)  the number of hours during which pumping or diversion has been carried on in each month,
(e)  the size of the pump or diversion work and the type of motive power.
Maximum penalty: 10 penalty units.
32   Repeal
(1)  The Water (Part 2) Regulations are repealed.
(2)  Any act, matter or thing that, immediately before the repeal of the Water (Part 2) Regulations, had effect under those Regulations continues to have effect under this Regulation.
Schedule 1 Applications
(Clause 6)
(In this Schedule, approved form means a form approved by the Ministerial Corporation.)
Column 1
 
Column 2
Section of Act
 
Form
Section 10
Application for a licence (single occupier)
Form 1
Section 13
Application for a licence (2 or more occupiers)
Approved form
Section 13A
Application for a licence (applicant not occupier of land on which work to be constructed)
Form 2
Section 14
Application for renewal of a section 12 or 13A licence
Approved form
Section 18F
Application for a permit
Form 3
Section 18J
Application for renewal of a permit
Approved form
Section 20
Application for an authority for a joint water supply scheme
Form 4
Section 20C
Application for renewal of a section 20 authority
Approved form
Section 20CA
Application for an authority for a joint water supply scheme (applicants not occupiers of land on which work to be constructed)
Form 5
Section 20CB
Application for renewal of section 20CA authority
Approved form
Section 20E (2)
Application for an amended authority for a joint water supply scheme
Approved form
Section 20K
Application for a group licence
Form 6
Section 20O
Application for renewal of a group licence
Approved form
Section 20Q
Application for an amended group licence
Form 7
Schedule 2 Fees
(Clause 9)
1   Interpretation
For the purposes of this Schedule, works to which Part 2 of the Act extends are classified as follows:
Class 1. Works for the purpose of taking water for use, including:
(a)  pumping machinery and other water lifting appliances, and
(b)  channels (whether artificial channels or natural channels artificially improved).
Class 2. Works for the purpose of storing water for use, including dams, weirs and regulators.
Class 3. Works not included in Class 1 or 2.
2   Fees for licences and renewals
(1)  The fee for a licence or a renewal of a licence in respect of a Class 1 work is, if the work is:
(a)  for town or village water supplies or recreational requirements—$95, or
(b)  for stock watering, railway, industrial, power or mining purposes, where the work will deliver water at a rate (in litres per second) that is specified in Column 1 of Table 1—the amount specified in Column 2 of that Table opposite the rate so specified, or
(c)  for irrigation purposes, where the land to be irrigated has an area (in hectares) that is specified in Column 1 of Table 2—the amount specified in Column 2 of that Table opposite the area so specified, or
(d)  for domestic purposes—$60, or
(e)  for farming purposes other than irrigation or stock water supply—$37.
(2)  The fee for an additional licence under section 18 (2) of the Act or a renewal of such a licence that is to be issued subject to a condition that water may only be diverted by a work under the licence or renewal when the flow in a river exceeds a certain flow, is, where the additional land to be irrigated has an area (in hectares) that is specified in Column 1 of Table 3—the amount specified in Column 2 of that Table opposite the area so specified.
(3)  The fee for a licence or a renewal of a licence in respect of Class 2 work is, if the work is for:
(a)  domestic, stock or recreational requirements—$95, or
(b)  irrigation, generation of power, industrial purposes or mining—$117.
(4)  The fee for a licence or a renewal of a licence in respect of Class 3 work is $117.
(5)  The fee for a licence for works that are, in the opinion of the Ministerial Corporation, combined works (or for a renewal of such a licence) is the higher or highest of the fees that would be payable under this clause if a licence were to be issued or renewed for each work.
(6)  Section 14A of the Act provides that licences for certain works carried out by prescribed public authorities may, in the discretion of the Ministerial Corporation, be issued and renewed at a nominal fee.
3   Fees for authorities and renewals
(1)  In this clause, authority means an authority under Division 4 of Part 2 of the Act.
(2)  Subject to subclause (3), the fee for an authority or a renewal of an authority in respect of a Class 1 work is, if the work is:
(a)  for town or village water supplies or recreational requirements—$95, or
(b)  for stock watering, railway, industrial, power or mining purposes, where the work will deliver water at a rate (in litres per second) that is specified in Column 1 of Table 1—the amount specified in Column 2 of that Table opposite the rate so specified, or
(c)  for irrigation purposes, where the land to be irrigated has an area (in hectares) that is specified in Column 1 of Table 2—the amount specified in Column 2 of that Table opposite the area so specified, or
(d)  for domestic purposes—$60, or
(e)  for farming purposes other than irrigation or stock water supply—$37.
(3)  The fee for an authority or a renewal of an authority that is to be issued for irrigation purposes subject to a condition that water may only be diverted by a work under the authority or renewal when the flow in a river exceeds a certain flow, is, where the land to be irrigated has an area (in hectares) that is specified in Column 1 of Table 3—the amount specified in Column 2 of that Table opposite the area so specified.
(4)  A fee for an authority or a renewal of an authority is only to be calculated in accordance with subclause (3) if the authority is designated by the Ministerial Corporation as a “high-flow” authority.
(5)  The fee for an authority or a renewal of an authority in respect of a Class 2 work is, if the work is for:
(a)  domestic, stock or recreational requirements—$95, or
(b)  irrigation, generation of power, industrial purposes or mining—$117.
(6)  The fee for an authority or a renewal of an authority in respect of a Class 3 work is $117.
(7)  If an authority or a renewal of an authority is to be issued in respect of more than one work, the fee for the authority or renewal is the higher or highest of the fees that would be payable under this clause if an authority were to be issued for each separate work in respect of which the authority or renewal is to be issued.
4   Fees for group licences and renewals
(1)  The fee for a group licence or a renewal of a group licence in respect of a Class 1 work is, if the work is:
(a)  for a domestic or stock watering purposes, where the work will deliver water at a rate (in litres per second) that is specified in Column 1 of Table 1—the amount specified in Column 2 of that Table opposite the rate so specified, or
(b)  for irrigation purposes, where the land to be irrigated has an area (in hectares) that is specified in Column 1 of Table 2—the amount specified in Column 2 of that Table opposite the area so specified.
(2)  The fee for a group licence or a renewal of a group licence in respect of a Class 2 work is, if the work is for:
(a)  domestic or stock requirements—$95, or
(b)  irrigation—$117.
(3)  The fee for a group licence or a renewal of a group licence in respect of a Class 3 work is $117.
(4)  If a group licence or a renewal of a group licence is to be issued in respect of more than one work, the fee for the group licence or renewal is the higher or highest of the fees that would be payable under this clause if a group licence were to be issued for each separate work in respect of which the group licence or renewal is to be issued.
5   Fees for permits and renewals
(1)  The fee for a permit or renewal is:
(a)  if the period does not exceed 3 months—$6, or
(b)  if the period exceeds 3 months and does not exceed 6 months—$14, or
(c)  if the period exceeds 6 months and does not exceed 9 months—$21, or
(d)  if the period exceeds 9 months—$29.
(2)  Section 18M of the Act provides that licences for certain works carried out by prescribed public authorities may, in the discretion of the Ministerial Corporation, be issued and renewed at a nominal fee.
Table 1
Column 1
Column 2
Rate in litres per second
Amount in dollars
Not exceeding 50
113
Exceeding 50 but not exceeding 57.5
126
Exceeding 57.5 but not exceeding 65
136
Exceeding 65 but not exceeding 72.5
144
Exceeding 72.5 but not exceeding 80
153
Exceeding 80 but not exceeding 87.5
159
Exceeding 87.5 but not exceeding 95
166
Exceeding 95 but not exceeding 102.5
172
Exceeding 102.5 but not exceeding 110
177
Exceeding 110 but not exceeding 117.5
183
Exceeding 117.5 but not exceeding 125
189
Exceeding 125 but not exceeding 132.5
194
Exceeding 132.5 but not exceeding 140
200
Exceeding 140 but not exceeding 147.5
207
Exceeding 147.5 but not exceeding 155
213
Exceeding 155 but not exceeding 162.5
218
Exceeding 162.5 but not exceeding 170
224
Exceeding 170 but not exceeding 177.5
230
Exceeding 177.5 but not exceeding 185
235
Exceeding 185 but not exceeding 192.5
242
Exceeding 192.5 but not exceeding 200
248
Exceeding 200 but not exceeding 207.5
254
Exceeding 207.5 but not exceeding 215
260
Exceeding 215 but not exceeding 222.5
265
Exceeding 222.5 but not exceeding 230
271
Exceeding 230
$271 plus $4 for each additional 7.5 litres per second or part thereof by which the rate exceeds 230 litres per second
Table 2
Column 1
Column 2
Area in hectares
Amount in dollars
Not exceeding 4
113
Exceeding 4 but not exceeding 6
127
Exceeding 6 but not exceeding 8
142
Exceeding 8 but not exceeding 10
156
Exceeding 10 but not exceeding 12
171
Exceeding 12 but not exceeding 14
184
Exceeding 14 but not exceeding 16
198
Exceeding 16 but not exceeding 18
213
Exceeding 18 but not exceeding 20
226
Exceeding 20 but not exceeding 22
241
Exceeding 22 but not exceeding 24
254
Exceeding 24 but not exceeding 26
269
Exceeding 26 but not exceeding 28
283
Exceeding 28 but not exceeding 30
297
Exceeding 30 but not exceeding 32
311
Exceeding 32 but not exceeding 34
326
Exceeding 34 but not exceeding 36
340
Exceeding 36 but not exceeding 38
355
Exceeding 38 but not exceeding 40
369
Exceeding 40 but not exceeding 42
381
Exceeding 42 but not exceeding 44
393
Exceeding 44 but not exceeding 46
404
Exceeding 46 but not exceeding 48
413
Exceeding 48 but not exceeding 50
425
Exceeding 50 but not exceeding 52
436
Exceeding 52 but not exceeding 54
445
Exceeding 54 but not exceeding 56
456
Exceeding 56 but not exceeding 58
468
Exceeding 58 but not exceeding 60
477
Exceeding 60 but not exceeding 62
488
Exceeding 62 but not exceeding 64
500
Exceeding 64 but not exceeding 66
509
Exceeding 66 but not exceeding 68
520
Exceeding 68 but not exceeding 70
531
Exceeding 70 but not exceeding 72
541
Exceeding 72 but not exceeding 74
552
Exceeding 74 but not exceeding 76
563
Exceeding 76 but not exceeding 78
573
Exceeding 78 but not exceeding 80
584
Exceeding 80 but not exceeding 82
594
Exceeding 82 but not exceeding 84
601
Exceeding 84 but not exceeding 86
610
Exceeding 86 but not exceeding 88
616
Exceeding 88 but not exceeding 90
623
Exceeding 90 but not exceeding 92
630
Exceeding 92 but not exceeding 94
637
Exceeding 94 but not exceeding 96
644
Exceeding 96 but not exceeding 98
651
Exceeding 98 but not exceeding 100
658
Exceeding 100 but not exceeding 102
665
Exceeding 102 but not exceeding 104
673
Exceeding 104 but not exceeding 106
680
Exceeding 106 but not exceeding 108
687
Exceeding 108 but not exceeding 110
693
Exceeding 110 but not exceeding 112
701
Exceeding 112 but not exceeding 114
707
Exceeding 114 but not exceeding 116
715
Exceeding 116 but not exceeding 118
722
Exceeding 118 but not exceeding 120
729
Exceeding 120 but not exceeding 122
736
Exceeding 122 but not exceeding 124
743
Exceeding 124 but not exceeding 126
750
Exceeding 126 but not exceeding 128
758
Exceeding 128 but not exceeding 130
765
Exceeding 130 but not exceeding 132
771
Exceeding 132 but not exceeding 134
779
Exceeding 134 but not exceeding 136
785
Exceeding 136 but not exceeding 138
793
Exceeding 138 but not exceeding 140
800
Exceeding 140 but not exceeding 142
807
Exceeding 142 but not exceeding 144
814
Exceeding 144 but not exceeding 146
820
Exceeding 146 but not exceeding 148
829
Exceeding 148 but not exceeding 150
835
Exceeding 150 but not exceeding 152
843
Exceeding 152 but not exceeding 154
849
Exceeding 154 but not exceeding 156
857
Exceeding 156 but not exceeding 158
864
Exceeding 158 but not exceeding 160
871
Exceeding 160 but not exceeding 162
878
Exceeding 162
$878 plus $5 for each additional 2 hectares or part thereof by which the area exceeds 162 hectares
Table 3
Column 1
Column 2
Area in hectares
Amount in dollars
Not exceeding 41
142
Exceeding 41 but not exceeding 82
179
Exceeding 82 but not exceeding 123
217
Exceeding 123 but not exceeding 164
255
Exceeding 164 but not exceeding 205
293
Exceeding 205 but not exceeding 246
330
Exceeding 246 but not exceeding 287
369
Exceeding 287 but not exceeding 328
406
Exceeding 328 but not exceeding 369
443
Exceeding 369 but not exceeding 410
482
Exceeding 410
$482 plus $142 for each additional 202 hectares or part thereof by which the area exceeds 410 hectares
Schedule 3 Forms
Form 1   Application under section 10 of the Water Act 1912 for a licence
(Clause 6)
Application No     
Surname
Other Names
Please use block letters
Postal Address
 
Name of river, creek, watercourse, billabong, lake, lagoon etc
  
Means of taking water, eg gravitation, pumping etc
  
Particulars of works to be licensed
Site of works to be licensed
Portion No
Parish
County
State whether pump, dam, race, levee, cutting etc
    
What right of occupation of this site do you hold
 
Details of area, if any, to be irrigated by this work
Area
Portion No
Parish
County
Type of Crop
 
hectares
   
     
     
     
     
     
Size and type of pump or size of diversion pipe or channel etc
 
Maximum rate at which water may be taken by means of the works (litres/second)
 
Estimated quantity of water proposed to be taken annually (megalitres)
 
Purpose of Works
Purpose for which water is to be used
□ Water Conservation
□ Drainage
Water Supply for:
 
□ Irrigation
□ Prevention of inundation
□ Irrigation
□ Mining
□ Domestic
□ Water Supply
 
□ Stock
□ Industrial
 
□ Changing the course of a river
If for any other purpose give details:
(tick appropriate square)
If water to be used for irrigation state:
Type of works to be provided for distribution of water, eg pipes, earthen channels, spray plant etc
Works proposed to be undertaken in preparation of land for irrigation, eg grading, check-banking
 
Name/s of local newspaper/s circulating in the district
 
Names of any other landholders to be supplied with water, the location of their lands to be supplied and the purpose for which water will be used:
Name
Portion No
Parish
County
Purpose of Supply
     
     
     
     
     
I,                                of                               
apply for a licence to construct and use the works described and to take, use and dispose of the water, if any, conserved or obtained for the purpose specified in this application and attach:
(a)  a PLAN showing the boundaries of the land occupied by me, the site of the work to be licensed, the land, if any, to be irrigated and the boundaries of the land of any other person to be supplied with water, and
(b)  a deposit of $      as security for the cost of investigation and inquiry in connection with the application.
Dated this                      day of                      19
 

.........................(Signature of Applicant)
Form 2   Application under section 13A of the Water Act 1912 for a licence
(Clause 6)
Application No     
Surname
Other Names
Please use block letters
Postal Address
 
Name of river, creek, watercourse, billabong, lake, lagoon etc
  
Means of taking water, eg gravitation, pumping etc
  
Description of SUPPLY WORKS—state whether dam, pump, levee etc
  
Type and size of pump or size of diversion pipe or channel etc
  
Location and extent of lands on which SUPPLY WORKS are to be constructed
Portion No
Parish
County
Area
Name and address of OWNER
Name and address of OCCUPIER
      
      
      
      
      
Particulars, giving sizes, capacities and grades of any channel, flume, pipe, conduit of other work in which water is to be conveyed from the supply work to the land to be supplied with water (longitudinal and cross-sectional plans of any channel to be attached)
 
Location and extent of lands on which CONVEYING WORKS are to be constructed
Portion No
Parish
County
Area
Name and address of OWNER
Name and address of OCCUPIER
      
      
      
      
      
Maximum rate at which water may be taken by means of the supply work (litres/second)
   
Estimated quantity of water proposed to be taken annually (megalitres)
   
Purpose for which water is to be used
Water Supply for:
 
□ Irrigation
□ Stock
□ Domestic
(tick appropriate square)
Details of APPLICANT’S LAND to which water is to be supplied
Portion No
Parish
County
Nature of applicant’s tenure of this land
    
    
    
    
    
Details of APPLICANT’S LAND, if any, which is to be irrigated by these works
Type of Crop
Area
Portion No
Parish
County
 
hectares
   
     
     
     
     
If water to be used for irrigation state:
Type of works to be provided for distribution of water, eg pipes, earthen channels, spray plant etc
Works proposed to be undertaken in preparation of land for irrigation, eg grading, check-banking
 
Name/s of local newspaper/s circulating in the district
 
I,                                of                               
the occupier of the land firstly described, wishing to construct and use the supply work and conveying works described for the purpose mentioned, and being unable to obtain occupation of the whole of the land required for the works, apply for a licence to construct the supply work and to take and use for the purpose the water obtained.
I attach a plan showing:
(a)  the location of the land to be supplied with water in relation to the river, creek, watercourse, billabong, lake, lagoon etc, from which the water supply is to be obtained and the portion of that land which I propose to irrigate, and
(b)  the location of the land on which the supply work and the conveying works are proposed to be constructed, and
(c)  the positions of the proposed supply work and conveying works.
I also attach plans showing longitudinal and cross-sections of all channels proposed to be constructed to convey water from the supply work to the land to be supplied with water.
I enclose a deposit of $      as security for the cost of investigation and inquiry in connection with the application.
Dated this                      day of                           19
 

.........................(Signature of Applicant)
Form 3   Application under Part 2 of the Water Act 1912 for a permit
(Clause 6)
Application No     
Surname
Other Names
Please Use Block Letters
 
Postal Address
Name of river, creek, watercourse, billabong, lake, lagoon etc
  
Means of taking water, eg gravitation, pumping etc
  
Details of works for which permit is required
Particulars of Works
Portion No
Parish
County
State whether pump, dam, race, levee, cutting etc
    
What right of occupation of the site of the proposed works do you hold?
 
Details of area, if any, to be irrigated—MAXIMUM AREA ALLOWED 4 HECTARES
Type of Crop
Area
Portion No
Parish
County
 
hectares
   
     
     
     
     
Size and type of pump or size of diversion pipe or channel etc
 
Purpose of Works
Purpose for which water is to be used
□ Water Conservation
□ Drainage
Water Supply for:
□ Irrigation
□ Prevention of inundation
□ Irrigation
□ Mining
□ Domestic
□ Water Supply
 
□ Stock
□ Industrial
 
□ Changing the course of a river
If for any other purpose give details:
(tick appropriate square)
Period for which permit is required
□ 3 months
□ 9 months
 
□ 6 months
□ 12 months
(tick appropriate square)
I,                      of                               ,
being the owner or occupier of the land described, apply for a PERMIT to construct and use the works described and to take and dispose of the water obtained for the purpose specified. I attach a PLAN showing the boundaries of the land owned or occupied by me, the site of the work for which a permit is required and the land, if any, to be irrigated.
Dated this                           day of                      19
 

.........................(Signature of Applicant)
Form 4   Application under section 20 of the Water Act 1912 for an authority for a joint water supply scheme
(Clause 6)
Application No     
Surnames
Other Names
Postal Addresses
Please Use Block Letters
Name of person and postal address to which correspondence and Water Diversion Returns are to be sent
 
Name of river, creek, watercourse, billabong, lake, lagoon etc
 
Means of taking water, eg gravitation, pumping etc
 
Details of land of each occupier to be supplied with water
Occupier
Portion No
Parish
County
Tenure
     
     
     
     
     
Details of works by which water is to be taken
Particulars of Works
Portion No
Parish
County
Maximum rate at which water may be taken
State whether pump, dam, race, levee, cutting etc
    
litres/second
Type and size of pump or size of diversion pipe or channel etc
    
Particulars, giving sizes, capacities and grades of any channel, flume, pipe, conduit or other work in which water is to be conveyed to the land of each occupier (longitudinal and cross-sectional plans of any channel to be attached)
    
Purpose for which water is to be used
Water Supply for:
(tick appropriate square)
□ Irrigation
□ Mining
□ Domestic
 
□ Stock
□ Industrial
 
 
If for any other purpose give details:
Details of crops, if any, to be irrigated by each occupier
Occupier
Type of crop
Area
Total area to be irrigated by each occupier
  
hectares
hectares
    
    
    
  
Total area to be irrigated by all applicants:
   
hectares
Estimated quantity of water proposed to be taken annually (megalitres)
 
Occupier
Estimated quantity of water proposed to be delivered annually
Particulars of rates and times at which water is proposed to be delivered to each occupier
Particulars of any other matters affecting the apportionment of water between the several occupiers
 
megalitres
  
    
    
    
    
Particulars of any money paid or proposed to be paid to any person in respect of the supply of water in connection with the joint water supply scheme
 
Particulars of any money paid or proposed to be paid to any person in respect of the occupancy or transfer of any land because of or in connection with the joint water supply scheme
 
Particulars of the arrangements between the applicants in respect of:
The provision and construction of the works
 
The operation of the works
 
The maintenance and renewal of the works
 
The provision of money for each of the foregoing
 
The payments to be made by any of the occupiers in respect of the foregoing
 
Name/s of local newspaper/s circulating in the district
 
We,                                                             
being the occupiers of the lands detailed, apply for an authority under Part 2 of the Water Act 1912 to construct and use the joint water supply scheme described and to take and use the water conserved or obtained for the purposes specified.
We attach a plan showing:
(a)  the land occupied by each occupier,
(b)  the location of the means by which water is to be taken from the river, creek, watercourse, billabong, lake, lagoon etc,
(c)  the location of any channel, flume, pipe, conduit or other work in which water is to be conveyed,
(d)  the location of any bridge, culvert, syphon, check, regulator or other structure or work to be provided,
(e)  if the work is for the purpose of irrigation the location of the areas proposed to be irrigated within the land of each occupier.
We also attach longitudinal and cross-sectional plans of all channels proposed to be constructed for the conveyance of water to the land of each occupier.
We also attach a certified copy of any agreement entered into between the occupiers or between the occupiers and any other person in respect of the joint water supply scheme.
We enclose a deposit of $      as security for the cost of investigation and inquiry in connection with the application.
Dated this                      day of                      19
 
.........................
 
.........................
 

.........................(Signatures of all Applicants)
Form 5   Application under section 20CA of the Water Act 1912 for an authority for a joint water supply scheme
(Clause 6)
Application No
Surnames


Other Names


Postal Addresses


Please Use Block Letters
Name of person and postal address to which correspondence and Water Diversion Returns are to be sent
  
Name of river, creek, watercourse, billabong, lake, lagoon etc
 
Means by which water is to be taken, eg gravitation, pumping etc
 
Details of land of each occupier to be supplied with water
Occupier
Portion No
Parish
County
Tenure
     
     
     
     
     
Details of Supply Works
Particulars of Works
Portion No
Parish
County
Maximum rate at which water may be taken
State whether pump, dam, race, levee, cutting etc
    
litres/second
Type and size of pump or size of diversion pipe or channel etc
    
Particulars, giving sizes, capacities and grades of any channel, flume, pipe, conduit or other work in which water is to be conveyed to the land of each occupier (longitudinal and cross-sectional plans of any channel to be attached)
    
Purpose for which water is to be used
Water Supply for:
(tick appropriate square)
□ Irrigation
□ Stock
□ Domestic
Location and extent of lands not occupied by applicants:
1.  On which Supply Work is to be constructed:
Portion No
Parish
County
Area
Name and Address of owner
Name and Address of occupier
      
      
      
      
      
2.  On which Conveyancing Works are to be constructed:
Portion No
Parish
County
Area
Name and Address of owner
Name and Address of occupier
      
      
      
      
      
Details of Crops, if any, to be irrigated by each occupier:
Occupier
Type of crop
Area
Total area to be irrigated by each occupier
  
hectares
hectares
  
Total area to be irrigated by all applicants
   
hectares
Estimated quantity of water proposed to be taken annually (megalitres)
 
Occupier
Estimated quantity of water proposed to be delivered annually
Particulars of rates and times at which water is proposed to be delivered to each occupier
Particulars to any other matters affecting the apportionment of water between the several occupiers
    
    
    
    
    
    
    
    
    
    
Particulars of any money paid or proposed to be paid to any person in respect of the supply of water in connection with the joint water supply scheme
 
Particulars of any money paid or proposed to be paid to any person in respect of the occupancy or transfer of any land because of or in connection with the joint water supply scheme
 
Particulars of the arrangements between the applicants in respect of:
The provision and construction of the works
 
The operation of the works
 
The maintenance and renewal of the works
 
The provision of money for each of the foregoing
 
The payments to be made by any of the occupiers in respect of the foregoing
 
Name/s of local newspaper/s circulating in the district
 
We,                                                             
the occupiers of the lands firstly described, wishing to construct and use the supply work and conveying works described for the purpose mentioned, and being unable to obtain occupation of the whole of the land required for the works, apply for an authority for a joint water supply scheme to construct the supply work and to take and use for the purpose the water obtained.
We attach a plan showing:
(a)  the land occupied by each occupier,
(b)  the location of the land to be supplied with water in relation to the river, creek, watercourse, billabong, lake, lagoon etc, from which the water supply is to be obtained,
(c)  the land on which the supply work and the conveying works are proposed to be constructed,
(d)  the location of the proposed supply work and conveying works,
(e)  the location of the means by which water is to be taken from the river or lake and the location of any channel, flume, pipe, conduit or other work in which water is to be conveyed to the land of each occupier,
(f)  the location of any bridge, culvert, syphon, check, regulator or other structure or work to be provided,
(g)  if the work is for the purpose of irrigation, the location of the areas proposed to be irrigated within the land of each occupier.
We also attach longitudinal and cross-sectional plans of all channels proposed to be constructed for the conveyance of water to the land of each occupier.
We also attach a certified copy of any agreement entered into between the occupiers or between the occupiers and any other person in respect of the joint water supply scheme.
We enclose a deposit of $      as security for the cost of investigation and inquiry in connection with the application.
Dated this                      day of                      19
 
.........................
 
.........................
 

.........................(Signatures of all Applicants)
Form 6   Application under section 20K of the Water Act 1912 for a group licence
(Clause 6)
Application No     
Please use block letters
Name of Applicant
 
Postal Address
 
Name of river, creek, watercourse, billabong, lake, lagoon etc
 
Means by which water is to be taken—eg gravitation, pumping etc
 
Details of land of each occupier to be supplied with water
Occupier
Portion No
Parish
County
Tenure
     
     
     
     
     
     
     
     
     
     
Details of Works by which water is to be taken
Particulars of works
Portion No
Parish
County
Maximum rate at which water may be taken
State whether pump, dam race, cutting etc
     
Type and size of pump or size of diversion pipe or channel etc
    
Particulars, giving sizes, capacities and grades of any channel, flume, pipe, conduit or other work in which water is to be conveyed to the land of each occupier (longitudinal and cross-sectional plans of any channel to be attached)
    
Purpose for which water is to be used
Water Supply for:
□ Irrigation
□ Stock
□ Domestic
(tick appropriate square)
   
Details of crops, if any, to be irrigated by each occupier
Occupier
Type of crop
Area (hectares)
Total area to be irrigated by each occupier (hectares)
    
    
    
    
    
    
    
    
    
    
Total area to be irrigated by all occupiers
 
Estimated quantity of water proposed to be taken (litres/second) annually (megalitres)
 
Occupier
Estimated quantity of water proposed to be delivered annually
Particulars of rates and times at which water is proposed to be delivered to each occupier
Particulars of any other matters affecting the apportionment of water between the several occupiers
    
    
    
    
    
Name/s of local newspaper/s circulating in the district
   
I,                                                             
apply for a group licence under Part 2 of the Water Act 1912 to construct and use or to use the work described and to take the water conserved or obtained and dispose of it for the use of the occupiers from time to time of land within the private district of the Board for the purposes specified in this application.
Attached is a plan showing:
(a)  the land occupied by each occupier,
(b)  the location of the means by which water is to be taken from the river, creek, watercourse, billabong, lake, lagoon etc,
(c)  the location of any channel, flume, pipe, conduit or other work in which water is to be conveyed,
(d)  the location of any bridge, culvert, syphon, check, regulator or other structure or work to be provided,
(e)  the location of the areas proposed to be irrigated within the land of each occupier.
Also attached are longitudinal and cross-sectional plans of all channels proposed to be constructed for the conveyance of water to the land of each occupier.
Enclosed is a deposit of $      as security for the cost of investigation and inquiry in connection with the application.
Dated this                      day of                      19
 

.........................(Signature of Applicant)
Form 7   Application under section 20Q of the Water Act 1912 for an amended group licence
(Clause 6)
Application No     
Please use block letters
Name of present holder of group licence
Number of existing group licence:
Postal Address
 
Names and addresses of all occupiers of ADDITIONAL LANDS proposed to be supplied with water
Surnames
Other names
Postal Addresses
   
   
   
   
   
   
   
   
   
   
Purpose for which water is to be used on the ADDITIONAL LANDS
Water Supply for:
□ Irrigation
□ Stock
□ Domestic
(tick appropriate square)
   
Details of land of each ADDITIONAL OCCUPIER to be supplied with water
Occupier
Portion No
Parish
County
Tenure over land
     
     
     
     
     
     
     
     
     
     
Details of crops, if any, to be irrigated by each ADDITIONAL OCCUPIER
Occupier
Type of crop
Area (hectares)
Total area to be irrigated by each occupier (hectares)
    
    
    
    
    
    
    
    
    
Total area to be irrigated by all additional occupiers
  
Details of proposed alteration of licensed works
Particulars of proposed alteration of works
Portion No
Parish
County
Maximum rate at which water is proposed to be taken (litres/second)
State whether change in or addition to existing works
     
Particulars, giving sizes, capacities and grade of any channel, flume, pipe, conduit or other work in which water is proposed to be conveyed to the additional land (megalitres) (longitudinal and cross-sectional plans of any channel to be attached)
 
Estimated quantity of water proposed to be delivered annually to the additional land
 
Particulars of the rates and times at which water is proposed to be delivered to the additional land
 
Name/s of local newspaper/s circulating in the district
 
I,                                                             
apply for an amended group licence under Part 2 of the Water Act 1912 to construct and use or to use the work described and to take the water conserved or obtained and dispose of it for the use of the occupiers from time to time of land within the private district of the Board for the purposes specified.
Attached is a plan showing:
(a)  the additional land proposed to be included in the amended group licence and its relation to the land specified in the existing group licence,
(b)  the location of any channel, flume, pipe, conduit or other work by means by which water is proposed to be conveyed to the additional land,
(c)  the location of any additional bridge, culvert, syphon, check, regulator or other structure or work proposed to be conveyed to the additional land,
(d)  the location of the area proposed to be irrigated within the additional land.
Also attached are longitudinal and cross-sectional plans of all channels proposed to be constructed for the conveyance of water to the additional land.
Dated this                      day of                      19
 

.........................(Signature of Applicant)
Form 8   Licence under section 12 of the Water Act 1912
(Clause 8)
No     
Date issued:      
Name and address of licensee
 
Details of Licensed Works
River or Lake
 
Portion
 
Parish
 
County
 
Nature and description
 
Purpose
 
Details of Land to be Irrigated
Portion
 
Parish
 
County
 
Area to be irrigated
hectares
Period for which licence issued
years
Fee
$
The work described, and referred to in the application and plans deposited by or on behalf of the licensee, as finally approved by the Water Administration Ministerial Corporation, is declared to be a licensed work under the Water Act 1912.
This licence is subject to the terms, limitations and conditions set out on the attached Condition Statement.
Form 9   Licence under section 13A of the Water Act 1912
(Clause 8)
No     
Date issued:      
Name and address of licensee
 
Details of Supply Works (plan attached)
River or Lake
 
Portion
 
Parish
 
County
 
Nature and description
 
Purpose
 
Details of Conveyancing Works (plan attached)
Portion
 
Parish
 
County
 
Nature and description
 
Area to be irrigated
hectares
Period for which licence issued
years
Fee
$
The work described, and referred to in the application and plans deposited by or on behalf of the licensee, as finally approved by the Water Administration Ministerial Corporation, is declared to be a licensed work under the Water Act 1912.
This licence is subject to the terms, limitations and conditions set out on the attached Condition Statement.