Part 1 Preliminary
1 Name of plan
This plan is Maclean Local Environmental Plan 2001.
2 Aims, objectives etc
The aims of this plan are:(a) to make a local environmental plan for the local government area of Maclean that is divided into separate sets of provisions for different zones, and(b) to simplify and clarify all provisions formerly applying to rural zones, and(c) to restrict subdivision in rural zones and limit additional dwelling entitlements in Zones Nos 1 (a) (the Rural (Agricultural Protection) Zone) and 1 (b) (the Rural (General Rural Land) Zone), and(d) to delete the average lot size requirement in Zone No 1 (s) (the Rural (Small Holdings) Zone) and introduce a minimum lot size of 1.5 hectares, and(e) to prohibit tourist facilities in Zones Nos 1 (b) (the Rural (General Rural Land) Zone), 1 (r) (the Rural (Residential) Zone) and 1 (s) (the Rural (Small Holdings) Zone).
3 Land to which plan applies
This plan applies to land situated in the local government area of Maclean as shown by heavy black edging on the map marked “Maclean Local Environmental Plan 1992 (Amendment No 32)” deposited in the office of the Council.
4 Relationship to other environmental planning instruments
(1) This plan repeals Maclean Local Environmental Plan 1992.(2) State Environmental Planning Policy No 4—Development Without Consent is amended by omitting from Schedule 1 (Ancillary or incidental development involving acid sulfate soils excepted from clause 10) the words “Clause 46 of Maclean Local Environmental Plan 1992” and by inserting instead the words “Clause 18 of Maclean Local Environmental Plan 2001”.
For the purposes of this plan, the Environmental Planning and Assessment Model Provisions 1980 are adopted, except for clauses 4 (1), 15, 31 and 33.
6 Consent authority
Subject to the Act, the Council is the consent authority for the purposes of this plan.
7 Dictionary
(1) In this plan:Aboriginal object means any deposit, object or other material evidence (not being a handicraft made for sale) relating to the Aboriginal habitation of an area of New South Wales, being habitation before or concurrent with (or both) the occupation of that area by persons of non-Aboriginal extraction, and includes Aboriginal remains.acid sulfate soils means actual or potential acid sulphate soils, as defined in the Acid Sulfate Soils Assessment and Management Guidelines.Acid Sulfate Soils Assessment Guidelines means the Acid Sulfate Soils Assessment Guidelines as published from time to time by the NSW Acid Sulfate Soils Management Advisory Committee and adopted by the Director.Acid Sulfate Soils Planning Maps means the series of maps marked “Maclean Local Environmental Plan 1992 (Amendment No 31) Acid Sulfate Soils Planning Maps”.advertisement means a sign, notice, device or representation in the nature of an advertisement visible from any public place or public reserve or from any navigable water.advertising structure means a structure used or to be used principally for the display of an advertisement.agriculture includes horticulture and the use of land for any purpose of husbandry, including the keeping or breeding of livestock, poultry, or bees, and the growing of fruit, vegetables and the like, but does not include aquaculture or the use of land solely for keeping or breeding livestock, poultry or bees for personal use or enjoyment by the owner or occupier of the land.ancillary removal of native vegetation means:(a) the destruction or removal of any plant declared to be a noxious weed by order under the Noxious Weeds Act 1993, by means not likely, in the opinion of the Council, to be significantly detrimental to the native ecosystem, or(b) the incidental destruction or removal of native plants lying adjacent to any such noxious weeds occurring unavoidably during the process of destroying or removing those noxious weeds, or(c) the destruction or removal of native plants, within 3 metres of the boundary between the lands owned or occupied by different persons, for the purpose of erecting or maintaining a dividing fence between those lands, or(d) the destruction or removal of native plants, within 0.5 metre of the boundary between the lands owned or occupied by different persons, for the purpose of enabling a survey to be carried out along that boundary by a surveyor registered under the Surveyors Act 1929.applicable exempt and complying development control plan means, in relation to development within a particular zone, Part C (Exempt and Complying Development) and the related Schedules of the development control plan in the following list of development control plans (all of which were adopted by Council on 18 October 2006) that is expressed to apply to land within that zone:(a) Clarence Valley Council Development Control Plan—Development in Business Zones,(b) Clarence Valley Council Development Control Plan—Development in Environmental Protection, Open Space and Special Use Zones,(c) Clarence Valley Council Development Control Plan—Development in Industrial Zones,(d) Clarence Valley Council Development Control Plan—Development in Residential Zones,(e) Clarence Valley Council Development Control Plan—Development in Rural Zones,(f) Clarence Valley Council Development Control Plan—Development in Rural Residential Zones.appointed day means the day on which this plan takes effect.aquaculture means the efficient and sustainable commercial cultivation of the resources of the sea or inland waters and includes farms established by the inundation, or further inundation, by water of an area of land for the propagation or rearing of marine or estuarine fish or plants or other organisms (including crustaceans, oysters and seaweed) which, when carried out, would be sufficient to maintain an average family in average seasons and circumstances, but does not include commercial fishing.archaeological site means the site (as shown on the Heritage Map or listed in Schedule 1) of one or more relics.arterial road means:(a) land that is an existing road indicated on the map by a broken black line between parallel continuous heavy black lines, or(b) land indicated on the map by hatching perpendicular to the centreline, being hatching:(i) between intermittent black lines, or(ii) between heavy black lines between Oyster Channel and Coldstream Street, Yamba.brothel means premises habitually used for the purposes of prostitution, or that have been used for that purpose and are likely to be used again for that purpose and includes premises used by only one prostitute for the purposes of prostitution.bulk store means a building or place used for the bulk storage of goods, where the goods stored or to be stored are not required for use in a shop or commercial premises on the same parcel of land in the same ownership.bulky goods retailing means use of a building or place for the sale by retail or auction, or the hire or display, of items (whether goods or materials) which are of such a size, shape or weight as to require:(a) a large area for handling, storage or display, orbut does not include use of a building or place for the sale of foodstuffs or clothing.(b) direct vehicular access to the site of the building or place by members of the public, for the purpose of loading items into their vehicles after purchase,bus depot means a building or place used for the servicing, repair and garaging of buses and other vehicles used for the purposes of a bus transport undertaking.bus station means a building or place used as a terminal for the assembly and dispersal of passengers travelling by bus.bus stop means a minor roadside structure or locality used for the setting down and picking up of passengers travelling by bus.bushfire control means bushfire mitigation or suppression works, or the construction and maintenance of fire trails and the erection of structures and buildings appurtenant to the operation of rural fire brigades formed or organised by the Council under section 15 of the Rural Fires Act 1997.business identification sign means an advertisement that provides information relating to the goods or services provided at the premises or place to which it is fixed, and that does not exceed 0.75 square metre in area.car repair station means a building or place used for the purpose of carrying out repairs to motor vehicles or agricultural machinery, not being:(a) body building, or(b) panel beating which involves dismantling, or(c) spray painting other than of a touching-up character.caravan park means land used for the accommodation of caravans or other moveable dwellings within the meaning of the Local Government (Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 1995.caretaker’s dwelling means a dwelling which is on land on which there is already erected a building used for commercial or industrial purposes.cemetery means a building or place for the interment of deceased persons or pets or their ashes, and includes a funeral chapel or crematorium.child care centre means a building or place which is used (whether or not for profit) for the purpose of educating, minding or caring for children (whether or not any of the children are related to the owner or operator), but only if the following conditions are satisfied:(a) the children number 6 or more, are under 6 years of age, and do not attend a government school, or a registered non-government school, within the meaning of the Education Act 1990, and(b) the building or place does not provide residential care for any of the children (other than those related to the owner or operator).clear felling means the clearing of all or most of the native trees on any parcel of land so that not more than 25 trees per hectare remain over the area of the parcel on a scattered or clustered basis. For the purposes of this definition, a parcel of land means adjoining or adjacent land held in the same ownership at any time.clearing, in relation to land, means the destruction of, or removal in any manner of, native vegetation (trees, saplings, seedlings or shrubs) growing on the land, but does not include ancillary removal of native vegetation.club means a building used by persons associated, or by a body incorporated, for social, literary, political, sporting, athletic or other lawful purposes whether of the same or a different kind and whether or not the whole or a part of such a building is the premises of a club registered under the Registered Clubs Act 1976.cluster farming means the commercial farming of land by a group of owners of that land where the major agricultural activity is managed in common.cluster housing means 3 or more dwellings grouped on a site to take advantage of good building areas or views and to conserve large areas of open space. The number of dwellings on a site area should be no greater than would be allowed if each dwelling was on a separate allotment that could be created in the same zone.commercial farming means an efficient and sustainable agricultural use of land for which the land is reasonably suited and which, when carried out on the land, would be sufficient to maintain an average family in average seasons and circumstances.commercial fishing means any taking of fish, oysters or crustaceans the selling of which requires a licence under the Fisheries Management Act 1994.commercial premises means a building or place used as an office or for other business or commercial purposes, but does not include a building or place elsewhere specifically defined in this clause or a building or place used for a purpose elsewhere specifically defined in this clause.community centre means:(a) a building used for the purpose of rest rooms, meeting rooms or indoor recreation, or for providing other similar facilities, or(b) a building or place used for the purpose of conducting social functions, child minding, cultural activities, or other similar activities, orbut does not include a place of assembly.(c) a building or place used for any combination of those purposes,community development means the development of land in accordance with the Community Land Development Act 1989 and the Community Land Management Act 1989.community land means land classified as community land within the meaning of the Local Government Act 1993.community purposes means public or community uses, including use for the purpose of churches, community halls, libraries, preschools, museums, fire stations, police stations, telecommunications, post offices and substations.conventional subdivision means a subdivision of land which is not carried out under the Strata Schemes (Freehold Development) Act 1973 or the Community Land Development Act 1989.Council means Maclean Shire Council, and includes Clarence Valley Council.curtilage, in relation to a heritage item or conservation area, means the area of land (including land covered by water) surrounding a heritage item, a heritage conservation area, or building, work or place within a heritage conservation area, which contributes to its heritage significance.dam means a construction on land of an area for the containment of water, by use of earthen walls or walls made of other materials.demolish, in relation to a heritage item, or a building, work, relic or tree within a heritage conservation area, means wholly or partly destroy, dismantle or deface the heritage item or the building, work, relic or tree.designated State public infrastructure means public facilities or services that are provided or financed by the State (or if provided or financed by the private sector, to the extent of any financial or in-kind contribution by the State) of the following kinds:(a) State and regional roads,(b) bus interchanges and bus lanes,(c) land required for regional open space,(d) land required for social infrastructure and facilities (such as land for schools, hospitals, emergency services and justice purposes).development has the meaning ascribed to it in section 4 of the Environmental Planning and Assessment Act 1979.Director, unless otherwise identified in this plan, means the person appointed and holding office under section 13 of the Act.dredging means the removal of material from the bed or banks of a river or creek where the activity is part of the construction of a new or deeper navigational area or channel or part of the re-opening of a discontinued navigational area or channel, but does not include maintenance dredging.dual occupancy means two dwellings on one allotment of land, irrespective of whether the dwellings are attached or detached.duplex means a building containing two, but not more than two, attached dwellings.dwelling means a room or suite of rooms occupied or used, or so constructed or adapted as to be capable of being occupied or used, as a separate domicile.dwelling house means a building containing one, but not more than one, dwelling.earthworks means the addition to or removal of any solid material on any land, or any other work which will alter the existing ground level or character of the surface of that land, including land filling.ecotourism facility means a tourist facility with a primary focus on experiencing natural areas and that fosters environmental and cultural understanding, appreciation and conservation.educational establishment means a building used as a school, college, technical college, academy, lecture hall, gallery or museum, but does not include a building used wholly or principally as an institution or child care centre.environmental education facility means a building or place used for the teaching, researching and dissemination of knowledge in respect of the environment.extractive industry means:(a) the winning of extractive material, orand includes any washing, crushing, grinding, milling or separating into different sizes of that extractive material on that land.(b) an undertaking, not being a mine, which depends for its operations on the winning of extractive material from the land on which it is carried out,extractive material means sand, gravel, clay, turf, soil, rock, stone or similar substances.filling means the depositing of soil, rock or other similar extractive material obtained from the same or another site, but does not include:(a) the depositing of topsoil or feature rock imported to the site that is intended for use in garden landscaping, turf or garden bed establishment or top dressing of lawns and that does not significantly alter the shape, natural form or drainage of the land, or(b) the use of land as a waste disposal facility.flood means relatively high stream flow which overtops the natural or artificial banks in any part of a stream or river.flood liable land means land which would be inundated as a result of the standard flood, as determined by the Council.flood mitigation works means the carrying out or causing to be carried out by a council engaged in flood mitigation works of any work for the purposes of flood mitigation, water conservation or river improvement in pursuance of the provisions of the Local Government Act 1993, except:(a) the erection of buildings, the installation or erection of plant or other structures or erections and the reconstruction or alteration of buildings so as materially to affect their design or external appearance, or(b) the formation or alteration of any means of access to a road.floodplain means the portion of a river valley, adjacent to the river channel, which is covered with water when the river overflows during floods.floodways means those areas where a significant volume of water flows during floods only. (They are often aligned with obvious naturally defined channels.) Floodways are areas which, even if only partially blocked, would cause a significant redistribution of flood flow, which may in turn adversely affect other areas. (They are often, but not necessarily, the areas of deeper flow or the areas where higher velocities occur.)forestry includes arboriculture, silviculture, forest protection, the cutting, dressing and preparation (otherwise than in a sawmill) of wood and other forest products and the establishment of facilities required for the removal of wood and forest products and for forest protection.general store means a shop which is used for the sale by retail of general merchandise and may include the facilities of a post office.generating works means a building or place used for the purpose of making or generating gas, electricity or other forms of energy.guesthouse means a house used to provide travellers with sleeping accommodation and meals, commonly in the style of an overnight bed and breakfast establishment.health care professional means a person who provides professional health services to members of the public, and includes:(a) a podiatrist registered under the Podiatrists Act 1989, and(b) a chiropractor or osteopath or chiropractor and osteopath registered under the Chiropractors and Osteopaths Act 1991, and(c) a physiotherapist registered under the Physiotherapists Registration Act 1945, and(d) an optometrist registered under the Optometrists Act 1930.helipad means an area or place not open to public use which is set apart for the taking off and landing of helicopters.heliport means an area or place open to the public for use by helicopters and includes terminal buildings and facilities for the parking, servicing and repair of helicopters.heritage conservation area means:(a) an area of land that is shown as a heritage conservation area on the Heritage Map (including any heritage items situated on or within that conservation area), or(b) a place of Aboriginal heritage significance shown on the Heritage Map.heritage conservation management plan means a document prepared in accordance with guidelines prepared by the Department of Planning that documents the heritage significance of an item, place or heritage conservation area and identifies conservation policies and management mechanisms that are appropriate to enable that significance to be retained.heritage impact statement means a document consisting of:(a) a statement demonstrating the heritage significance of a heritage item, archaeological site, place of Aboriginal heritage significance or other heritage conservation area, and(b) an assessment of the impact that proposed development will have on that significance, and(c) proposals for measures to minimise that impact.heritage item means a building, work, archaeological site, tree, place or Aboriginal object specified in an inventory of heritage items that is available at the office of the Council and the site and nature of which is described in Schedule 1.Heritage Map means the Maclean Local Environmental Plan 2001 Heritage Map.heritage significance means historical, scientific, cultural, social, archaeological, architectural, natural or aesthetic value.home industry means an industry carried on in a building (other than a dwelling house or a dwelling in a residential flat building) under the following circumstances:(a) the building does not occupy floor space exceeding 50 square metres and is erected within the curtilage of the dwelling house or residential flat building occupied by the person carrying on the industry or on adjoining land owned by that person,(b) the industry does not:(i) interfere with the amenity of the locality by reason of emission of noise, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, oil or grit, or otherwise, or(ii) involve exposure to view from any adjacent premises or from a public place of any unsightly matter, or(iii) require the provision of any essential service main of a greater capacity than that available in the locality.home occupation means an occupation carried on in a dwelling house or a dwelling in a residential flat building by the permanent residents of the dwelling house or dwelling which does not involve:(a) anything that would have required registration of the building under the Factories, Shops and Industries Act 1962 immediately before the repeal of section 11 of that Act, or(b) the employment of persons other than those residents, or(c) interference with the amenity of the neighbourhood by reason of emission of noise, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, oil or grit, or otherwise, or(d) the display of goods, whether in a window or otherwise, or(e) the exhibition of any notice, advertisement or sign (other than a notice, advertisement or sign exhibited on that dwelling house or dwelling to indicate the name and occupation of the resident), or(f) the sale of items (whether goods or materials) or the exposure or offer for sale of items, by retail.horticulture means farming by the cultivation of fruit, vegetables or flowers.hospital means a building or place (other than an institution) used for the purpose of providing professional health care services (such as preventative or convalescent care, diagnosis, medical or surgical treatment, care for people with developmental disabilities, psychiatric care or counselling and services provided by health care professionals) to people admitted as in-patients (whether or not out-patients are also cared for or treated there), and includes:(a) ancillary facilities for the accommodation of nurses or other health care workers, ancillary shops or refreshment rooms and ancillary accommodation for persons receiving health care or for their visitors, and(b) facilities situated in the building or at the place and used for educational or research purposes, whether or not they are used only by hospital staff or health care workers, and whether or not any such use is a commercial use.hotel means the premises to which a hotel licence, granted under the Liquor Act 2007, relates.industry means:(a) any manufacturing process within the meaning of the Factories, Shops and Industries Act 1962, orbut does not include an extractive industry.(b) the breaking up or dismantling of any goods or any article for trade or sale or gain or as ancillary to any business,intensive animal husbandry includes use of cattle feed lots, sheep feed lots, piggeries in which pigs are intensively grown, and commercial poultry operations or other intensive keeping of animals, but does not include use of livestock keeping establishments.junk yard means land used for the collection, storage, abandonment or sale of scrap metals, waste paper, rags, bottles or other scrap materials or goods used for the collecting, dismantling, storage, salvaging or abandonment of automobiles or other vehicles or machinery or for the sale of parts.kiosk means a building or light open structure used for the sale of newspapers, smallgoods and light refreshments.landscaped area means a part of a residential site used for growing plants, grasses and trees, but does not include any building, structure or hard paved area.light industry means an industry, not being an offensive or hazardous industry, in which the processes carried on, the transportation involved or the machinery or materials used do not interfere with the amenity of the neighbourhood by reason of noise, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil, or otherwise.liquid fuel depot means a depot or place used for the bulk storage for wholesale distribution of petrol, oil, petroleum or other inflammable liquid.livestock keeping establishment means a building or place in which livestock or poultry are kept:(a) for the purpose of nurturing by a feeding method other than natural grazing, andand includes poultry farms, horse training and boarding establishments and piggeries, but does not include buildings or places used for keeping livestock or poultry intended solely for personal use or enjoyment by the owners or occupiers of the buildings or places.(b) in a manner that does not involve interference with the amenity of the locality by reason of the generation of traffic or waste or the emission of noise, odour, dust or the like,local heritage significance, in relation to a place, building, work, archaeological site, tree or precinct, means its heritage significance to an area.maintenance, in relation to a heritage item or a building, work, archaeological site, tree or place within a heritage conservation area, means ongoing protective care. It does not include the removal or disturbance of existing fabric, alterations, such as carrying out extensions or additions, or the introduction of new materials or technology.maintenance dredging means the removal of material from the bed of a river or creek where the activity is for the purpose of re-establishing or maintaining shipping and boating channels as are determined by the Council in consultation with the Maritime Authority of NSW, Clarence Fishermen’s Co-operative Limited and the Director-General of the Department of Agriculture and identified on a map marked “Shipping and Boating Channels”.marina means a pontoon, jetty, pier or similar structure or an artificial waterway designed or adapted so as to be capable of providing a mooring for 3 or more small boats used primarily for pleasure or recreation, or 2 or more commercial or fishing boats, and includes any ancillary works, such as slipways and facilities for the repair and maintenance of boats and provision of fuel, boat accessories, parts and foodstuffs.mine means any place, open cut, shaft, tunnel, pit, drive, level or other excavation, drift, gutter, lead, vein, lode or reef in or by which any operation is carried on for or in connection with the purpose of obtaining any metal or mineral by any mode or method and any place on which any product of the mine is stacked, stored, crushed or otherwise treated, but does not include a quarry.mineral sand mine means a mine used for or in connection with obtaining ilmenite, monazite, rutile, zircon or similar minerals.miscellaneous forestry means operations involving the harvesting of native forests for poles, sleepers, girders, piles, pit props and fencing materials but does not include operations involving:(a) the reduction in the canopy of a forest at the appointed day by more than 80 per cent, or(b) clearing where the remaining trees are retained in a clustered (rather than scattered) manner, or(c) clear felling.motel means a building or buildings (other than a hotel or residential flat building) substantially used for the overnight accommodation of travellers and vehicles used by them, whether or not the building or buildings are also used for the provision of meals to those travellers or the general public.motor showroom means a building or place used for the display or sale of motor vehicles, caravans or boats, whether or not motor vehicle accessories, caravan accessories or boat accessories are also sold or displayed there.native plants means plants indigenous to the North Coast of the State of New South Wales or to South East Queensland, including trees, shrubs, ferns, vines, herbs and grasses indigenous to those areas.neighbourhood centre means an integrated complex containing shops and commercial premises which serve the local community on a limited scale, with ancillary parking and landscaping, and whether or not it also contains structures or works used for the purpose of bus stations, child care centres, clubs, community centres, dwellings attached to other buildings, hotels, places of assembly, places of public worship, professional consulting rooms, public buildings, recreation, recreation facilities, refreshment rooms, retail plant nurseries, service stations or taverns.offensive or hazardous industry means an industry which, by reason of the processes involved or the method of manufacture or the nature of the materials used or produced, requires isolation from other buildings.operational land means land classified as operational land within the meaning of the Local Government Act 1993.place of Aboriginal heritage significance means an area of land shown on the Heritage Map that is:(a) the site of one or more Aboriginal objects or a place that has the physical remains of pre-European occupation by, or is of contemporary significance to, the Aboriginal people. It can (but need not) include items and remnants of the occupation of the land by Aboriginal people, such as burial places, engraving sites, rock art, midden deposits, scarred and sacred trees and sharpening grooves, or(b) a natural Aboriginal sacred site or other sacred feature. It includes natural features such as creeks or mountains of long-standing cultural significance, as well as initiation, ceremonial or story places or areas of more contemporary cultural significance.place of assembly means a public hall, theatre, cinema, music hall, concert hall, dance hall, open-air theatre, drive-in theatre, music bowl or any other building of a like character used as such and whether used for the purpose of gain or not, but does not include a place of public worship, an institution or an educational establishment.place of public worship means a church, chapel or other place of public worship or religious instruction or a place used for the purpose of religious training.plant depot means a building or place used for the parking or servicing of moveable plant or machinery.prime crop or pasture land means rural land identified by the Director-General of the Department of Agriculture as Class 1, 2 or 3 of a classification set out in the Rural Land Evaluation Manual available from the Department of Agriculture, or other land identified by that Director-General as having agricultural significance.professional consulting rooms means a room or a number of rooms forming either the whole or part of, attached to or within the curtilage of, a dwelling house and used by not more than three legally qualified medical practitioners or by not more than three dentists within the meaning of the Dentists Act 1989, or by not more than three health care professionals, who practise there the profession of medicine, dentistry or health care respectively and, if more than one, practise in partnership, and who employ not more than three employees in connection with that practice.prostitution has the meaning given by the Summary Offences Act 1988.public building means a building used as offices or for administrative or other like purposes by the Crown, a statutory body, a council or an organisation established for public purposes.public utility infrastructure, in relation to an urban release area, includes infrastructure for any of the following:(a) the supply of water,(b) the supply of electricity,(c) the disposal and management of sewage.public utility undertaking means any of the following undertakings carried on or permitted or suffered to be carried on by authority of any government department or under the authority of or in pursuance of any Commonwealth or State Act:(a) railway, road transport, water transport, air transport, wharf or river undertakings,(b) undertakings for the supply of water, hydraulic power, electricity or gas or the provision of sewerage or drainage services,and a reference to a person carrying on a public utility undertaking is to be construed as including a reference to a council, county council, government department, corporation, or authority carrying on the undertaking.(c) development required in connection with the installation of telecommunication facilities,real estate sign means an advertisement in respect of a place or premises to which it is fixed which contains only a notice that the place or premises is or are for sale or letting, together with the particulars of the sale or letting, and:(a) is not displayed for more than 14 days after the letting or completion of the sale of the premises or place to which the sign relates, and(b) in the case of an advertisement in respect of residential or rural premises relating to letting or sale by private treaty—does not exceed 1.5 metres in length and 1.0 metre in height, and(c) in the case of an advertisement in respect of residential or rural premises relating to sale by auction—does not exceed 2.0 metres in length and 1.5 metres in height, and(d) in the case of an advertisement in respect of commercial and industrial premises—does not exceed 2.5 metres in length and 2.0 metres in height.recreation development means development for the purpose of any one or more of the following:(a) parks and gardens,(b) parking spaces,(c) children’s playgrounds,(d) musical entertainment,(e) public refreshment rooms,(f) buildings for public entertainment conducted or provided by the Council,(g) public entertainment,(h) boatsheds for the hire of boats to the public,(i) boats for hire to the public,(j) seats, shelter sheds, picnic kiosks, and other buildings for the convenience of the public,(k) temporary enclosures used for fund raising entertainment or public demonstrations,and may include use of an area by the Council to provide recreational facilities for the physical, cultural or intellectual welfare of the community, or use of an area by a body of persons associated for the purposes of the physical, cultural or intellectual welfare of the community to provide recreational facilities for those persons, but does not include a racecourse or a showground.(l) improvements in the embellishment of open space areas,recreation establishment means a health farm, religious retreat house, rest home, youth camp and the like but does not include a building or place elsewhere specifically defined in this clause or a building or place used or intended for use for a purpose elsewhere specifically defined in this clause.recreation facility means a building or place used for indoor recreation, a billiard saloon, table tennis centre, squash court, swimming pool, gymnasium, health studio, bowling alley, fun parlour or any other building of a like character used for recreation, and whether used for the purpose of gain or not, but does not include a place of assembly.recreational fishing means the taking of fish for personal consumption and not for sale.refreshment room means a restaurant, café, tea room, eating house or the like.relic means any deposit, object or other material evidence of human habitation:(a) that relates to the settlement of the area of Clarence Valley, not being Aboriginal settlement, and(b) that is more than 50 years old, and(c) that is a fixture or is wholly or partly within the ground.residential flat building means a building containing 3 or more dwellings on one allotment of land.restricted premises means a building or place used or intended for use as a shop in which:(a) any classified publications (other than unrestricted publications) within the meaning of the Classification (Publications, Films and Computer Games) Enforcement Act 1995 are available for sale or rental to the public, or(b) a business is conducted involving selling or disposing of products to which section 578E of the Crimes Act 1900 applies, or(c) a business is conducted, an object of which is the display or exhibition of any article that is primarily concerned with sexual behaviour, but which is not printed matter.retail plant nursery means a building or place used for both the growing and retail selling of plants, whether or not ancillary products are also sold there.road transport terminal means a building or place used for the principal purpose of the bulk handling of goods for transport by road, and includes facilities for the loading and unloading of vehicles used to transport those goods and for the parking, servicing and repair of those vehicles.roadside stall means a building or place not exceeding 20 square metres in floor space or area respectively where only primary products produced on the property on which the building or place is situated are exposed or offered for sale or sold by retail.rural industry means handling, treating, processing or packing of primary products, and includes the servicing in a workshop of plant or equipment used for rural purposes in the locality.rural tourist facility means a building or place on a farm (which may include a refreshment room and limited tourist accommodation, including serviced apartments) which is used to provide tourists with a rural education and experience concerning the growing, production or processing of rural products which are grown or cultivated on that farm.
(For the purpose of this definition, a farm means an area of adjoining or adjacent land held in the same ownership and in use for agricultural or forestry purposes.)rural worker’s dwelling means a dwelling which is on land on which there is already erected a dwelling and which is occupied by persons engaged in a rural occupation on that land.sawmill means a mill handling, cutting and processing timber from logs or baulks.selective logging means operations involving the logging of native forests for sawlogs, but does not include operations involving:(a) the reduction in the canopy of a forest at the appointed day by more than 80 per cent, or(b) clearing where the remaining trees are retained in a clustered (rather than scattered) manner, or(c) clear felling.service station means a building or place used for the fuelling of motor vehicles involving the sale by retail of petrol, oil and other petroleum products, whether or not the building or place is also used for any one or more of the following:(a) the sale by retail of spare parts and accessories for motor vehicles,(b) washing and greasing of motor vehicles,(c) installation of accessories,(d) repairing and servicing of motor vehicles involving the use of hand tools (other than repairing and servicing which involves top overhaul of motors, body building, panel beating, spray painting or suspension, transmission or chassis restoration).shop means a building or place used for the purpose of selling, exposing or offering for sale by retail, goods, merchandise or materials, but does not include a building or place elsewhere specifically defined in this clause.the map means the map marked “Maclean Local Environmental Plan 1992 (Amendment No 32)”, as amended by the maps (or, if any sheets of maps are specified, by the specified sheets of the maps) marked as follows:Editorial note—The amending maps are not necessarily listed in the order of gazettal or publication on the NSW legislation website. Information about the order of gazettal or publication can be determined by referring to the Historical notes at the end of the plan.Maclean Local Environmental Plan 2001 (Amendment No 2)Maclean Local Environmental Plan 2001 (Amendment No 12)—sheets 1 and 2Maclean Local Environmental Plan 2001 (Amendment No 16)Maclean Local Environmental Plan 2001 (Amendment No 20)Maclean Local Environmental Plan 1992 (Amendment No 30)Maclean Local Environmental Plan 1992 (Amendment No 33)Maclean Local Environmental Plan 1992 (Amendment No 34)Maclean Local Environmental Plan 1992 (Amendment No 35)total destination resort means a resort which, in the opinion of the Council, is a large self-contained tourist-oriented complex providing a wide, all inclusive range of facilities comprising shops, holiday accommodation and recreational components.tourist facility means an establishment providing for holiday accommodation or recreation and may include backpackers’ accommodation, bed and breakfast accommodation, boat landing facilities, boat sheds, camping grounds, caravan parks, guest houses, holiday cabins, hotels, houseboats, marinas, motels, playgrounds, recreation facilities, refreshment rooms, serviced apartments, kiosks, water sport facilities or clubs used in conjunction with holiday accommodation or recreation, but does not include a total destination resort.transport terminal means a building or place used as an airline terminal, a road transport terminal or a bus depot.tree preservation order means a tree preservation order referred to in clause 8 of the Environmental Planning and Assessment Model Provisions 1980, as adopted by this plan, and includes such an order made before the appointed day.urban release area means land in Zone No 2 (c).utility installation means a building or work used by a public utility undertaking, but does not include a building designed wholly or principally as administrative or business premises or as a showroom.warehouse means a building or place used for the storage of goods, merchandise or materials pending their sale and distribution to persons engaged in the retail trade.(2) In this plan:(a) a reference to a building or place used for a purpose includes a reference to a building or place intended to be used for that purpose, and(b) a reference to a map is a reference to a map deposited in the office of the Council, and(c) a reference to land within a zone specified in the Table to clause 31, 46, 53, 57 or 65 is a reference to land shown on the map in the manner indicated in clause 24 as the means of identifying land of the zone so specified.(3) Notes in, and the list of contents of, this plan do not form part of the plan.cl 7: Am 11.1.2002; 22.2.2002; 14.6.2002; 7.3.2003; 8.10.2004; 2005 (558), cl 4; 2006 (78), Sch 1.3 [1] [2]; 2006 No 58, Sch 2.32; 2007 (1), Sch 1.3 [1] [2]; 2008 (53), Sch 1 [1] [2]; 2010 (140), Sch 1 [1]–[3].
8 Suspension of certain covenants etc
(1) For the purpose of enabling development to be carried out in accordance with this plan (as in force at the time the development is carried out) or in accordance with a consent granted under the Act, the operation of any agreement, covenant or similar instrument which purports to impose restrictions on the carrying out of development on the land to which this plan applies, to the extent necessary to serve that purpose, shall not apply to any such development.(2) Nothing in subclause (1) affects the rights or interests of any public authority pursuant to any registered instrument.(3) Pursuant to section 28 of the Act, before the making of this clause the Governor approved of subclauses (1) and (2).
9 Development of land near boundaries of adjoining zones
(1) This clause applies to land (other than land to which Part 8 applies) which is within 20 metres of a boundary between two zones, excluding Zones Nos 6 (c), 7 (a), 7 (b), 7 (c) and 7 (e).(2) Regardless of any other provision of this plan, development may, with development consent, be carried out on land to which this clause applies for any purpose for which development may be carried out in the adjoining zone, where the consent authority is satisfied that the development will not have an adverse impact on the surrounding land use or other development.cl 9: Am 2010 (140), Sch 1 [4].
10 Bush fire prone land
(1) Consent must not be granted to the carrying out of development on bush fire prone land unless the Council is satisfied that adequate provision has been or will be made for the reduction of bushfire hazard on the land.(2) In this clause:bush fire prone land means land within the local government area of Maclean recorded for the time being as bush fire prone land on the bush fire prone land map held in the offices of the Council, as certified by the Commissioner of the NSW Rural Fire Service under section 146 of the Act.cl 10: Subst 2010 (140), Sch 1 [5].
11 Flood liable land
(1) Consent must not be granted to the erection of a building or the carrying out of a work on land to which this plan applies if, in the opinion of the consent authority:(a) the land is within a floodway, and(b) the carrying out of the development is likely:(i) to adversely impede the flow of floodwaters on that land or land in its immediate vicinity, or(ii) to imperil the safety of persons on that land or land in its immediate vicinity in the event of those lands being inundated with floodwaters, or(iii) to aggravate the consequence of floodwaters lying on that land or land in its immediate vicinity with regard to erosion, siltation or the destruction of vegetation, or(iv) to have an adverse effect on the water table of that land or of land in its immediate vicinity.(2) Consent must not be granted to the erection of a dwelling on flood liable land unless the floor level of the living accommodation of the dwelling is located:(a) in the case of land within Zone No 2 (a), 2 (b), 2 (t), 3 (a) or 4 (a) that is within the town of Iluka or Yamba, at least 0.3 metre above the 1 in 100 year flood level adopted by the Council, and(b) in the case of all other land, at least 0.5 metre above the 1 in 100 year flood level adopted by the Council.(3) Where an application is received by the consent authority for consent to carry out development which affects flood mitigation works carried out by the Clarence River County Council, the consent authority shall, before determining the application:(a) forward particulars of the application to the Clarence River County Council, and(b) take into consideration any representations received from the Clarence River County Council in respect of the application within 21 days after the forwarding of those particulars to that County Council.
12 Development in the vicinity of waterways
(1) Consent must not be granted to the carrying out of development for any purpose on land identified by the Council on a map kept by the Council for the purposes of this clause and within such distance as may be determined by the Council of the mean high water mark (or, where there is no mean high water mark, of the bank) of any tidal or non-tidal waterway within the local government area of Maclean.(2) In determining a distance for the purposes of this clause, the Council shall have regard to:(a) the preservation of the scenic quality of foreshores, and(b) minimising the risk of pollution of waterways, and(c) the protection of foreshore ecosystems.(3) Nothing in subclause (1) prevents consent from being granted to the development of land referred to in subclause (1) for the purpose of a jetty, pier or similar structure capable of providing a mooring for one commercial or recreational fishing boat, agriculture (other than animal boarding, breeding or training establishments, intensive animal husbandry or poultry farming establishments), boat launching ramps, commercial fishing, drainage, picnic grounds, recreational fishing or roads.
13 Development within the coastal zone
Before granting consent for any development in the coastal zone as defined in the NSW Coastal Policy 1997, the consent authority must take into consideration the design and location principles as set out in Table 3 entitled “Design and Location Principles for Consideration in LEPs, DCPs and Development Control” in the NSW Coastal Policy 1997.Note—The coastal zone includes a one kilometre strip along the coastline, three nautical miles seaward and all coastal rivers, lakes, lagoons, estuaries and islands. Land within one kilometre of coastal rivers, lakes, lagoons, estuaries and islands is included in the coastal zone.
14 Foreshore building line
(1) The Council may, by resolution, fix a line (in this clause called a foreshore building line) in respect of any land fronting any bay, river, creek, lake, lagoon, harbour or ocean.(2) A foreshore building line shall, when fixed in accordance with subclause (1), be marked on a plan or clearly described in the resolution and the plan or resolution shall be available for inspection by the public during office hours at the office of the Council.(3) The Council may by resolution alter or abolish any foreshore building line.(4) A building shall not be erected between a foreshore building line and a bay, river, creek, lake, lagoon, harbour or ocean in respect of which the line is fixed.
15 Development within river bank erosion localities
(1) This clause applies to all land adjacent to the Clarence River, as shown edged with heavy black broken and unbroken lines on the map marked “Maclean Local Environmental Plan 2001 (Amendment No 2)”. That map is referred to in this clause as the river bank map.(2) The aims of this clause are:(a) to identify land at Palmers Island fronting the Clarence River or its tributaries which is subject to a risk of major river bank erosion, and(b) to restrict development on any such land, and(c) to allow more detailed provisions to be made by means of a development control plan for the control of development of any such land.(3) A person must not carry out any development on, or subdivide, land to which this clause applies, except with development consent.(4) Consent must not be granted to the erection of a building on land to which this clause applies shown cross-hatched and edged with a broken black line on the river bank map.(5) However, a person may, with development consent, repair or rebuild a building erected before this clause commenced on land to which subclause (4) applies, but only if the building has been partially destroyed by accident or by damage caused otherwise than by river bank erosion. If any such building is totally destroyed, its rebuilding is prohibited.(6) Consent may be granted to such repairing or rebuilding only if:(a) the total floor area of the building after it has been carried out will be no greater than its total floor area prior to the accident or damage, and(b) where possible, the building will be relocated (when it is rebuilt or repaired) to a location on the land as far as is practicable from the river bank erosion escarpment, and(c) the repairing or rebuilding will be carried out within 12 months after the date when the accident or damage occurred.(7) Consent must not be granted to the carrying out of any development on, or subdivision of, land to which this clause applies shown stippled and edged with a broken black line on the river bank map unless the consent authority has taken into consideration the following:(a) the likelihood of the proposed development adversely affecting, or being adversely affected by, river bank erosion and flooding,(b) the need to relocate buildings in the long-term,(c) the need for the proposed development to be limited to a specified period of time,(d) the nature, bulk and intensity of the proposed development,(e) the provisions of any development control plan relating to development of the land or other land in the locality,(f) whether adequate safeguards and measures have been or will be in place to protect the environment and mitigate the risk of property damage or loss of life as a result of river bank erosion and flooding,(g) whether satisfactory arrangements will be made for access, during a flood and after river bank erosion, to and from the site of any building or work resulting from the proposed development.(8) A person may carry out development to protect land to which this clause applies from river bank erosion or flooding only with development consent.cl 15: Am 22.2.2002.
15A Restriction on land filling from West Yamba
Development consent must not be granted for development for the purpose of the filling of land in any zone if the filling is to be taken from land to which Part 8 applies.cl 15A: Ins 2010 (140), Sch 1 [6].
16 What is exempt and complying development?
(1) Development of minimal environmental impact is, despite any other provision of this plan, exempt development if the development is listed as exempt development in the applicable exempt and complying development control plan.(2) Development is complying development if:(a) it is listed as complying development in the applicable exempt and complying development control plan, and(b) it is local development of a kind that can be carried out with consent on the land on which it is proposed, and(c) it is not an existing use, as defined in section 106 of the Act.(3) Development is exempt or complying development only if it complies with the development standards and other requirements that are applied to the development by the applicable exempt and complying development control plan.(4) A complying development certificate issued for any complying development is to be subject to the conditions for the development specified in the applicable exempt and complying development control plan, as in force when the certificate is issued.cl 16: Am 8.10.2004. Subst 2006 (78), Sch 1.3 [3]; 2007 (1), Sch 1.3 [3].
17 (Repealed)
cl 17: Am 8.10.2004. Rep 2006 (78), Sch 1.3 [3].
18 Development on land identified on Acid Sulfate Soils Planning Maps
(1) Consent usually required A person must not, without development consent, carry out works described in the following Table on land of the class specified for those works, except as provided by subclauses (3), (4) and (8).Table
Class of land as shown on Acid Sulfate Soils Planning Maps Works 1 Any works 2 • Works below natural ground surface• Works likely to lower the watertable 3 • Works more than 1 metre below natural ground surface• Works likely to lower the watertable to a depth of more than 1 metre below the natural ground surface 4 • Works more than 2 metres below natural ground surface• Works likely to lower the watertable to a depth of more than 2 metres below the natural ground surface 5 Works which are likely to lower the watertable below 1 metre AHD on the adjacent Class 1, 2, 3 or 4 land(2) For the purposes of the Table to subclause (1), works includes:(a) any disturbance of more than one tonne of soil (such as occurs in carrying out agriculture, the construction or maintenance of drains, extractive industries, dredging, the construction of artificial waterbodies (including canals, dams and detention basins) or foundations, or flood mitigation works), or(b) any other works that are likely to lower the watertable.(3) Exception following preliminary assessment This clause does not require consent for the carrying out of works if:(a) a copy of a preliminary assessment of the proposed works undertaken in accordance with the Acid Sulfate Soils Assessment Guidelines has been given to the Council, and(b) the Council has provided written advice to the person proposing to carry out the works confirming that the results of the preliminary assessment indicate the proposed works do not require the preparation of a management plan prepared in accordance with the Acid Sulfate Soils Assessment Guidelines.(4) Exception for cane land In the case of land used for the cultivation of cane, this clause does not require consent for the carrying out of works if:(a) a “Production Area Entitlement” with the NSW Sugar Milling Cooperative Ltd applies to this land at the time of carrying out the works, and(b) the works are carried out in accordance with a drainage management plan lodged with and endorsed by the NSW Sugar Milling Cooperative Ltd, and(c) the drainage management plan has been prepared in accordance with the Sugar Industry Best Practice Guidelines, a copy of which is available from the office of the Council, and(d) the Sugar Industry Best Practice Guidelines have been approved by the Director in consultation with the NSW Acid Sulfate Soils Management Advisory Committee (ASSMAC) and the Department of Agriculture and have been adopted by the Council, and(e) the works are not carried out on any land within Zone No 7 (a) (the Environmental Protection (Ecological Significance) Zone) or land identified as a Special Emphasis Area (being land to which clause 39 applies), and(f) the Council has not served a notice on the person carrying out or using the works, or published a notice in a newspaper circulating in the locality of the works, requiring that the carrying out or use of the works must cease or that development consent must be obtained prior to the carrying out or further use of the works.(5) An annual review of drainage management plans and works to which subclause (4) relates is to be carried out by NSW Sugar Milling Cooperative Limited to a standard satisfactory to the Council and the Cooperative is to provide the Council with a copy of the results of the review immediately after it has been carried out. The Council may issue a notice under subclause (4) (f) relating to any one or more of those works if either of those requirements is not complied with.(6) Considerations for consent authority A consent required by this clause must not be granted unless the consent authority has considered:(a) the adequacy of an acid sulfate soils management plan prepared for the proposed development in accordance with the Acid Sulfate Soils Assessment Guidelines, and(b) the likelihood of the proposed development resulting in the discharge of acid water, and(c) (Repealed)(7) Public authorities This clause requires consent for development to be carried out by councils, county councils or drainage unions notwithstanding:(a) the provisions of clause 35 of the Environmental Planning and Assessment Model Provisions 1980, as adopted by this plan, and(b) clause 10 of State Environmental Planning Policy No 4—Development Without Consent.(8) Special provisions for Council and county councils Regardless of the provisions of subclause (7), the following types of development may be carried out by the Council or a county council without development consent:(a) development consisting of emergency work, and(b) development consisting of routine maintenance, andand development ancillary to that development, such as the carrying out of excavation work, the construction of accessways and the provision of power supplies.(c) development consisting of minor work,(9) Where the Council or a county council carries out development described in subclause (8) and encounters, or is reasonably likely to encounter, acid sulfate soils or potential acid sulfate soils, the Council or county council shall properly deal with those soils in accordance with the Acid Sulfate Soils Assessment Guidelines so as to minimise the actual or potential impact to the environment arising from the disturbance of the soils.(10) In this clause:Council’s works means such works as are owned or controlled by the Council.county council has the same meaning as in the Local Government Act 1993.emergency work means the repair or replacement of any part of the Council’s works or the works of a county council:(a) because it has been (or is being) damaged by a natural disaster, an accident, an act of vandalism or a like occurrence, orand includes work reasonably necessary to prevent or limit any further damage or malfunction.(b) because it has ceased to function or suddenly ceased to function adequately,minor work means new work carried out by the Council or a county council, but not drainage work, which has a value of less than $20,000.routine maintenance means the periodic inspection, cleaning, repair and replacement of the Council’s works or the works of a county council, but does not include work that would result in an increase in the design capacity of any part of those works or necessitate the deepening of the capacity of existing works, except where one tonne, or less, of soil is disturbed.works of a county council means such works as are owned or controlled by a county council.cl 18: Am 2008 (571), Sch 3.107 [1].
19 Development along main or arterial roads
(1) Where land has a frontage to a main or arterial road indicated on the map, consent must not be granted to the carrying out of the following development on the land:(a) development for the purpose of:boarding-houses, bulk stores, car repair stations, caravan parks, commercial premises, educational establishments, hospitals, hotels, industries (other than home or rural industries), institutions, junk yards, liquid fuel depots, mines, motels, motor showrooms, offensive or hazardous industries, places of assembly, places of public worship, recreation establishments, recreation facilities, refreshment rooms, residential flat buildings, retail plant nurseries, roadside stalls (except for a roadside stall fronting a main or arterial road which is not a State highway or within 200 metres of a State highway), sawmills, service stations, shops, stock and sales yards, taverns, timber yards, transport terminals, warehouses—unless the only access to the land is to be provided to a road other than the main or arterial road and the access to that road is located in excess of 90 metres (measured along the road alignment of the connecting road) from the alignment of the arterial road,(b) a subdivision, where access is intended onto the main or arterial road, except that (subject to subclause (3)) consent may be granted where no other alternative access is available,(c) development for the purpose of advertisements and advertising structures, except that consent may be granted to:(i) the erection on land of an advertising structure displaying notices relating only to the purpose for which the land is used, or(ii) the display of advertisements and the erection of advertising structures on land identified by the Council as suitable. Such advertising may only relate to the purpose of directing the travelling public to tourist areas or tourist facilities, and may include the advertisement of community services and community facilities relevant to the tourist.(2) In deciding whether to grant consent under subclause (1) (b), the consent authority shall take into consideration:(a) whether the development by its nature, intensity or the volume and type of traffic likely to be generated is likely to constitute a traffic hazard or to materially reduce the capacity and efficiency of the main or arterial road to carry traffic, and(b) whether the development is of a type, whether or not related to the characteristics of the land on which it is proposed to be carried out, that justifies a location in proximity to a main or arterial road, and(c) whether the location, standard and design of access points, and on-site arrangements for vehicle movement and parking, ensure that through traffic movements on the main or arterial road will not be impeded, and(d) the extent to which the development might prejudice future improvements or realignment of the main or arterial road.(3) In determining any application for consent to carry out development on land which has a frontage to a main or arterial road, the consent authority shall have regard, without limiting the matters specified in section 79C of the Act, to the following principles:(a) Development should be of a type compatible with the maintenance and enhancement (as far as is practicable) of the existing scenic character of the locality.(b) Development should not generate significant additional traffic or create or increase ribbon development directly along the main or arterial road, relative to the capacity and safety of the road.(c) The creation of vehicular access to the main or arterial road should be minimised and, where no alternative exists, the location and treatment of the access should minimise potential traffic hazards.(d) Any buildings should be sited and designed to be of an appropriate scale, so as to maintain the character of the area, to minimise disturbance to the landscape, not to intrude into the skyline, and to maintain overall building development that is consistent with the character of the area.(e) Any building should be set back from the nearest alignment of the main or arterial road at a distance to be determined by the consent authority having regard to:(i) the nature, scale and function of the building, and(ii) the maximisation of sight distance for drivers, including visibility of points of access, and(iii) the minimisation of distractions to drivers, and(iv) any possible future need to alter the road alignment.cl 19: Am 17.12.2004; 2005 (375), Sch 1 [1]; 2008 (571), Sch 3.107 [2] [3].
19A Vehicular access to Yamba Shopping Fair centre
(1) This clause applies Lots 1–3, DP 518466 and Lot 1, DP 413855, Yamba Road and Lot 2, DP 413856 and Lot 2, DP 738054, Treelands Drive, Yamba, known as the Yamba Shopping Fair centre.(2) Despite any other provision of this plan and, in particular, clause 19 (1) (a), the Council may grant consent to the development of the land to which this clause applies, but only if it is satisfied that:(a) any access to and egress from the land to Yamba Road will be restricted to “left-in-only” access, and(b) a raised median along Yamba Road will be provided to prevent right-turn movements into and out of the site.cl 19A: Ins 2005 (375), Sch 1 [2].
20 Guesthouse development along main or arterial roads
(1) This clause applies to development for the purpose of a guesthouse on land having frontage to a main or arterial road:(a) where the land abuts a road with a speed limit greater than 80 kilometres per hour, or(b) where the land abuts a road with a speed limit of 80 or less kilometres per hour and:(i) the guesthouse has a total floor area exceeding 300 square metres, or(ii) the guesthouse can ordinarily accommodate more than 12 persons (residents and guests) at any one time.(2) Consent may be granted to the carrying out of development for the purpose of a guesthouse on land to which this clause applies only if access to the land is to be provided to a road other than the main or arterial road and the access to that road is located in excess of 90 metres (measured along the road alignment of the connecting road) from the alignment of the main or arterial road.(3) In this clause:guesthouse means a house used to provide travellers with sleeping accommodation and meals, commonly in the style of an overnight bed and breakfast establishment.
21 Acquisition of land for road purposes
Note—Nothing in this clause is to be construed as requiring a public authority to acquire land—see section 27 (3) of the Act.(1) The owner of land:(a) indicated on the map by medium grey shading, ormay, by notice in writing, require:(b) indicated on the map by horizontal and vertical cross-hatching, and extending as road widening or relocation between Oyster Channel and Coldstream Street, Yamba,(c) in the case of land referred to in paragraph (a), the RTA, orto acquire the land.(d) in the case of land referred to in paragraph (b), the Council,(2) On receipt of a notice relating to land referred to in subclause (1) the public authority concerned shall acquire the land.(3) On receipt of a notice relating to land referred to in subclause (1) (a), the RTA must acquire the land if:(a) the land is vacant, orbut the RTA is not required to acquire the land if it might reasonably be required to be dedicated for a public road.(b) the land is not vacant but:(i) the land is included in the 5-year works program of the RTA current at the time of receipt of the notice, or(ii) the RTA has decided not to give concurrence to an application for consent to the carrying out of development on the land, or(iii) the RTA is of the opinion that the owner of the land will suffer hardship if the land is not acquired within a reasonable time,(4) Before its acquisition by the RTA, a person may, with development consent, carry out development on land referred to in subclause (1) (a):(a) for a purpose for which development may be carried out on land in an adjoining zone, or(b) for any other purpose which is compatible with development which may be carried out in an adjoining zone.(5) (Repealed)(6) Land referred to in subclause (1) (a) or (1) (b) and acquired under this clause may be developed with development consent, for any purpose, until such time as it is required for the purpose for which it was acquired.(7) The Council is not required to acquire land, the subject of a notice referred to in subclause (1), if the land is required to be dedicated to the Council as a condition of an existing development consent or subdivision approval.(8) Where, in the opinion of the Council, development cannot be carried out on land referred to in subclause (1) (b) for road purposes within a reasonable time after the appointed day, consent may be granted to the carrying out of development on the land for any other purpose.(9) Nothing in subclause (2) requires the Council to acquire land referred to in subclause (1) (b) while a consent is in force to the carrying out of development on that land.(10) Notwithstanding subclause (2) and without affecting subclauses (7), (8) and (9), the Council is not required to acquire land the subject of a notice referred to in subclause (1) unless:(a) a development application has, since the land last became subject to this clause, been made in respect of the land, and(b) the development the subject of the development application consists of development for a purpose for which development could have been carried out on the land (whether or not with development consent) immediately before the land last became subject to this clause, and(c) the Council has refused its consent to the development application.(11) In this clause:RTA means the Roads and Traffic Authority constituted under the Transport Administration Act 1988.vacant land means land on which, immediately before the day on which a notice under subclause (1) is given, there were no buildings, other than fences.cl 21: Am 2008 (571), Sch 3.107 [4]–[7].
22 Development for certain additional purposes permitted on specific land
(1) Nothing in this plan prevents a person, with development consent, from carrying out development on land referred to in Schedule 2 and identified on the Schedule 2 properties map if the development is specified in relation to that land in that Schedule, subject to such conditions, if any, as are so specified.(2) In this clause:Schedule 2 properties map means the map marked “Maclean Local Environmental Plan 2001 (Schedule 2 properties)”, as amended by the maps (or specified sheets of maps) marked as follows:Editorial note—The amending maps are not necessarily listed in the order of gazettal or publication on the NSW legislation website. Information about the order of gazettal or publication can be determined by referring to the Historical notes at the end of the plan.Maclean Local Environmental Plan 2001 (Amendment No 7)Maclean Local Environmental Plan 2001 (Amendment No 9)Maclean Local Environmental Plan 2001 (Amendment No 10)cl 22: Am 30.5.2003; 21.11.2003; 30.4.2004.
23 Classification and reclassification of public land as operational land
The public land described in Schedule 5 is classified, or reclassified, as operational land for the purposes of the Local Government Act 1993.
24 Zones indicated on the map
The following zones apply as identified on the map:Rural ZonesZone No 1 (a), Rural (Agricultural Protection) Zone—uncoloured with heavy black edging and lettered “1 (a)”.Zone No 1 (b), Rural (General Rural Land) Zone—uncoloured with heavy black edging and lettered “1 (b)”.Zone No 1 (f), Rural (Forests) Zone—uncoloured with heavy black edging and lettered “1 (f)”.Zone No 1 (i), Rural (Investigation) Zone—uncoloured with heavy black edging and lettered “1 (i)”.Zone No 1 (r), Rural (Residential) Zone—uncoloured with heavy black edging and lettered “1 (r)”.Zone No 1 (s), Rural (Small Holdings) Zone—uncoloured with heavy black edging and lettered “1 (s)”.Zone No 1 (t), Rural (Tourist) Zone—uncoloured with heavy black edging and lettered “1 (t)”.Zone No 1 (w), Rural (Waterway) Zone—uncoloured with heavy black edging and lettered “1 (w)”.Zone No 1 (y), Rural (West Yamba Rural Residential) Zone—uncoloured with heavy black edging and lettered “1 (y)”.Residential ZonesZone No 2 (a), Residential (Low Density) Zone—uncoloured with heavy black edging and lettered “2 (a)”.Zone No 2 (b), Residential (Medium Density) Zone—uncoloured with heavy black edging and lettered “2 (b)”.Zone No 2 (c), Residential (West Yamba) Zone—uncoloured with heavy black edging and lettered “2 (c)”.Zone No 2 (t), Residential (Tourism) Zone—uncoloured with heavy black edging and lettered “2 (t)”.Business ZoneZone No 3 (a), Business Zone—uncoloured with heavy black edging and lettered “3 (a)”.Industrial ZoneZone No 4 (a), Industrial Zone—uncoloured with heavy black edging and lettered “4 (a)”.Special Uses ZoneZone No 5 (a), Special Uses Zone—uncoloured with heavy black edging and lettered “5 (a)”.Open Space ZonesZone No 6 (a), Open Space Zone—uncoloured with heavy black edging and lettered “6 (a)”.Zone No 6 (b), Proposed Open Space Zone—uncoloured with heavy black edging and lettered “6 (b)”.Zone No 6 (c), Open Space Buffer Zone—uncoloured with heavy black edging and lettered “6 (c)”.Environmental Protection ZonesZone No 7 (a), Environmental Protection (Ecological Significance) Zone—uncoloured with heavy black edging and lettered “7 (a)”.Zone No 7 (b), Environmental Protection (Conservation/Habitat) Zone—uncoloured with heavy black edging and lettered “7 (b)”.Zone No 7 (c), Environmental Protection (Coastal Foreshore) Zone—uncoloured with heavy black edging and lettered “7 (c)”.Zone No 7 (d), Environmental Protection (Residential Habitat) Zone—uncoloured with heavy black edging and lettered “7 (d)”.Zone No 7 (e), Environmental Protection (Escarpment/Scenic) Zone—uncoloured with heavy black edging and lettered “7 (e)”.Zone No 7 (r), Environmental Protection (Riparian) Zone—uncoloured with heavy black edging and lettered “7 (r)”.National Parks ZonesZone No 8 (a), National Parks Zone—uncoloured with heavy black edging and lettered “8 (a)”.Zone No 8 (b), Proposed National Parks Zone—uncoloured with heavy black edging and lettered “8 (b)”.cl 24: Am 2010 (140), Sch 1 [7].
Part 2 Environmental heritage
pt 2: Subst 2008 (53), Sch 1 [3].
25 Heritage conservation
(1) Objectives The objectives of this clause are:(a) to conserve the environmental heritage of Clarence Valley, and(b) to conserve the heritage significance of heritage items and heritage conservation areas including associated fabric, settings and views, and(c) to conserve archaeological sites, and(d) to conserve places of Aboriginal heritage significance.(2) Requirement for consent Development consent is required for any of the following:(a) demolishing or moving a heritage item or a building, work, relic or tree within a heritage conservation area,(b) altering a heritage item or a building, work, relic, tree or place within a heritage conservation area, including (in the case of a building) making changes to the detail, fabric, finish or appearance of its exterior,(c) altering a heritage item that is a building, by making structural changes to its interior,(d) disturbing or excavating an archaeological site while knowing, or having reasonable cause to suspect, that the disturbance or excavation will or is likely to result in a relic being discovered, exposed, moved, damaged or destroyed,(e) disturbing or excavating a heritage conservation area that is a place of Aboriginal heritage significance,(f) erecting a building on land on which a heritage item is located or that is within a heritage conservation area,(g) subdividing land on which a heritage item is located or that is within a heritage conservation area.(3) When consent not required However, consent under this clause is not required if:(a) the applicant has notified the consent authority of the proposed development and the consent authority has advised the applicant in writing before any work is carried out that it is satisfied that the proposed development:(i) is of a minor nature, or is for the maintenance of the heritage item, archaeological site, or a building, work, relic, tree or place within a heritage conservation area, and(ii) would not adversely affect the significance of the heritage item, archaeological site or heritage conservation area, or(b) the development is in a cemetery or burial ground and the proposed development:(i) is the creation of a new grave or monument, or excavation or disturbance of land for the purpose of conserving or repairing monuments or grave markers, and(ii) would not cause disturbance to human remains, relics, Aboriginal objects in the form of grave goods, or to a place of Aboriginal heritage significance, or(c) the development is limited to the removal of a tree or other vegetation that the Council is satisfied is a risk to human life or property, or(d) the development is exempt development.(4) Heritage impact assessment The consent authority may, before granting consent to any development on land:(a) on which a heritage item is situated, or(b) within a heritage conservation area, orrequire a heritage impact statement to be prepared that assesses the extent to which the carrying out of the proposed development would affect the heritage significance of the heritage item or heritage conservation area concerned.(c) within the vicinity of land referred to in paragraph (a) or (b),Note—The website of the Heritage Branch of the Department of Planning has publications that provide guidance on assessing the impact of proposed development on the heritage significance of items (for example, Statements of Heritage Impact).(5) Heritage conservation management plans The consent authority may require, after considering the significance of a heritage item and the extent of change proposed to it, the submission of a heritage conservation management plan before granting consent under this clause.(6) Archaeological sites The consent authority must, before granting consent under this clause to the carrying out of development on an archaeological site (other than land listed on the State Heritage Register or to which an interim heritage order applies), be satisfied that any necessary excavation permit required by the Heritage Act 1977 has been granted.(7) Places of Aboriginal heritage significance The consent authority must, before granting consent under this clause to the carrying out of development in a place of Aboriginal heritage significance:(a) consider the effect of the proposed development on the heritage significance of the place and any Aboriginal object known or reasonably likely to be located at the place, and(b) notify the local Aboriginal communities (in such way as it thinks appropriate) about the application and take into consideration any response received within 21 days after the notice is sent.(8) (Repealed)(9) Conservation incentives The consent authority may grant consent to development for any purpose of a building that is a heritage item, or of the land on which such a building is erected, even though development for that purpose would otherwise not be allowed by this plan if the consent authority is satisfied that:(a) the conservation of the heritage item is facilitated by the granting of consent, and(b) the proposed development is in accordance with a heritage conservation management plan that has been approved by the consent authority, and(c) the consent to the proposed development would require that all necessary conservation work identified in the heritage conservation management plan is carried out, and(d) the proposed development would not adversely affect the heritage significance of the heritage item, including its setting, and(e) the proposed development would not have any significant adverse effect on the amenity of the surrounding area.cl 25: Subst 2008 (53), Sch 1 [3]. Am 2008 (571), Sch 3.107 [8]–[11].
26–30 (Repealed)
cll 26–30: Rep 2008 (53), Sch 1 [3].
Part 3 Rural zone provisions
31 Rural zones applying in this plan, zone objectives and development control table
(1) The following rural zones apply as identified on the map:1 (a) Rural (Agricultural Protection)1 (b) Rural (General Rural Land)1 (f) Rural (Forests)1 (i) Rural (Investigation)1 (r) Rural (Residential)1 (s) Rural (Small Holdings)1 (t) Rural (Tourist)1 (w) Rural (Waterway)(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”, “Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.TableZone No 1 (a) Rural (Agricultural Protection) Zone1 Aim of zoneThe primary aims of this zone are to protect, reserve and encourage the use of land in this zone for agriculture and uses compatible with agriculture.2 Objectives of zoneThe particular objectives of this zone are:(a) to conserve the productive potential of prime crop or pasture land, and(b) to provide for new forms of agricultural development, and changing patterns of existing agricultural development, and(c) to ensure that commercial farming is not affected adversely by incompatible uses which impair its long term sustainability, and(d) to avoid degradation and alienation of prime agricultural land, and(e) to enable rural tourism, which does not adversely affect the productive potential of the land, and(f) to exclude urban development on all prime crop or pasture land, and(g) to restrict the subdivision of prime crop or pasture land, and(h) to encourage conservation in farming practices, and(i) to control the clearing of vegetation and encourage the retention of vegetation.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry); ancillary removal of native vegetation; bushfire control; clearing not included in item 4; dams with a capacity of 2 megalitres or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:aquaculture; bus stations; clear felling; clearing allowed only with consent under clause 40; cluster farming; dams not included in item 3; duplexes; dwelling houses; general stores; home industries; intensive animal husbandry; liquid fuel depots; livestock keeping establishments; professional consulting rooms; roadside stalls; rural industries; rural tourist facilities; rural workers’ dwellings.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; caravan parks; commercial premises; educational establishments; institutions; motor showrooms; places of assembly; recreation vehicle areas; residential flat buildings; restricted premises; shops (other than general stores); taverns; total destination resorts; tourist facilities; transport terminals; units for aged persons; warehouses.Zone No 1 (b) Rural (General Rural Land) Zone1 Aim of zoneThe primary aims of this zone are to reserve rural land and encourage the use of rural land in this zone for agriculture and for uses compatible with agriculture.2 Objectives of zoneThe objectives are:(a) to conserve the productive potential of rural land, and(b) to provide for new forms of agricultural development, and changing patterns of existing agricultural development, and(c) to restrict the subdivision of agricultural land to ensure that suitable land is not withdrawn from production and that the potential for land to be productive is not diminished, and(d) to enable rural tourism, which does not adversely affect the productive potential of the land, and(e) to exclude urban development, and(f) to encourage conservation in farming practices, and(g) to control the clearing of vegetation and encourage the retention of vegetation.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry); ancillary removal of native vegetation; bushfire control; clearing not included in item 4; dams with a capacity of 2 megalitres or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; horticulture; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:aquaculture; bus stations; caravan parks; clear felling; clearing allowed with consent under clause 40; cluster farming; community development; dams not included in item 3; duplexes; dwelling houses; ecotourism facility; environmental education facilities; extractive industries; general stores; home industries; industries; intensive animal husbandry; liquid fuel depots; livestock keeping establishments; mineral sand mining; mining; professional consulting rooms; public buildings; recreation development; recreation establishments; recreation facilities; roadside stalls; rural industries; rural tourist facilities; rural workers’ dwellings; sawmills; stock and sale yards; transport terminals.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; car repair stations; commercial premises; institutions; junk yards; motor showrooms; offensive or hazardous industries; residential flat buildings; restricted premises; shops (other than general stores); taverns; total destination resorts; tourist facilities; units for aged persons.Zone No 1 (f) Rural (Forests) Zone1 Aim of zoneThe primary aim of this zone is to set aside land which is reserved under the Forestry Act 1916.2 Objectives of zoneThe particular objectives of this zone are:(a) to enable the development of land within this zone for forestry purposes, and(b) to enable the development of land for other purposes where it can be demonstrated by the applicant that suitable land or buildings for the proposed purposes are not available elsewhere and that such purposes will not detrimentally affect forestry operations or nearby land.3 Without development consentDevelopment for the purpose of:agriculture (other than horticulture or intensive animal husbandry); any land use authorised by or under the Forestry Act 1916 and any ancillary or incidental land use; bus stops; bushfire control; dams with a capacity of 2 megalitres or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; public utility undertakings.Exempt development.4 Only with development consentDevelopment that will not adversely affect the usefulness of the land for the purposes of forestry.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedAny development not included in item 3 or 4.Zone No 1 (i) Rural (Investigation) Zone1 Aim of zoneThe primary aim of this zone is to set aside land which may be needed in the future for various uses and will be investigated with respect to its suitability and the environmental consequences associated with the release of the land for any particular use.2 Objectives of zoneThe particular objectives of this zone are:(a) to prohibit development which could prejudice the possible future release of land within this zone for conservation or other purposes prior to carrying out detailed investigations, and(b) to permit development where it can be demonstrated by the applicant that suitable land or buildings for the proposed development are not available elsewhere and that such development would not detrimentally affect the potential for the land to be rezoned, or the nature of nearby land.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry); ancillary removal of native vegetation; bushfire control; dams with a capacity of 2 megalitres or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; horticulture; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:clearing allowed with consent under clause 40; dwelling houses; ecotourism facility; home industries; livestock keeping establishments; rural workers’ dwellings.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; bulk stores; industries (other than home industries or rural industries); intensive animal husbandry; liquid fuel depots; motor showrooms; offensive or hazardous industries; restricted premises; sawmills, not including sawmills operated as portable and temporary mills; total destination resorts; tourist facilities; warehouses.Zone No 1 (r) Rural (Residential) Zone1 Aim of zoneThe primary aim of this zone is to provide suitable rural land where residential development may occur.2 Objectives of zoneThe particular objectives of this zone are:(a) to encourage development for the purpose of closer rural settlement on land which is suitable for such a purpose, and(b) to ensure that development maintains the rural character of the locality and minimises disturbance to the landscape through construction of buildings and structures, clearing, earthworks and access roads, and(c) to enable a range of activities and land uses associated with the residential occupation of land, and(d) to discourage or prohibit development not compatible with the predominantly rural nature of the zone, and(e) to encourage rural-residential subdivision which does not place unreasonable and uneconomic demands on the provision or extension of services and facilities, and(f) to adequately protect any areas or sites of conservation value and provide vegetation and fauna corridors.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); ancillary removal of native vegetation; bushfire control; clearing not included in item 4; dams with a capacity of 1 megalitre or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:boarding-houses; bus stations; child care centres; clear felling; clearing allowed only with consent under clause 40; community centres; community development; dams not included in item 3; duplexes; dwelling houses; general stores; home industries; livestock keeping establishments; neighbourhood centres; professional consulting rooms; public buildings; recreation development; recreation establishments; recreation facilities; retail plant nurseries; roadside stalls; rural industries; rural tourist facilities; rural workers’ dwellings.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; bulk stores; industries (other than home industries or rural industries); intensive animal husbandry; liquid fuel depots; motor showrooms; offensive or hazardous industries; restricted premises; sawmills, not including sawmills operated as portable and temporary mills; taverns; total destination resorts; tourist facilities; warehouses.Zone No 1 (s) Rural (Small Holdings) Zone1 Aim of zoneThe primary aim of this zone is to provide suitable rural land where small holdings may be developed in either close proximity to rural-residential subdivision or in areas some distance from rural villages or towns within the local government area of Maclean.2 Objectives of zoneThe particular objectives of this zone are:(a) to encourage development for the purpose of closer rural settlement on lots of a size suitable for small-scale rural activities, and(b) to ensure that development maintains the rural character of the locality and minimises disturbance to the landscape through construction of buildings and structures, clearing, earthworks and access roads, and(c) to enable a range of activities and land uses associated with small-scale rural activities, and(d) to discourage or prohibit development not compatible with the predominantly rural nature of the zone, and(e) to encourage small-scale rural subdivision which does not place unreasonable and uneconomic demands on the provision or extension of services and facilities, and(f) to adequately protect any areas or sites of conservation value and provide vegetation and fauna corridors.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); ancillary removal of native vegetation; bushfire control; clearing not included in item 4; dams with a capacity of 1 megalitre or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:boarding-houses; bus stations; child care centres; clear felling; clearing allowed only with consent under clause 40; community centres; community development; dams not included in item 3; duplexes; dwelling houses; ecotourism facility; general stores; home industries; livestock keeping establishments; neighbourhood centres; professional consulting rooms; public buildings; recreation development; recreation establishments; recreation facilities; retail plant nurseries; roadside stalls; rural industries; rural tourist facilities; rural workers’ dwellings.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; car repair stations; intensive animal husbandry; junk yards; offensive or hazardous industries; motor showrooms; restricted premises; sawmills not including sawmills operated as portable and temporary mills; taverns; total destination resorts; tourist facilities.Zone No 1 (t) Rural (Tourist) Zone1 Aim of zoneThe primary aim of this zone is to promote tourism as a major contributor to the diversification and strength of the local government area of Maclean.2 Objectives of zoneThe particular objectives of this zone are:(a) to encourage tourism activity that will complement the existing natural and constructed features of the area and be of benefit to the area’s economy, and(b) to encourage a range of tourist facilities in the area in localities where it would not result in the degradation of environmental or agricultural features of the area, and(c) to encourage the location of tourist facilities so that they may benefit from existing road services, physical service infrastructure, other tourist attractions, natural features and urban facilities, and(d) to permit tourism development and uses associated with, ancillary to, or supportive of, tourism development, including retailing and service facilities where such facilities are an integral part of the tourism development and are of a scale appropriate to the needs of that development.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); ancillary removal of native vegetation; bushfire control; clearing not included in item 4; dams having a capacity of 1 megalitre or less, or dams requiring licensing under Part 2 of the Water Act 1912; flood mitigation works; forestry; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:boarding-houses; bus stations; caravan parks; child care centres; clear felling; clearing allowed only with consent under clause 40; clubs; commercial premises; community development; dams not included in item 3; dredging; duplexes; dwelling houses; ecotourism facility; environmental education facilities; helipads; heliports; horticulture; hotels; livestock keeping establishments; maintenance dredging; marinas; motels; neighbourhood centres; public buildings; recreation development; recreation establishments; recreation facilities; serviced apartments; shops; taverns; tourist facilities.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:aquaculture; brothels; bulk stores; extractive industries; industries; intensive animal husbandry; junk yards; liquid fuel depots; motor showrooms; offensive or hazardous industries; restricted premises; rural industries; sawmills, not including sawmills operated as portable and temporary mills; stock and sale yards; total destination resorts; warehouses.Zone No 1 (w) Rural (Waterway) Zone1 Aim of zoneThe primary aim of this zone is to identify and protect land which constitutes a fish habitat.2 Objectives of zoneThe particular objectives of this zone are:(a) to enable the development of land within this zone for recreational and commercial fishing purposes on sound ecological principles, and(b) to enable the carrying out of works related to the commercial and recreational fishing use of the Clarence River and its tributaries, and(c) to enable the carrying out of public utility undertakings, being water transport undertakings or wharf or river undertakings, and(d) to enable the recreational use of the Clarence River and its tributaries within this zone, and(e) to protect the ecological and aesthetic values of waterways within this zone, and(f) to enable tourism and other commercial activities which will have no detrimental impact on the ecological and aesthetic values of waterways within this zone.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; commercial fishing; flood mitigation works; jetties with a maximum of 2 vessels used for private use; maintenance dredging; public utility undertakings; recreational fishing; water based recreational uses (except water based recreational activities involving the use of hired equipment other than boats hired for recreational fishing purposes).4 Only with development consentAny development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises.cl 31, table: Am 11.1.2002; 14.6.2002; 7.3.2003.
32 Subdivision of land within rural zones
(1) This clause applies to the subdivision of land within Zone No 1 (a), 1 (b) or 1 (i).(2) In the case of land within Zone No 1 (a), 1 (b) or 1 (i) that the consent authority is satisfied will be used for the purpose of commercial farming or aquaculture, the minimum area of land capable of being used for those purposes within each allotment to be created by the subdivision is to be not less than:(a) 50 hectares, if the allotment is to be used for agriculture, and(b) 20 hectares, if the allotment is to be used for aquaculture, and(c) 40 hectares, if the allotment is to be used for sugarcane farming.(3) Notwithstanding subclause (2), consent may be granted to the adjustment of the boundaries between two lots on land in Zone No 1 (a) or 1 (b) to create one small and one large lot provided:(a) no additional allotments are created, and(b) no additional dwelling entitlements are created, and(c) at the time of the subdivision under this subclause, a dwelling house exists on the land comprising the smaller allotment to be created, and(d) it can be demonstrated that the subdivision will result in an increase in the potential agricultural productivity or economic viability of the land overall, and(e) the land comprising the larger lot to be created by the subdivision is and will, after the subdivision, be required to be used for the purpose of commercial farming or aquaculture, and(f) one allotment created by the subdivision meets the requirements of subclause (2), and(g) one allotment created under the provisions of this subclause has an area of no more than 1.5 hectares, and(h) a minimum buffer of 50 metres exists between the dwelling house on the smaller lot and any boundary with any property used for agriculture or aquaculture, and(i) the subdivision is not of an allotment already created under this subclause.(4) In deciding whether to grant consent to a subdivision to which this clause applies, the consent authority shall take the following matters into consideration:(a) the area and quality of each proposed allotment and its potential agricultural productivity,(b) the likely effects (both economic and otherwise) that the proposed subdivision will have on agricultural industries in the locality and the resources employed by or in connection with those industries,(c) the likely effects (both economic and otherwise) that the proposed subdivision will have on the use and development of other land and resources in the locality,(d) whether there are any reasonable alternatives to the proposed subdivision in the circumstances,(e) the effect of the existence of, or the erection of, a dwelling,(f) the cumulative effect of similar proposals if consent is granted for allotments that comply with subclause (2),(g) the likelihood of each proposed allotment remaining available for efficient agricultural use,(h) any relevant matter established by a development control plan that applies to the land,(i) the availability of access and the provision of services to each proposed allotment.
33 Subdivision of land within two or more zones
(1) If an allotment of land is partly within a rural zone and partly within an environmental protection zone, consent may be granted to a subdivision of the allotment only if:(a) the requirements for subdivision in the rural zone are met for the land within that zone, and(b) any building to be erected on the land is located within the rural zone, or on an allotment of not less than 100 hectares in an environmental protection zone.(2) If an allotment of land is partly within a rural zone and partly within an environmental protection zone, consent must not be granted to a subdivision of the land which creates an allotment wholly within an environmental protection zone unless:(a) the allotment created has an area of not less than 100 hectares, and(b) the consent authority has taken the matters listed in clause 58 (3) into consideration.(3) If an allotment of land is partly within a rural zone and partly within a residential zone, consent may be granted to a subdivision of the allotment only if:(a) the requirements for subdivision in the residential zone are met for the land within that zone, and(b) any building to be erected on the land is located within the residential zone, or on an allotment that complies with clause 32 (2) within a rural zone.(4) If an allotment of land is partly within a rural zone and partly within a residential zone, consent must not be granted to a subdivision of land which creates an allotment wholly within a rural zone unless:(a) the allotment created satisfies the requirements of clause 32 for allotments in rural zones, and(b) the consent authority has taken the matters listed in clause 32 (4) into consideration.(5) This clause does not apply to land to which Part 8 applies.cl 33: Am 2010 (140), Sch 1 [8].
34 Subdivision in rural zones otherwise than for the purpose of commercial farming, dwelling houses, duplexes, forestry or rural workers’ dwellings
(1) Where land within a rural zone:(a) was lawfully used before the appointed day for a purpose other than commercial farming, a dwelling house, a duplex, forestry or a rural worker’s dwelling, orconsent may be granted to the subdivision of that land if the consent authority is satisfied that the allotment created by the subdivision will be used for the purpose for which it was lawfully used before the appointed day or allowed by the consent.(b) may be lawfully used for a purpose other than commercial farming, a dwelling house, a duplex, forestry or a rural worker’s dwelling by reason of a development consent granted in respect of that use,(2) This clause does not apply to land to which Part 8 applies.cl 34: Am 2010 (140), Sch 1 [9].
35 Subdivision of land within Zones Nos 1 (r) and 1 (s)
(1) Consent may be granted to the subdivision of land in Zone No 1 (r) or 1 (s) only where the consent authority is satisfied that the land is capable of being used for the purpose of erecting a dwelling house or a duplex and the area of the allotment to be created by the subdivision is not less than:(a) 4,000 square metres within Zone No 1 (r), or(b) 1.5 hectares within Zone No 1 (s).(2) The total number of lots created under this clause in any five year period shall not exceed the number specified by the Council in accordance with the Maclean Shire Council Land Release Strategy, a copy of which is deposited in the office of the Council.cl 35: Am 2008 (571), Sch 3.107 [12].
36 Dwelling houses and duplexes in rural zones
(1) Consent must not be granted to the erection of a dwelling house or a duplex on an allotment of land in a rural zone unless that allotment:(a) has an area of not less than 40 hectares, or(b) comprises an allotment created by a subdivision in accordance with clause 32, 33 or 35, or(c) comprises an allotment on which a dwelling house could have been erected immediately prior to the appointed day and which could have been created in accordance with the provisions of clause 32, 33 or 35 if those provisions were in force at the time that the allotment was created, or(d) comprises an allotment of land that was consented to or approved by the Council prior to the appointed day and on which a dwelling house could have been lawfully erected immediately prior to the appointed day.(2) This clause does not apply to land that is within a rural zone and to which Part 8 applies.cl 36: Am 2010 (140), Sch 1 [10].
37 Rural workers’ dwellings
(1) On an allotment of land used for commercial farming within a rural zone consent may be granted to the erection of a rural worker’s dwelling, or the alteration of an existing dwelling house or building so as to create a rural worker’s dwelling, provided:(a) the consent authority is satisfied that the purpose for which the allotment is to be used could not be fully realised without the presence on that land of an additional residence, and(b) the proposed use of the land generates sufficient income to support both the owner and additional employee, and(c) no additional access to a public road is required from the land, and(d) in the opinion of the consent authority, the additional dwelling to be erected will promote the objectives of the zone, and(e) in the opinion of the consent authority, any proposed dwelling will not interfere with the purpose for which the land and neighbouring land is being used, either through the alienation of productive resources or creating the potential for conflict, and(f) the additional dwelling is to be of a transportable type so that the dwelling can be removed and relocated should the additional dwelling be no longer essential for the efficient and productive operation of the farm.(2) Consent shall not be granted to the subdivision of land on which an additional dwelling house has been erected in pursuance of this clause except in accordance with this plan.(3) This clause does not apply to land that is within a rural zone and to which Part 8 applies.cl 37: Am 2010 (140), Sch 1 [11].
38 Development within Mangrove Creek Catchment Area
(1) The Mangrove Creek Catchment Area is shown by diagonal hatching on the map. All development in this area, other than on land within Zone No 1 (f), requires development consent.(2) Consent must not be granted to the carrying out of development on land within the Mangrove Creek Catchment Area unless the consent authority has determined that the impact of the development on the quality of water in any waterway within or passing through the area would not be adverse. In determining the impact the following should be considered:(a) the risk of soil erosion, and(b) the risk of water pollution, and(c) any potential for siltation.(3) (Repealed)(4) The Forestry Commission of New South Wales shall notify the Council of any substantial development it proposes to carry out on the land to which this clause applies and may carry out the development only after taking into consideration any comments received from the Council within 28 days after the notice was sent.cl 38: Am 2008 (571), Sch 3.107 [13].
39 Special Emphasis Areas
(1) Special Emphasis Areas are shown by horizontal hatching on the map. The aim of this clause is to ensure that the wetlands identified as Special Emphasis Areas are preserved and conserved.(2) All development in the Special Emphasis Areas, with the exception of uses listed in subclause (3), requires consent.(3) A person may, without consent, ringbark, cut down, lop, top, injure or destroy any tree on land to which this clause applies which:(a) is less than 2 metres high and has a girth of less than 0.15 metre at a height of 0.4 metre from the ground, orunless the tree:(b) is dying, dead or has become dangerous,(c) is a protected native plant within the meaning of the National Parks and Wildlife Act 1974, or(d) is on State protected land within the meaning of the Native Vegetation Conservation Act 1997, or(e) is located within 20 metres of a watercourse.(4) Consent must not be granted to development within a Special Emphasis Area for the purpose of a building.(5) In determining a development application that proposes development on land within a Special Emphasis Area, the consent authority must consider the following matters:(a) the environmental effects of the proposed development, including the effects on:(i) the growth of native plant communities, and(ii) the survival of native wildlife populations, and(iii) the provision and quality of habitats for both indigenous and migratory species, and(iv) the surface and groundwater characteristics of the site on which the development is proposed to be carried out and of the surrounding area, including acidity, salinity and water quality,(b) whether feasible alternatives to the proposed development (either on other land or by other means) exist,(c) whether adequate safeguards and rehabilitation measures have been or will be taken in respect of the effect of the proposal on the wetland,(d) whether the development is essential for the reasonable economic use of the land, the provision of utility services or to reduce the risk of bushfires,(e) whether the development is proposed to be carried out in a manner which minimises:(i) visual and scenic impact, and(ii) the risk of soil erosion (including erosion by wind), and(iii) the risk of water pollution, through increased siltation or otherwise, and(iv) the destruction of rare or locally important vegetation systems,(f) the public interest (if any) in the carrying out of the proposal compared with the public interest in the preservation of the wetland.
40 Clearing controls
(1) On land within Zone No 1 (a) or 1 (b), clearing of native vegetation in the following circumstances requires consent:(a) clear felling, or(b) clearing within 20 metres of a watercourse, either tidal and non-tidal, or(c) clearing of trees protected by a tree preservation order.(2) On land within Zone No 1 (i), 1 (r), 1 (s) or 1 (t), all clearing of native vegetation requires consent, other than clearing authorised under the Rural Fires Act 1997 or the State Emergency and Rescue Management Act 1989, or clearing according to a bush fire management plan under the Rural Fires Act 1997.(3) For the purposes of this clause, clearing does not include:(a) ancillary removal of native vegetation, or(b) clearing required in association with flood mitigation works.Note—Development consent for clearing may be required under the Native Vegetation Conservation Act 1997. Consult with the Department of Land and Water Conservation regarding requirements.
41 Rural tourist facility controls
(1) Consent must not be granted to the carrying out of development for the purpose of a rural tourist facility unless:(a) any tourist accommodation to be provided is ancillary to the principal and continuing use of the land for the purpose of agriculture and guests can take part in the carrying on of the agricultural activity, and(b) the development is compatible with existing and neighbouring land uses and is, wherever possible, either located on land which is not prime crop or pasture land or is contained within a small area, and(c) the maximum accommodation capacity is 20 persons.(2) A rural tourist facility shall not provide permanent accommodation.(3) Consent must not be granted to the carrying out of development on land for the purpose of a rural tourist facility unless the consent authority has considered the following matters:(a) the natural features and ecosystems worthy of preservation or protection within or adjacent to the land, and(b) the siting and design of the development so as to ensure that the development is not detrimental to the visual and social amenity of the area, and(c) the adequacy of water and sewerage services for the development, and(d) any significant environmental hazards.(4) Consent must not be granted to the subdivision of land used as a rural tourist facility.
42 Development within Zone No 1 (i)
Consent must not be granted to the carrying out of development on land within Zone No 1 (i) unless the consent authority has considered the following matters in relation to the future use of the land:(a) the land capability of the land, and(b) the demand for the development of the land, and(c) whether the land can be serviced with water, sewerage and local roads, and the likely future road network, and(d) the Clarence Valley Settlement Strategy available from the office of the Council, and(e) the conservation value of the land.
43 Development of land for mineral sand mining
(1) This clause applies to land within Zone No 1 (a), 1 (b), 1 (f), 1 (i), 1 (r) or 1 (s).(2) (Repealed)(3) In determining whether to grant consent for the purpose of mineral sand mining, the Council must take into consideration the likelihood of the proposed development:(a) adversely affecting the behaviour, or being adversely affected by the behaviour, of the sea or an arm of the sea or any bay, inlet, lagoon, lake, body of water, river, stream or watercourse, or(b) adversely affecting any beach or dune or the bed, bank, shoreline, foreshore, margin or floodplain of the sea or any bay, inlet, lagoon, lake, body of water, river, stream or watercourse, or(c) adversely affecting the landscape, vegetation or scenic quality of the locality.cl 43: Am 2008 (571), Sch 3.107 [14] [15].
44 Development of certain land at Brooms Head within Zone No 1 (i)
(1) This clause applies to land in the vicinity of Cakora Point, Brooms Head, within Zone No 1 (i), as shown by diagonal hatching on the map.(2) Consent must not be granted to the subdivision of land to which this clause applies unless a reticulated sewage treatment and effluent disposal system or other sewage treatment and effluent disposal system approved by the Council will be provided to each allotment to be created by that subdivision or arrangements satisfactory to the Council have been made for the provision of that system.cl 44: Am 2008 (571), Sch 3.107 [16].
45 Economic geological resources
(1) This clause applies to:(a) development on land within Zone No 1 (a), 1 (b), 1 (f), 1 (t) or 1 (w) recorded at the office of the Council as having potential peat deposits, sand (including heavy mineral, construction and silica sand), Walloon coal measures (outcrop) and Redcliff coal measures (outcrop), and(b) development which the Council considers would adversely affect or compromise the extraction of a geological resource described in paragraph (a).(2) (Repealed)(3) The consent authority, in deciding whether to grant consent to development to which this clause applies, shall take into consideration the following matters:(a) (Repealed)(b) the likelihood of the proposed development adversely affecting, or being adversely affected by, the geological resource,(c) the likelihood of the proposed development, when considered in aggregation with all development affecting the geological resource, adversely affecting the geological resource,(d) the potential for the geological resource to be extracted prior to or concurrently with the development,(e) the extent to which the development will compromise the potential for extraction of the geological resource.(4) The consent authority may decline to grant a development application for consent to the carrying out of development to which this clause applies unless it has considered a geological survey, prepared by a qualified and experienced geologist. The survey shall be carried out in consultation with the Council and shall contain such information as is specified by the Council.cl 45: Am 2008 (571), Sch 3.107 [17]–[20].
45A Development of land for ecotourism
(1) Consent must not be granted to development for the purpose of an ecotourism facility unless the consent authority is satisfied of each of the following:(a) that a management plan has been submitted with the development application that demonstrates that the development will be for the purpose of ecotourism,(b) that the facilities to be provided on the land or on nearby land will enable people to experience natural areas,(c) that the development will not adversely affect any natural areas with high conservation value,(d) that the development will have minimal impact on natural areas,(e) that any buildings that are to be part of the development will be located on the least environmentally sensitive areas of the land,(f) that the developer will restore habitat areas on the land,(g) that the only permanent accommodation on the land will be for people managing or operating the ecotourism facilities,(h) that the development will not adversely affect the existing agricultural productivity of the land or nearby land.(2) In this clause, natural areas means land where natural processes are maintained and natural ecosystems continue to exist to some extent and have some capacity for self-regeneration.cl 45A: Ins 7.3.2003.
Part 4 Residential, business and industrial zone provisions
46 Residential, business and industrial zones applying in this plan, zone objectives and development control table
(1) The following residential, business and industrial zones apply as identified on the map:2 (a) Residential (Low Density)2 (b) Residential (Medium Density)2 (t) Residential (Tourism)3 (a) Business4 (a) Industrial(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”, “Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.TableZone No 2 (a) Residential (Low Density) Zone1 Aim of zoneThe primary aim of this zone is to enable the provision of housing, characterised by low density residential development.2 Objectives of zoneThe particular objectives of this zone are to enable:(a) the provision of low density housing, and(b) a residential environment free from any adverse impact from commercial and industrial uses, and(c) the provision of community uses, such as child care centres, of a compatible scale, bulk, height and design, which do not detract from the amenity and character of the residential area, and(d) adequate provision for water and effluent disposal.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; flood mitigation works; jetties with a maximum of 2 vessels used for private use; maintenance dredging; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:child care centres; clearing; cluster housing; dual occupancies; dwelling houses; home industries; places of public worship; professional consulting rooms; utility installations (other than gas holders or generating works).Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:advertisements, excluding business identification signs; advertising structures, excluding those displaying business identification signs.Any other development not included in item 3 or 4.Zone No 2 (b) Residential (Medium Density) Zone1 Aim of zoneThe primary aim of this zone is to enable medium density housing in order to provide a range of housing options to meet different housing needs within the community.2 Objectives of zoneThe particular objectives of this zone are:(a) provision of well designed housing at a higher residential density than in Zone No 2 (a), and(b) location of medium density housing in areas close to services and facilities, including recreational, community, commercial and employment opportunities, and(c) provision of community facilities, such as child care centres, of a compatible scale, bulk, height and design, which do not detract from the amenity and character of the residential area, and(d) a medium density residential environment free from any adverse impact of commercial and industrial uses, and(e) adequate provision for water and effluent disposal.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:child care centres; clearing; cluster housing; dual occupancies; dwelling houses; home industries; places of public worship; professional consulting rooms; residential flat buildings; utility installations (other than gas holders or generating works).Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:advertisements, excluding business identification signs; advertising structures, excluding those displaying business identification signs.Any other development not included in item 3 or 4.Zone No 2 (t) Residential (Tourism) Zone1 Aim of zoneThe primary aim of this zone is to enable the provision of tourist facilities and high density residential accommodation and associated facilities.2 Objectives of zoneThe particular objectives of this zone are:(a) development of a diverse tourism industry to strengthen the local economic base of the local government area of Maclean, which does not detract from the natural, social and built environment, and(b) provision of tourist facilities, recreation facilities and high density residential development and associated uses without adverse impact on surrounding development, and(c) provision of employment opportunities and economic benefits, and(d) adequate provision for water and effluent disposal.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:advertisements; advertising structures; caravan parks; child care centres; clearing; clubs; dual occupancies; dwelling houses; guest houses; home industries; hotels; marinas; motels; professional consulting rooms; recreation establishments; recreation facilities; refreshment rooms; residential flat buildings; tourist facilities.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:livestock keeping establishments; total destination resorts.Zone No 3 (a) Business Zone1 Aim of zoneThe primary aim of this zone is to enable the provision of a range of retail and commercial activities and employment opportunities to meet the needs of the local government area’s population and visitors.2 Objectives of zoneThe particular objectives of this zone are:(a) well designed commercial and retail development which will enhance the appearance, function and viability of commercial and retail areas, and(b) to provide development which is associated with, ancillary to, or supportive of, commercial or retail development, and(c) adequate provision for water and effluent disposal.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; clearing; flood mitigation works; jetties with a maximum of 2 vessels used for private use; open space; public utility undertakings; roads.Exempt development.4 Only with development consentDevelopment for the purpose of:advertisements; advertising structures; bus stations; car parking; car repair stations; child care centres; clubs; commercial premises; community centres; dwelling houses, dual occupancies and residential flat buildings, but only in conjunction with shops or commercial premises; educational establishments; home industries; hotels; motels; motor showrooms; places of assembly; places of public worship; professional consulting rooms; public buildings; recreation facilities; refreshment rooms; restricted premises; service stations; shops; tourist facilities.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels.Zone No 4 (a) Industrial Zone1 Aim of zoneThe primary aim of this zone is to enable industrial development and related uses which produce a range of goods and services and provides employment without adversely affecting adjoining land, or air or water quality.2 Objectives of zoneThe particular objectives of this zone are:(a) development for industrial purposes and other purposes which are ancillary or supportive of existing or future industrial development, and(b) development for the purpose of bulky goods retailing and warehousing, and(c) industrial development which does not pollute or adversely affect adjoining land, air or water quality or the health, or safety of residents, and(d) adequate provision for water and effluent disposal.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:advertisements; advertising structures; brothels; bulk stores; bulky goods retailing; bus depots; bus stations; car repair stations; caretakers’ dwellings; clearing, commercial premises; general stores; industries other than offensive or hazardous industries or extractive industries; junk yards; light industries; liquid fuel depots; motor showrooms; offices ancillary to another permissible use; places of public worship; plant depots; recreation establishments; recreation facilities; restricted premises; retail plant nurseries; rural industries; service stations; transport terminals; warehouses; utility installations.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:extractive industries; offensive and hazardous industries.cl 46, table: Am 11.1.2002; 14.6.2002; 26.7.2002; 2005 (154), cl 4.
47 Subdivision controls in residential, business and industrial zones
All subdivisions in any residential, business or industrial zone which are not exempt development require development consent.
48 Subdivision of land within two or more zones
(1) If an allotment of land is partly within a rural zone and partly within a residential zone, consent may be granted to the subdivision of the allotment only if:(a) the requirements for subdivision in the residential zone are met for the land within that zone, and(b) any building to be erected on the land is located within the residential zone, or on an allotment that complies with clause 32 (2) within a rural zone.(2) If an allotment of land is partly within a rural zone and partly within a residential zone, consent must not be granted to a subdivision of land which creates an allotment wholly within a rural zone unless:(a) the allotment created satisfies the requirements of clause 32 for allotments in rural zones, and(b) the consent authority has taken the matters listed in clause 32 (4) into consideration.(3) If an allotment of land is partly within a residential zone and partly within an environmental protection zone, consent may be granted to a subdivision of the allotment only if:(a) the requirements for subdivision in the residential zone are met for the land within that zone, and(b) any building to be erected on the land is located within the residential zone, or on an allotment of not less than 100 hectares in an environmental protection zone.(4) If an allotment of land is partly within a residential zone and partly within an environmental protection zone, consent must not be granted to a subdivision of the land which creates an allotment wholly within an environmental protection zone unless:(a) the allotment created has an area of not less than 100 hectares, and(b) the consent authority has taken the matters listed in clause 58 (3) into consideration.(5) This clause does not apply to land to which Part 8 applies.cl 48: Am 2010 (140), Sch 1 [12].
49 Development of land within Zone No 3 (a)—River Street, Maclean, between Wharf Street and Howard Street (Main Street Precinct)
(1) A person must not, without consent, alter or demolish a building or part of a building fronting River Street within Zone No 3 (a), except where the proposed development is consistent with the Maclean Centre Development Control Plan adopted by the Council on 14 June 2000.(2) Consent must not be granted for any redevelopment proposals for such buildings, including proposals for new fenestration and signage, unless the consent authority is satisfied that the redevelopment will be consistent with the principles of the Maclean Centre Development Control Plan adopted by the Council on 14 June 2000.(3) Redevelopment of the site consisting of Lot 69 DP 305625 and Lots 1 and 2 DP 592739 should incorporate the following principles:(a) provision of an attractive facade incorporating active retail uses at the ground floor fronting River Street,(b) refurbishment of the historic western facade and opening up of this part of the site fronting the river,(c) provision of mixed uses, including shops, cafes, restaurants and offices.
50 Development of land within Zone No 3 (a)—River Street, Maclean, between Cameron and Wharf Streets (Southern Town Approach)
Consent must not be granted to development on land within Zone No 3 (a) situated at River Street, Maclean, between Cameron Street and Wharf Street, unless the consent authority:(a) is satisfied that the development is in harmony with the streetscape of that locality and its function as an entry point to the town centre, having regard to the bulk, height, design and roof form of, and the materials to be used in, any proposed building, and to signage and use of residential setbacks in relation to the proposed development, and(b) has considered how refurbishment of any older style of existing dwelling can be encouraged.
51 Development of land within Zone No 3 (a)—16 Wooli Street, Yamba
The alteration, removal or demolition of the existing church building on land within Zone No 3 (a), being Lot 13 DP 8280 and known as 16 Wooli Street, Yamba, is not to be carried out without development consent.
52 Development of certain land at Brooms Head and Iluka
(1) This clause applies to land in the vicinity of Cakora Point, Brooms Head and Iluka, as shown by diagonal hatching on the map.(2) Consent must not be granted to the subdivision of land to which this clause applies unless a reticulated sewage treatment and effluent disposal system or other sewage treatment and effluent disposal system, approved by the Council, will be provided to each allotment to be created by that subdivision or arrangements satisfactory to the Council have been made for the provision of that system.cl 52: Am 2008 (571), Sch 3.107 [21].
Part 5 Special use and open space zone provisions
53 Special use and open space zones applying in this plan, zone objectives and development control table
(1) The following special use and open space zones apply as identified on the map:5 (a) Special Uses6 (a) Open Space6 (b) Proposed Open Space6 (c) Open Space Buffer(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”, “Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.TableZone No 5 (a) Special Uses Zone1 Aim of zoneThe primary aim of this zone is to set aside land held, used or intended for acquisition for a particular public or community purpose.2 Objectives of zoneThe particular objectives of this zone are:(a) to recognise existing public land use requirements, and(b) to enable further land to be utilised for public use as the demand warrants it, and(c) to enable the development of land for other purposes where it can be demonstrated by the applicant that the proposed purposes will not affect the usefulness of the land for the purpose for which the land has been zoned, and(d) to enable the development of uses ancillary or incidental to the purposes for which land within the zone is used.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; clearing not included in item 4; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings.Exempt development.4 Only with development consentDevelopment for the purpose of:clearing allowed only with consent by a tree preservation order; community purposes; the land use indicated on the map in brackets and any land use ancillary or incidental to the indicated land use.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises.Zone No 6 (a) Open Space Zone1 Aim of zoneThe primary aim of this zone is to set aside land that is currently used or is available to be used for the purposes of public open space.2 Objectives of zoneThe particular objectives of this zone are:(a) to ensure that there is adequate provision of open space to meet the present open space and recreational needs of all residents, and(b) to enable the development of land within this zone for purposes associated with recreation, and(c) to provide opportunities to enhance the total environmental quality of the local government area of Maclean, and(d) to ensure that there is adequate provision of both active and passive open space to serve the present and future recreational needs of residents and visitors.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; clearing not included in item 4; drainage; jetties with a maximum of 2 vessels used for private use; public utility undertakings; roads; works for the purposes of landscaping or gardening.Exempt development.Recreation development.4 Only with development consentDevelopment for the purpose of:clearing allowed only with consent by a tree preservation order, flood mitigation works, recreation facilities.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises.Zone No 6 (b) Proposed Open Space Zone1 Aim of zoneThe primary aim of this zone is to set aside land that is proposed to be used for public open space purposes.2 Objectives of zoneThe particular objectives of this zone are:(a) to reserve land which will be dedicated or required for public open space or public recreation purposes, and(b) to prevent the development of land within this zone for purposes that may jeopardise its future use as public open space, and(c) to ensure that there is an adequate provision of open space to meet both present and likely future open space and recreational needs of all residents, and(d) to provide opportunities to enhance the total environmental quality of the local government area of Maclean, and(e) to enable the development of land for other purposes where it can be demonstrated by the applicant that the proposed purposes will not affect the long term usefulness of the land for recreation.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; clearing not included in item 4; drainage; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings; works for the purpose of landscaping or gardening.Exempt development.Recreation development.4 Only with development consentDevelopment for the purpose of:clearing allowed only with consent by a tree preservation order; recreation facilities.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises.Zone No 6 (c) Open Space Buffer Zone1 Aim of zoneThe primary aim of this zone is to set aside land, whether in public or private ownership, which will act as a buffer between main or arterial roads and development associated with town or village areas.2 Objectives of zoneThe particular objectives of this zone are:(a) to prohibit access from main or arterial roads to adjoining land, and(b) to prevent the development of land within this zone for purposes that may jeopardise the movement of traffic safely along the adjoining main or arterial road, and(c) to enable the development of land within this zone for the purpose of public utility undertakings or utility installations.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; clearing not included in item 4; flood mitigation works; jetties with a maximum of 2 vessels used for private use; public utility undertakings; utility installations (other than gas holders or generating works); works involved in gardening or landscaping.Exempt development.4 Only with development consentDevelopment for the purpose of:clearing allowed only with consent by a tree preservation order.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedAny development not included in item 3 or 4.cl 53, table: Am 11.1.2002.
54 Subdivision controls in special use and open space zones
All subdivisions in any special use or open space zone which are not exempt development require development consent.
55 Acquisition of land zoned for open space purposes
(1) The owner of land within Zone No 6 (b) or 6 (c) may, by notice in writing, require the Council to acquire the land.(2) On receipt of a notice the Council shall acquire the land.(3) The Council is not required to acquire land, the subject of a notice referred to in subclause (1), if the land is required to be dedicated to the Council as a condition of an existing development consent or subdivision approval.(4) Nothing in subclause (2) requires the Council to acquire land within Zone No 6 (b) while a consent is in force to the carrying out of development on that land.(5) Notwithstanding subclause (2) and without affecting subclause (3), the Council is not required to acquire land the subject of a notice referred to in subclause (1) unless:(a) a development application has, since the land last became subject to this clause, been made in respect of the land, and(b) the development the subject of the development application consists of development for a purpose for which development could have been carried out on the land (whether or not with development consent) immediately before the land last became subject to this clause, and(c) the Council has refused its consent to the development application.
56 Community use of schools
Nothing in this plan prevents, with the consent of the Council:(a) the community use of the facilities and sites of schools, colleges and other educational institutions, or(b) the commercial operation of those facilities and sites, or(c) the carrying out of development for the purpose of community uses on land used for the purpose of schools, colleges or other educational institutions, whether or not the development is ancillary to any such purpose.
Part 6 Environmental protection zone provisions
57 Environmental protection zones applying in this plan, zone objectives and development control table
(1) The following environmental protection zones apply as identified on the map:7 (a) Environmental Protection (Ecological Significance)7 (b) Environmental Protection (Conservation/Habitat)7 (c) Environmental Protection (Coastal Foreshore)7 (e) Environmental Protection (Escarpment/Scenic)(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”, “Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.TableZone No 7 (a) Environmental Protection (Ecological Significance) Zone1 Aim of zoneThe primary aim of this zone is to identify, protect and conserve land which is of particular ecological significance.2 Objectives of zoneThe particular objectives of this zone are:(a) to identify all land within the local government area of Maclean covered by State Environmental Planning Policy No 14—Coastal Wetlands and State Environmental Planning Policy No 26—Littoral Rainforests, and(b) to preserve estuarine wetlands and allow them to continue to function as feeding and breeding areas for wildlife, shellfish and fish, and(c) to prohibit development within the zone that is likely to have a detrimental effect on the habitat or landscaping qualities or the flood mitigation function of the wetlands, and(d) to prohibit the clearing of land, except for the careful control of noxious plants by means not likely to be significantly detrimental to the native ecosystem, and(e) to enable the development of land within this zone only where it can be shown that the development will not destroy, damage or compromise the ecological, scenic or scientific attributes of the land.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; commercial fishing; recreational fishing.4 Only with development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); boat landings (not including boat launching facilities); boat launching facilities or picnic grounds, with associated access roads and parking areas, on land above the usual water level not requiring clear felling; bushfire control; camping on land above the usual water level; clearing; environmental education facilities; home industries; jetties with a maximum of 2 vessels used for private use; protection of the existing ecological environment; public utility undertakings; roads; walkways raised above the ground or water surface, or both, where necessary; utility installations.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises.Zone No 7 (b) Environmental Protection (Conservation/Habitat) Zone1 Aim of zoneThe primary aim of this zone is to identify, protect and conserve vegetation and wildlife habitats.2 Objectives of zoneThe particular objectives of this zone are:(a) to prohibit development within the zone which would adversely affect the habitat and conservation value of the land, and(b) to enable the development of land within this zone which would not have an adverse effect on the wildlife habitat.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation.4 Development permissible only with development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); bushfire control; clearing; environmental education facilities; jetties with a maximum of 2 vessels used for private use; public utility undertakings; recreational land uses; roads; utility installations.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedAny other development not included in item 3 or 4.Zone No 7 (c) Environmental Protection (Coastal Foreshore) Zone1 Aim of zoneThe aim of this zone is to identify and protect environmentally sensitive coastal land.2 Objectives of zoneThe objectives of this zone are:(a) to enable development for certain purposes where such development does not have a detrimental effect on the habitat, landscape or scenic quality of the locality, and(b) to prevent development which would adversely affect, or be adversely affected in both the long and short term by, coastal processes, and(c) to protect coastal ecosystem diversity and stability.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation.4 Only with development consentDevelopment for the purpose of:agriculture; camping grounds; clearing; dams; drainage; forestry; golf courses; home industries; jetties with a maximum of 2 vessels used for private use; mining; public utility undertakings; roads; utility installations (other than gas holders or generating works).Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedAny development not included in item 3 or 4.Zone No 7 (e) Environmental Protection (Escarpment/Scenic) Zone1 Aim of zoneThe primary aims of this zone are:(a) to identify and protect land of high scenic or landscape conservation value in the local government area of Maclean, and(b) to minimise soil erosion from the escarpment areas and prevent development in geologically hazardous areas.2 Objectives of zoneThe particular objectives of this zone are:(a) to encourage the protection or preservation of the major scenic resources of the local government area of Maclean, and(b) to prohibit development within the zone that is likely to have a visually disruptive effect on the scenic quality and visual amenity of that area, and(c) in areas of high visual exposure or high scenic quality, to control the choice and colour of building materials, the position and bulk of buildings, access roads and landscaping, and(d) to enable development for certain purposes where such development would not have a detrimental effect on the scenic quality and visual amenity of that area or be subjected to any hazards resulting from the geological character of the locality.3 Without development consentDevelopment for the purpose of:agriculture (other than intensive animal husbandry or horticulture); ancillary removal of native vegetation; bushfire control.Exempt development.4 Only with development consentDevelopment for the purpose of:clearing; cluster farming; dams; duplexes; dwelling houses; forestry; general stores; home industries; jetties with a maximum of 2 vessels used for private use; professional consulting rooms; public buildings; public utility undertakings; recreation establishments; recreation facilities; roadside stalls; rural industries.Recreation development.Any other development not included in item 3 or 5.Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedDevelopment for the purpose of:brothels; restricted premises; total destination resorts.cl 57, table: Am 11.1.2002.
58 Subdivision controls in environmental protection zones
(1) This clause applies to the subdivision of land within Zone No 7 (a), 7 (b), 7 (c) or 7 (e).(2) Consent must not be granted to the subdivision of land in an environmental protection zone unless the minimum area of each allotment to be created by the subdivision is not less than 100 hectares.(3) In deciding whether to grant consent to such a subdivision, the consent authority shall take the following matters into consideration:(a) the area and quality of the land comprising each proposed allotment and its potential agricultural productivity,(b) the likely effects (both economic and otherwise) that the proposed subdivision will have on agricultural industries in the area and the resources employed by or in connection with those industries,(c) the likely effects (both economic and otherwise) that the proposed subdivision will have on the use and development of other land and resources in the area,(d) whether there are any reasonable alternatives to the proposed subdivision in the circumstances,(e) the effect of the existence of, or the erection of, a dwelling,(f) the cumulative effect of similar proposals if consent is granted pursuant to subclause (2),(g) the likelihood of each proposed allotment remaining available for efficient agricultural use,(h) any relevant matter established in a development control plan that applies to the land,(i) the availability of access and the provision of services to each proposed allotment.
59 Subdivision of land within two or more zones
(1) If an allotment of land is partly within a rural zone and partly within an environmental protection zone, consent may be granted to the subdivision of the allotment only if:(a) the requirements for subdivision in the rural zone is met for the land within that zone, and(b) any building to be erected on the land is located within the rural zone, or on an allotment of not less than 100 hectares in an environmental protection zone.(2) If an allotment of land is partly within a rural zone and partly within an environmental protection zone, consent must not be granted to a subdivision of land which creates an allotment wholly within an environmental protection zone unless:(a) the allotment created has an area of not less than 100 hectares, and(b) the consent authority has taken the matters listed in clause 58 (3) into consideration.(3) If an allotment of land is partly within an environmental protection zone and partly within a residential zone, consent may be granted to a subdivision of the allotment only if:(a) the requirements for subdivision in the residential zone are met for the land within that zone, and(b) any building to be erected on the land is located within the residential zone, or on an allotment of not less than 100 hectares in an environmental protection zone.(4) If an allotment of land is partly within an environmental protection zone and partly within a residential zone, consent must not be granted to a subdivision of the land which creates an allotment wholly within an environmental protection zone unless:(a) the allotment created has an area of not less than 100 hectares, and(b) the consent authority has taken the matters listed in clause 58 (3) into consideration.(5) This clause does not apply to land to which Part 8 applies.cl 59: Am 2010 (140), Sch 1 [13].
60 Dwelling houses in environmental protection zones
(1) Consent must not be granted to the erection of a dwelling house on an allotment of land within any environmental protection zone unless that allotment:(a) has an area of not less than 40 hectares, or(b) comprises an allotment created by a subdivision in accordance with clause 58 or 59 of this plan, or(c) comprises an allotment on which a dwelling house could have been erected immediately prior to the appointed day and which could have been created in accordance with the provisions of clause 58 or 59 if those provisions were in force at the time that the allotment was created, or(d) comprises an allotment of land that was consented to or approved by the Council prior to the appointed day and on which a dwelling house could have been lawfully erected immediately prior to the appointed day.(2) This clause does not apply to land to which Part 8 applies.cl 60: Am 2010 (140), Sch 1 [14].
61 Development within environmental protection zones
(1) This clause applies to land within an environmental protection zone other than land to which Part 8 applies.(2) Consent to the carrying out of development on land to which this clause applies must not be granted unless the consent authority has determined that the impact of the development on:(a) the visual and scenic quality of the area, and(b) the risk of soil erosion and water pollution, andwould not be substantially adverse.(c) the important vegetation systems and natural wildlife habitats (including wetlands) of the area,(3) Subject to subclause (2), consent must not be granted to the clearing of land to which this clause applies unless the consent authority is satisfied that:(a) the clearing is necessary for the reasonable use of the land or the provision of utility services, or(b) the clearing is necessary to reduce the risk of bushfires.cl 61: Am 2010 (140), Sch 1 [15].
62 Development within Zone No 7 (c) (the Environmental Protection (Coastal Foreshore) Zone)
(1) This clause applies to land within Zone No 7 (c).(2) (Repealed)(3) A person shall not carry out development for any purpose on land shown by vertical hatching on the map within Zone No 7 (c) except with development consent.(4) (Repealed)(5) The Council, in deciding whether to grant consent to development referred to in subclause (3), shall take into consideration:(a) the likelihood of the proposed development adversely affecting, or being adversely affected by, coastal processes, and(b) the likelihood of the proposed development adversely affecting any dune or beach of the shoreline or foreshore, and(c) the likelihood of the proposed development adversely affecting the landscape or the scenic or environmental quality of the land in the locality, and(d) whether adequate safeguards and rehabilitation measures have been, or will be, taken to protect the environment, and(e) the potential impacts of climate change including sea level rise.cl 62: Am 2008 (571), Sch 3.107 [22]–[25].
63 Development within Zone No 7 (e) (the Environmental Protection (Escarpment/Scenic) Zone) or on ridgelines
(1) This clause applies to land within Zone No 7 (e) on or near a ridgeline.(2) The Council shall not consent to the carrying out of development on land to which this clause applies where, in the opinion of the consent authority, that development is likely to substantially detract from the visual amenity of the locality, having regard to the cumulative visual effect of the development related to other development that may be anticipated in the locality and in the area generally.(3) Before giving its consent to the erection of a building on land to which this clause applies, the consent authority shall make an assessment as to whether it should impose conditions relating to:(a) the use on the external surfaces of the building of prescribed materials, and(b) the number, type and location of existing trees and shrubs which are to be retained and the extent of landscaping to be carried out on the site, and(c) the siting of the proposed building.(4) In this clause:external surfaces, in relation to a building or work, includes the external walls and cladding (if any), external doors, external door and window frames, columns, roofs, fences and any surface of that building or work visible from the exterior of that building or work.prescribed materials means materials with dark tones or dark colouring and of low reflective quality or materials which are painted or similarly treated with dark toned or dark coloured paint or pigment of low reflective quality.
64 Development within Mangrove Creek Catchment Area
(1) The Mangrove Creek Catchment Area is shown by diagonal hatching on the map. All development in this area, other than on land in Zone No 1 (f), requires development consent.(2) Consent must not be granted to the carrying out of development on land within the Mangrove Creek Catchment Area unless the consent authority has determined that the impact of the development on the quality of water within any waterway within or passing through that catchment area would not be adverse. In determining the impact, the following should be considered:(a) the risk of soil erosion, and(b) the risk of water pollution, and(c) any potential for siltation.(3) (Repealed)(4) The Forestry Commission of New South Wales shall give the Council notice before carrying out any substantial development on the land to which this clause applies and take into consideration any submission made by the Council within 28 days of the notice being sent.cl 64: Am 2008 (571), Sch 3.107 [26].
Part 7 National Parks zone provisions
65 National Parks zones applying in this plan, zone objectives and development control table
(1) The following National Parks zones apply as identified on the map:8 (a) National Parks8 (b) Proposed National Parks(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”“Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.TableZone No 8 (a) National Parks Zone1 Aim of zoneThe primary aims of this zone are to identify land which is reserved or dedicated under the National Parks and Wildlife Act 1974 and to protect land so identified.2 Objectives of zoneThe objective is to enable the development of land within this zone for purposes which are authorised under the National Parks and Wildlife Act 1974.3 Without development consentAny development authorised under the National Parks and Wildlife Act 1974 or any development ordinarily incidental or ancillary to such development.4 Only with development consentNil.5 ProhibitedAny development not included in item 3 or 4.Zone No 8 (b) Proposed National Parks Zone1 Aim of zoneThe primary aims of this zone are to identify land which is proposed to be reserved or dedicated under the National Parks and Wildlife Act 1974 and to protect land so identified.2 Objectives of zoneThe particular objectives of this zone are:(a) to conserve the natural characteristics of the land which is proposed to be acquired for reservation or dedication under the National Parks and Wildlife Act 1974 as national park or nature reserve, and(b) to retain the productive use of such land, providing its conservation value is not impaired.3 Without development consentDevelopment for the purpose of:agriculture (other than cattle feed lots, pig keeping and poultry farming; the clearing of trees or native vegetation, or the erection or use of sheds or other outbuildings, or the carrying out of works, associated with agriculture); uses carried out by or on behalf of the National Parks and Wildlife Service.4 Only with development consentDevelopment for the purpose of:clearing of trees or native vegetation; erection or use of sheds or other outbuildings or the carrying out of works associated with agriculture (other than the clearing of trees or native vegetation); miscellaneous forestry; public utility undertakings; selective logging; utility installations (other than gas holders or generating works).Note—Consent for development included in this item will be refused if the proposed development is not consistent with the objectives of the zone.5 ProhibitedAny development not included in item 3 or 4.
66 Acquisition of land for National Park purposes
(1) The owner of land within Zone No 8 (b) may, by notice in writing, require the Director-General of National Parks and Wildlife to acquire the land.(2) On receipt of a notice relating to land referred to in subclause (1) the Director-General of National Parks and Wildlife shall acquire the land.
67 Development of land within Zone No 8 (b)
Before granting consent to the carrying out of development within Zone No 8 (b), the consent authority shall:(a) forward particulars of the development application to the National Parks and Wildlife Service, and(b) take into consideration any representations received from the Director-General of National Parks and Wildlife in respect of the application within 40 days after the forwarding of those particulars to the Service.
Part 8 West Yamba provisions
pt 8: Ins 2010 (140), Sch 1 [16].
68 Land to which this Part applies
This Part applies to the land shown edged heavy black on the map marked “Maclean Local Environmental Plan 2001 (Amendment No 20)” deposited in the office of Clarence Valley Council.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
69 Objectives of this Part
The objectives of this Part are:(a) to rezone land at West Yamba from Zone No 1 (i) Rural (Investigation) Zone to a variety of zones that permit environmental protection, rural residential development and urban residential development, and(b) to implement the Clarence Valley Settlement Strategy 1999 and the Maclean Shire Council Strategic Land Use Plan 1995–2016, and(c) to protect riparian areas, land of high conservation value and land of landscape or scenic value, and(d) to provide housing in close proximity to the existing urban area of Yamba and compatible with nearby environmental protection areas, and(e) to provide a neighbourhood business centre in a central location and land for school and community purposes, and(f) to permit development that complies with a development control plan, and(g) to permit development when adequate servicing, in particular sewerage, is available, and(h) to provide ecologically sustainable development, including water and energy efficient development and a stormwater management network, based on the principles of “water sensitive urban design”.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
70 Zones applying in West Yamba, zone objectives and development control table
(1) The following zones apply to land to which this Part applies:(a) Zone No 1 (y) Rural (West Yamba Rural Residential),(b) Zone No 2 (c) Residential (West Yamba),(c) Zone No 5 (a) Special Uses,(d) Zone No 6 (a) Open Space,(e) Zone No 7 (d) Environmental Protection (Residential Habitat),(f) Zone No 7 (r) Environmental Protection (Riparian).(2) The aims of a zone are set out in the Table to this clause under the heading “Aim of zone”.(3) The objectives of a zone are set out in the Table to this clause under the heading “Objectives of zone” appearing in the matter relating to the zone.(4) Except as otherwise provided by this plan, in relation to land within a zone specified in the Table to this clause, the development:(a) that may be carried out without development consent, and(b) that may be carried out only with development consent, andis specified in that Table under the headings “Without development consent”, “Only with development consent” and “Prohibited”, respectively, appearing in the matter relating to the zone.(c) that is prohibited,(5) Except as otherwise provided by this plan, consent must not be granted to the carrying out of development on land to which this plan applies unless the consent authority is satisfied that the development is consistent with the objectives of the zone within which the development is proposed to be carried out.Note—Part 5 also applies to land in Zone Nos 5 (a) and 6 (a).TableZone No 1 (y) Rural (West Yamba Rural Residential) Zone1 Aim of zoneThe primary aim of this zone is to provide for serviced rural residential development in close proximity to Yamba.2 Objectives of zoneThe particular objectives of this zone are:(a) to allow rural residential development in West Yamba on land with a minimum lot size of 5,000 square metres and serviced by a reticulated water and sewerage system, and(b) to ensure that dwellings are located so that they maintain the rural character of the area and minimise disturbance to the landscape through clustering of development to minimise filling, clearing, earthworks and access roads, and(c) to prohibit development that is not compatible with the habitat, landscape or scenic value of the land or adjacent land, and(d) to minimise the impact on adjacent land by managing “edge effects” associated with clearing, filling, mosquito and bushfire management and the like.3 Without development consentDevelopment for the purpose of:agriculture; ancillary removal of native vegetation; bushfire control; public utility undertakings.4 Only with development consentDevelopment for the purpose of:home industries; rural industries.Any other development not included in item 3 or 5.5 ProhibitedDevelopment for the purpose of:brothels; bulk stores; car repair stations; clear felling; industries; intensive animal husbandry; junk yards; liquid fuel depots; motor showrooms; restricted premises; sawmills; total destination resorts; warehouses.Zone No 2 (c) Residential (West Yamba) Zone1 Aim of zoneThe primary aim of this zone is to provide sustainable urban housing adjacent to the existing urban area of Yamba, characterised by low scale residential development, compatible with the habitat, landscape and scenic value of the surrounding locality.2 Objectives of zoneThe particular objectives of this zone are:(a) to provide a sustainable urban residential neighbourhood that does not impact adversely on nearby natural areas and waterways, and(b) to provide a range of housing types compatible with the locality, and(c) to reduce the impacts of development on the natural water cycle by a range of measures, including dual water reticulation and stormwater management based on “water sensitive urban design” principles, and(d) to permit development that complies with a development control plan, and(e) to provide a neighbourhood centre in a central location, and(f) to ensure a residential environment free from any adverse impact from commercial and industrial uses, and(g) to provide adequate provision of services, such as water, reticulated sewerage and electricity, and(h) to ensure water and energy efficient development.3 Without development consentDevelopment for the purpose of:ancillary removal of native vegetation; bushfire control; public utility undertakings.4 Only with development consentDevelopment for the purpose of:business identification signs; caravan parks; child care centres; clearing; cluster housing; dual occupancies; dwelling houses; home industries; hospitals; neighbourhood centres; residential flat buildings; tourist facilities; utility installations (other than generating works).5 ProhibitedAny development not included in item 3 or 4.Zone No 7 (d) Environmental Protection (Residential Habitat) Zone1 Aim of zoneThe primary aim of the zone is to identify, protect and conserve land of high conservation, landscape or scenic value, provide habitat connectivity and provide a separation between environmentally sensitive riparian areas (including high conservation value vegetation) and urban and rural residential areas.2 Objectives of zoneThe particular objectives of this zone are:(a) to conserve and manage land of high conservation, landscape or scenic value, and(b) to provide a “green backdrop” and a gradual change in density of vegetation between vegetated areas and residential development, and(c) to retain vegetated land identified by flora and fauna assessment as significant habitat areas, and(d) to enhance habitat corridors and recognise the importance of the locality as a regional habitat corridor, and(e) to prohibit development that would adversely affect the habitat, landscape or scenic value of the land, and(f) to enable development that is adequately serviced and would not have an adverse effect on the habitat, landscape or scenic value of the land, and(g) to permit development that complies with a development control plan.3 Without development consentDevelopment for the purpose of:agriculture; ancillary removal of native vegetation; bushfire control; home occupations; public utility undertakings.4 Only with development consentDevelopment for the purpose of:clearing; cluster housing; dams; dwelling houses; ecotourism facilities; environmental education facilities; home industries; recreation development; recreation establishments; roads.5 ProhibitedAny development not included in item 3 or 4.Zone No 7 (r) Environmental Protection (Riparian) Zone1 Aim of zoneThe primary aim of this zone is to identify, protect, conserve and enhance the natural values of riparian land in West Yamba.2 Objectives of zoneThe particular objectives of this zone are:(a) to protect and enhance native riparian vegetation, water quality and habitat value, and(b) to prohibit development within the zone that would adversely affect the riparian environment, and(c) to enable the careful control of noxious plants and weeds by means not likely to be significantly detrimental to the native ecosystem.3 Without development consentDevelopment for the purpose of:bushfire control.4 Only with development consentDevelopment for the purpose of:agriculture; ancillary removal of native vegetation; public utility undertakings; recreation development; utility installations.5 ProhibitedAny development not included in items 3 or 4.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
71 Subdivision controls
(1) Development consent must not be granted to subdivide land in Zone No 1 (y) unless each lot to be created will have an area of at least 0.5 hectares.(2) Development consent must not be granted to subdivide land in Zone No 7 (d) unless each lot to be created will have an area of at least 10 hectares.(3) Development consent must not be granted to subdivide land that is partly in Zone No 1 (y) and partly in Zone No 7 (d) unless the area of each lot to be created will be at least:(a) for land in Zone No 1 (y)—0.5 hectares, and(b) for land in Zone No 7 (d)—10 hectares.(4) Despite subclause (3), if the whole of the land in Zone No 7 (d) immediately before the subdivision is less than 10 hectares then the minimum area of the lot for the land in that zone is the area of the land in that zone immediately before that subdivision.(5) If development consent is sought to subdivide land that is partly in Zone No 1 (y) and partly in Zone No 7 (r), the total area of the land may be taken to be land in Zone No 1 (y) for the purposes of subclause (1).(6) If development consent is sought to subdivide land that is partly in Zone No 7 (d) and partly in Zone No 7 (r), the total area of the land may be taken to be land in Zone No 7 (d) for the purposes of subclause (2).Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
72 West Yamba neighbourhood centre controls
Development consent must not be granted for a neighbourhood centre on the land to which this Part applies unless the centre:(a) will be located on an accessible site in close proximity to the existing school in Carrs Drive, and(b) will have a total site area of not more than 1 hectare, and(c) will have a retail floor area of not more than 1,000 square metres and individual shops of not more than 200 square metres, and(d) will not include supermarkets, and(e) will be the only neighbourhood centre on the land to which this Part applies.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
73 Restrictions on land filling in West Yamba
(1) Development consent must not be granted for development for the purposes of the filling of land in Zone No 7 (r).(2) Development consent must not be granted for development for the purposes of the filling of land in Zone No 7 (d), unless it is in conjunction with a use that is permissible in that zone.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
Part 9 Urban release areas
Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
74 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.(3) Subclause (2) does not apply to:(a) any lot identified in the certificate as a residue lot, or(b) any lot created by a subdivision previously consented to in accordance with this clause, or(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.(4) This clause does not apply to land in an urban release area if all or any part of the land is in a special contributions area (as defined by section 93C of the Act).(5) State Environmental Planning Policy No 1—Development Standards does not apply to the subdivision of land to which subclause (2) applies.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
75 Public utility infrastructure
(1) Development consent must not be granted for development on land in an urban release area unless the Council is satisfied that any public utility infrastructure that is essential for the proposed development is available or that adequate arrangements have been made to make that infrastructure available when it is required.(2) This clause does not apply to development for the purpose of providing, extending, augmenting, maintaining or repairing any public utility infrastructure.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
76 Development control plan
(1) The objective of this clause is to ensure that development on land in an urban release area occurs in a logical and cost-effective manner, in accordance with a staging plan and only after a development control plan that includes specific controls has been prepared for the land.(2) Development consent must not be granted for development on land in an urban release area unless a development control plan that provides for the matters specified in subclause (3) has been prepared for the land.(3) The development control plan must provide for all of the following:(a) a staging plan for the timely and efficient release of urban land making provision for necessary infrastructure and sequencing,(b) an overall transport movement hierarchy showing the major circulation route, based on Carrs Drive being the main north-south collector road and Golding and Miles Streets being collector roads, a grid street pattern and connections to achieve a simple and safe movement system for private vehicles, public transport, pedestrians and cyclists,(c) an overall landscaping strategy for the protection and enhancement of riparian areas and remnant vegetation, including visually prominent locations, and detailed landscaping requirements for both the public and private domain,(d) a network of passive and active recreational areas,(e) stormwater and water quality management controls,(f) amelioration of natural and environmental hazards, including bushfire, flooding and site contamination and, in relation to natural hazards, the safe occupation of, and the evacuation from, any land so affected,(g) detailed urban design controls for significant development sites,(h) measures to encourage higher density living around transport, open space and service nodes,(i) measures to accommodate and control appropriate neighbourhood commercial and retail uses,(j) suitably located public facilities and services, including provision for appropriate traffic management facilities and parking,(k) measures to require adequate setback from the overhead electricity transmission line located in the vicinity of Miles Street.(4) Subclause (2) does not apply to any of the following development:(a) a subdivision for the purpose of a realignment of boundaries that does not create additional lots,(b) a subdivision of land if any of the lots proposed to be created is to be reserved or dedicated for public open space, public roads or any other public or environmental protection purpose,(c) a subdivision of land in a zone in which the erection of structures is prohibited,(d) proposed development on land that is of a minor nature only, if the consent authority is of the opinion that the carrying out of the proposed development would be consistent with the objectives of the zone in which the land is situated.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
77 Relationship between Part and remainder of plan
A provision of this Part prevails over any other provision of this plan to the extent of any inconsistency.Parts 9 (cll 68–77): Ins 2010 (140), Sch 1 [16].
Schedule 1 Environmental heritage
(Clause 25)
Locality | Item name and State Heritage Inventory Register No | Address | Property description | Significance |
Angourie | Angourie Point Pools, 1990337 | Angourie Reserve | Property 119940 | Local |
Angourie | Angourie Reserve, 1990111 | Angourie Road and Crown reserve (including Spookys Valley and Angourie Point Pools) | Property 119940 | Local |
Angourie | Angourie National Park, 1990120 | The Lakes Boulevard | Property 119940 | Local |
Angourie | Yuraygir National Park, 1990336 | Yuraygir National Park | Property 119940 | Local |
Ashby | Dry Dock, 1990043 | Green Point | Clarence River | Local |
Ashby | Residence (“Bathgate”), 1990301 | 384 Murrayville Road | Lots 1–3 and 5, DP 17850 | Local |
Ashby | Sarah Phillips headstone, 1990285 | 168 Patemans Road | Lots 11 and 14, DP 1078438 | Local |
Brooms Head | Brooms Head Hall, 1990232 | Brooms Head Road | Property 114797 | Local |
Brooms Head | Pine trees, 1990012 | Brooms Head Reserve | Property 114797 | Local |
Brushgrove | The Triangle (public open space), 1990174 | Clarence, Donaldson and Woodford Streets | Lot 1, DP 758172 | Local |
Brushgrove | Residence (former police station), 1990001 | 5–7 Clarence Street | Lot 2, Sec 10, DP 758172 | Local |
Brushgrove | Brushgrove Hotel, 1990131 | 6–8 Clarence Street | Lots 1 and 2, DP 795840 | Local |
Brushgrove | Residence, 1990154 | 12–14 Clarence Street | Lots 7 and 8, DP 758172 | Local |
Brushgrove | Residence (former shops), 1990191 | 15 Clarence Street | Lot 2, DP 665929 | Local |
Brushgrove | Post Office, 1990002 | 34 Clarence Street | Lot 11, DP 592199 | Local |
Brushgrove | Residence (2 former shops), 1990190 | 40 Clarence Street | Lot 3, Sec 3, DP 758172 | Local |
Brushgrove | Residence (former bank), 1990280 | 2 Donaldson Street | Lot 4, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 26 River Street | Lot 3, Sec 6, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 28 River Street | Lot 4, Sec 6, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 34 River Street | Lot 7, Sec 6, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 36 River Street | Lot 8, Sec 6, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 38 River Street | Lot 9, Sec 6, DP 758172 | Local |
Brushgrove | Group of cottages, 1990145 | 40 River Street | Lot 10, Sec 6, DP 758172 | Local |
Brushgrove | The Common, 1990279 | Woodford Street | Lot 7009, DP 92606 | Local |
Brushgrove | Uniting Church, 1990281 | 11 Woodford Street | Lot 7, Sec 5, DP 758172 | Local |
Brushgrove | Free Presbyterian Church, 1990173 | 13 Woodford Street | Lot 8, Sec 5, DP 758172 | Local |
Chatsworth Island | Puntman’s Cottage and ferry approach, 1990230 | Chatsworth Road | Road reserve | Local |
Chatsworth Island | Avenue of trees, 1990013 | Chatsworth Road | Road reserve | Local |
Chatsworth Island | CSR Memorial, 1990262 | Chatsworth Road | Road reserve | Local |
Chatsworth Island | War Memorial, 1990261 | Chatsworth Road | Road reserve | Local |
Chatsworth Island | Residence (“Glencoe”), 1990248 | Chatsworth Road | Lot 4, DP 605338 | Local |
Chatsworth Island | Former Presbyterian Church, 1990149 | 1 Chatsworth Road | Lots 1 and 2, DP 392 | Local |
Chatsworth Island | Residence, 1990048 | 7 Chatsworth Road | Lot 8, DP 31960 and Lots 7–10, DP 392 | Local |
Chatsworth Island | Post Office and General Store, 1990233 | 9 Chatsworth Road | Lot 8, DP 31960 and Lots 7–10, DP 392 | Local |
Chatsworth Island | Anglican Church, 1990265 | 15 Chatsworth Road | Lot 14, DP 392 | Local |
Chatsworth Island | Community hall, 1990260 | 17 Chatsworth Road | Lots 15 and 16, DP 392 | Local |
Chatsworth Island | Residence, 1990187 | 27 Chatsworth Road | Lot 2, DP 223663 | Local |
Chatsworth Island | Residence and shop, 1990009 | 29 Chatsworth Road | Lot 1, DP 22413 | Local |
Chatsworth Island | Residence, 1990192 | 35 Chatsworth Road | Lots 28 and 29, DP 392 | Local |
Chatsworth Island | Residence, 1990186 | 39–57 Chatsworth Road | Lot 11, DP 804169 | Local |
Chatsworth Island | Primary school and residence, 1990006 and 1990007 | 136–140 Chatsworth Road | Lot 165, DP 751373 | Local |
Chatsworth Island | Residence, 1990008 | 144 Chatsworth Road | Lot 2, DP 571949 | Local |
Chatsworth Island | Residence, 1990193 | 10 Fig Tree Lane | Lots 32 and 33, DP 392 | Local |
Chatsworth Island | Residence, 1990061 | 114 North Arm Drive | Lot 25, DP 661428 | Local |
Harwood | Residence, 1990354 | 3 Church Street | Lot 12, DP 859558 | Local |
Harwood | Harwood Island sportsground pavilion, 1990170 | Mill Street | Local | |
Harwood | Tram tracks, 1990298 | Mill Street | Road reserve | Local |
Harwood | School and residence, 1990290 and 1990011 | Morpeth Street | Lot 1, DP 818005 | Local |
Harwood | Residence, 1990302 | 18 Morpeth Street | Lot 40, DP 800537 | Local |
Harwood | Tram tracks, 1990391 | Old Pacific Highway | Road reserve | Local |
Harwood | Sportsfield and grandstand, 1990170 | Petticoat Lane | Lot 92, DP 665552 | Local |
Harwood | Water Brigade Hall, 1990066 | River Street | Lot 169, DP 751373 | Local |
Harwood | War Memorial, 1990288 | River Street | Road reserve | Local |
Harwood | Trees, 1990146 | River Street | Road reserve | Local |
Harwood | Residence, 1990291 | 86 River Street | Lot 1, DP 565575 | Local |
Iluka | Ferry landing site, 1990105 | Bundjalung National Park | Local | |
Iluka | Soldiers Memorial Hall, 1990160 | Charles Street | Road reserve | Local |
Iluka | War Memorial, 1990171 | Charles Street | Road reserve | Local |
Iluka | Residence, 1990156 | 9 Charles Street | Lot 3, DP 563584 | Local |
Iluka | Crane block and break wall, 1990234 | Clarence River | Local | |
Iluka | Cemetery, 1990166 | Elizabeth Street | Crown land | Local |
Iluka | Sea Stack, 1990331 | Iluka Bluff | Bundjalung National Park | Local |
Iluka | Tram tracks, 1990189 | Iluka Bluff | Bundjalung National Park | Local |
Iluka | Iluka Post Office, 1990148 | 90–92 Queen Street | Lot 2, DP 748039 | Local |
Iluka | Residence, 1990197 | 14 Riverview Street | Lot B, DP 402069 | Local |
Iluka | Cricket pitch, 1990108 | 80 Riverview Street | Lot 80, DP 727778 | Local |
Iluka | Residence, 1990194 | 93 Spencer Street | Lot 10, Sec 16, DP 758535 | Local |
James Creek | Residence, 1990062 | 35 James Creek Road | Lot 181, DP 751388 | Local |
James Creek | Residence, 1990282 | 112 James Creek Road | Lot 183, DP 751388 | Local |
James Creek | Flood gates, 1990159 | near 112 James Creek Road | Local | |
James Creek | Residence, 1990238 | 580 Yamba Road | Lot 181, DP 751388 | Local |
Lawrence | War Memorial and park, 1990296 | Bridge Street | Lot 9, Sec 3, DP 758604 | Local |
Lawrence | Baptist Manse, 1990292 | 2 Bridge Street | Lot 14, Sec 3, DP 564 and road reserve | Local |
Lawrence | Baptist Church, 1990016 | 9 Bridge Street | Lot 21, DP 839199 | Local |
Lawrence | School of Arts Building, 1990015 | 10 Bridge Street | Lot 10, Sec 3, DP 758604 | Local |
Lawrence | Residence, 1990293 | 11 Bridge Street | Lot 2, DP 568938 | Local |
Lawrence | Sportsmans Creek Bridge, 1990115 | 21–27 Bridge Street | Lot 6, Sec 1, DP 564 | Local |
Lawrence | Lawrence Cemetery, 1990295 | Casino Road | Lots 1–8, Sec 51, DP 758604 | Local |
Lawrence | Anglican Church, 1990018 | 63–71 High Street | Lots 6–8, Sec 16, DP 758604 | Local |
Lawrence | Bluff Point ferry, 1990142 | Main Road 152 | Clarence River Crossing | Local |
Lawrence | Lawrence Museum, 1990153 | 2 Merton Street | Lot 11, DP 1034955 | Local |
Lawrence | Memorial baths remains, 1990103 | off Rutland Street | Property 1113889, DP 84302 | Local |
Lawrence | Post Office and residence, 1990135 | 29–31 Rutland Street | Lots 1 and 2, DP 602497 | Local |
Lawrence | Police Station, 1990035 | 33–37 Rutland Street | Lot 299, DP 822835 | Local |
Lawrence | Residence, 1990017 | 6 Stuart Lane | Lot 2, Sec 62, DP 758604 | Local |
Lawrence | Cricket canteen, 1990122 | Ward Street | DP 758604 | Local |
Maclean | Residence, 1990210 | 22 Alexander Street | Lot 2, DP 340155 | Local |
Maclean | Residence, 1990360 | 12 Argyle Street | Lot 1, DP 59164 | Local |
Maclean | Memorial cairn, 1990289 | Bent, Taloumbi and Harwood Streets, Herb Stanford Park | Plan 8422 | Local |
Maclean | Showground and Pavilion, 1990372 | Cameron Street | Plan 88428 | Local |
Maclean | Punt and former Ashby ferry (both stationary), 1990373 | Cameron Street and Pacific Highway (corner of), Ferry Park | Lot 434, DP 823599 | Local |
Maclean | Maclean Fine Arts Building, 1990379 | 12 Cameron Street | Plan 88428 | Local |
Maclean | Maclean Cemetery, 1990123 | 14–20 Cameron Street | Lots 431–433, DP 834006, Lot 1, DP 1112123, Lot 1, DP 758631 | Local |
Maclean | Uniting Church and former church hall, 1990256 | 3A Church Street | Lots 6 and 7, Sec 5, DP 758631 | Local |
Maclean | Residential group, 1990400 | 5 Church Street | Lot 21, DP 1054408 | Local |
Maclean | Residential group, 1990400 | 12 Church Street | Lot 3, DP 912461 | Local |
Maclean | Residential group, 1990400 | 12A Church Street | Lot 4, DP 912461 | Local |
Maclean | Residence, 1990399 | 21 Church Street | Lot 2, DP 563060 | Local |
Maclean | Residence, 1990019 | 23 Church Street | Lot 1, DP 563060 | Local |
Maclean | Residential group, 1990397 | 24 Church Street | Lot A, DP 937442 | Local |
Maclean | Residential group, 1990397 | 26 Church Street | Lot B, DP 932541 | Local |
Maclean | Residential group, 1990397 | 28 Church Street | Lot 2, DP 368369 | Local |
Maclean | Residential group, 1990397 | 30 Church Street | Lot 1, DP 386369 | Local |
Maclean | Residence, 1990022 | 2 Clarence Street | Lot 2, DP 625612 | Local |
Maclean | Residence, 1990402 | 3 Clarence Street | Lot 3, DP 215469 | Local |
Maclean | Professional consulting rooms (former shop), 1990023 | 14 Clyde Street | Lot 1, DP 417654 | Local |
Maclean | Flats, 1990359 | 18–20 Clyde Street | Lots 1–3, DP 796928 | Local |
Maclean | Residence, 1990203 | 22 Clyde Street | Lot 1, DP 816002 | Local |
Maclean | Residential group, 1990358 | 22 Clyde Street | Lot 1, DP 816002 | Local |
Maclean | Residential group, 1990358 | 24 Clyde Street | Lot 41, DP 1053146 | Local |
Maclean | Brickworks site (“Pages”), 1990257 | 84 Farlows Lane | Lots 119 and 120, DP 751388 | Local |
Maclean | Residential group, 1990403 | 15 Grafton Street | Lot 1, DP 321053 | Local |
Maclean | Residential group, 1990403 | 17 Grafton Street | Lot 2, DP 321053 | Local |
Maclean | Stone Cottage Museum, 1990052 | 19–21 Grafton Street | Lot 8, Sec 19, DP 758631 | Local |
Maclean | Residence (“The Gables”), 1990147 | 2B Howard Street | Lot 5, DP 235925 | Local |
Maclean | Residence, 1990270 | 10 John Street | Lot 2, DP 515170 | Local |
Maclean | Residence (“Hillcrest”), 1990420 | Jubilee Street | Lots 61 and 62, DP 1036148 | Local |
Maclean | Residential group, 1990440 | 13 McLachlan Street | Lot 7, DP 193168 | Local |
Maclean | Residential group, 1990440 | 15 McLachlan Street | Lot 21, DP 845366 | Local |
Maclean | Court House, 1990025 | McNaughton Place | Lots 3 and 7, Sec 1A, DP 758631 | Local |
Maclean | Police Station, 1990026 | McNaughton Place | Lot 6, Sec 1A, DP 758631 | Local |
Maclean | Residential group, 1990350 | 4 Morven Street | Lot 64, DP 627 | Local |
Maclean | Residential group, 1990350 | 5 Morven Street | Lot 22, DP 771460 | Local |
Maclean | Residential group, 1990350 | 9 Morven Street | Lot 2, DP 346021 | Local |
Maclean | Gaelic street sign, 1990422 | Oban Street | Road reserve | Local |
Maclean | Residential group, 1990340 | 1 Oban Street | Lot A, DP 349486 | Local |
Maclean | Residential group, 1990340 | 3 Oban Street | Lots 3 and 4, Sec 1, DP 1666 | Local |
Maclean | Residential group, 1990340 | 7 Oban Street | Lot 7, Sec 1, DP 1666 | Local |
Maclean | Residential group, 1990340 | 8 Oban Street | Lot 1, DP 331040 | Local |
Maclean | Residential group, 1990340 | 9 Oban Street | Lot 8, Sec 1, DP 1666 | Local |
Maclean | Residential group, 1990340 | 10 Oban Street | Lot 1, DP 519160, Lot 1, DP 944020 | Local |
Maclean | Residential group, 1990340 | 11 Oban Street | Lot 9, Sec 1, DP 1666 | Local |
Maclean | Residential group, 1990340 | 12 Oban Street | Lots 20 and 21, DP 667085, Lot 22, DP 667022 | Local |
Maclean | Residential group, 1990340 | 14 Oban Street | Lot 1, DP 961180 | Local |
Maclean | Residential group, 1990340 | 15 Oban Street | Lots 11 and 12, Sec 1, DP 1666 | Local |
Maclean | Residential group, 1990340 | 16 Oban Street | Lot 1, DP 974917 | Local |
Maclean | Residence, 1990027 | 3 Oban Street | Lots 3 and 4, Sec 1, DP 1666 | Local |
Maclean | Residence, 1990205 | 10 Oban Street | Lot 1, DP 519160, Lot 1, DP 944020 | Local |
Maclean | Residence, 1990342 | 14 Oban Street | Lot 1, DP 961180 | Local |
Maclean | War Memorial, 1990287 | River and Short Streets | Road reserve | Local |
Maclean | Office building, 1990031 | 6 River Street | Lot 1, DP 177120 | Local |
Maclean | Shop and residence, 1990033 | 8 River Street | Lot 1, DP 799272 | Local |
Maclean | Shop, 1990449 | 12 River Street | Lot 2, DP 325894 | Local |
Maclean | Shop facade, 1990029 | 14 River Street | Lot 7, DP 13714 | Local |
Maclean | Shop facade, 1990179 | 16 River Street | Lot 8, DP 13714 | Local |
Maclean | Maclean Hotel, 1990138 | 28 River Street | Lot 2, DP 603403 | Local |
Maclean | Office building (“Conroy and Stewart”), 1990139 | 30 River Street | Lot 100, DP 711006 | Local |
Maclean | Post Office, 1990129 | 46 River Street | Lot 1, DP 774885 | Local |
Maclean | Residence, 1990034 | 65 River Street | Lot 1, DP 533016 | Local |
Maclean | Residence, 1990222 | 76 River Street | Lot 1, DP 335226 | Local |
Maclean | Residence, 1990037 | 78 River Street | Lot 1, DP 361835 | Local |
Maclean | Residence, 1990382 | 103 River Street | Lot 2, DP 392761 | Local |
Maclean | Shop, 1990038 | 151 River Street | Lot 21, DP 818102 | Local |
Maclean | Clarence Hotel, 1990212 | 173 River Street | Lot 2, DP 522060, Lot 1, DP 796975 | Local |
Maclean | Shop, 1990445 | 185–187 River Street | Lot 12, DP 333 | Local |
Maclean | Offices (“Woolitji House”), 1990157 | 203 River Street | Lot 20, DP 333 | Local |
Maclean | Offices, 1990406 | 207 River Street | Lot 1, DP 796971 | Local |
Maclean | Cafe and restaurant, 1990447 | 215 River Street | Lot 1, DP 177086 | Local |
Maclean | Shop, 1990441 | 217 River Street | Lot 1, DP 314743 | Local |
Maclean | Former theatre facade, 1990338 | 221–225 River Street | Lots 18 and 19, DP 13558 | Local |
Maclean | Footpath engraving, 1990339 | 221–225 River Street | Road reserve in front of Lots 18 and 19, DP 13558 | Local |
Maclean | Shop, 1990450 | 227 River Street | Lot 1, DP 796931 | Local |
Maclean | Offices, 1990451 | 229 River Street | Lot 21, DP 13558 | Local |
Maclean | Facades to shops group, 1990101 | 243 River Street | Lot 22, DP 1014700 | Local |
Maclean | Facades to shops group, 1990101 | 245 River Street | Lot 1, DP 611496 | Local |
Maclean | Fire Station, 1990446 | 257 River Street | Lot 32, DP 13558 | Local |
Maclean | Shop (former drill hall), 1990176 | 259 River Street | Lot 79, DP 13075 | Local |
Maclean | Doctor’s surgery, 1990374 | 265 River Street | Lot 87, DP 13075 | Local |
Maclean | Shop (former Baptist Church), 1990047 | 267 River Street | Lot 1, DP 796851 | Local |
Maclean | Flats, 1990213 | 3 Short Street | Lot 1, DP 321784 | Local |
Maclean | Residence, 1990041 | 4 Short Street | Lot 86, DP 13075 | Local |
Maclean | Residence, 1990040 | 5 Short Street | Lot 101, DP 702870 | Local |
Maclean | McFarlane Bridge, 1990081 | Over South Arm of the Clarence River | Local | |
Maclean | Trees, 1990407 | Stanley Street | Road reserve | Local |
Maclean | Residential group, 1990408 | 12 Stanley Street | Lot 1, DP 957764 | Local |
Maclean | Residential group, 1990408 | 16 Stanley Street | Lot 3, DP 311927 | Local |
Maclean | Residential group, 1990408 | 24 Stanley Street | Lot 1, DP 384495 | Local |
Maclean | Residential group, 1990408 | 40 Stanley Street | Lot 1, DP 796841 | Local |
Maclean | Residential group, 1990408 | 44A Stanley Street | Lot B, DP 419263 | Local |
Maclean | Residential group, 1990409 | 13 Stanley Street | Lot 1, DP 170664 | Local |
Maclean | Residential group, 1990409 | 17–19 Stanley Street | Lot 5, DP 593268 | Local |
Maclean | Residence, 1990326 | 16 Stanley Street | Lot 3, DP 311927 | Local |
Maclean | Duplex (former brewery), 1990137 | 17–19 Stanley Street | Lot 5, DP 593268 | Local |
Maclean | Residence, 1990102 | 36 Stanley Street | Lot 1, DP 386844 | Local |
Maclean | Residential group, 1990413 | 10 Taloumbi Street | Lot 3, DP 386424 | Local |
Maclean | Residential group, 1990413 | 16 Taloumbi Street | Lot 10, DP 1027851 | Local |
Maclean | Residence, 1990216 | 16 Taloumbi Street | Lot 10, DP 1027851 | Local |
Maclean | Residential group, 1990428 | 27 Taloumbi Street | Lot 11, DP 1087292 | Local |
Maclean | Residential group, 1990428 | 31 Taloumbi Street | Lot 1, DP 547957 | Local |
Maclean | Residential group, 1990428 | 33a Taloumbi Street | Lot 2, DP 547957 | Local |
Maclean | Former operating theatre, Maclean Hospital, 1990130 | 23 Union Street | Lot 1, DP 578513 | Local |
Maclean | Pinnacle Rock Lookout, 1990377 | Wharf Street | DP 623900 | Local |
Maclean | Residential group, 1990323 | 1 Wharf Street | Lot 102, DP 702870 | Local |
Maclean | Residential group, 1990323 | 3 Wharf Street | Lot 1, DP 317367 | Local |
Maclean | Residential group, 1990323 | 5a Wharf Street | Lot 1, DP 416054 | Local |
Maclean | Residential group, 1990323 | 7 Wharf Street | Lot 1, DP 796850 | Local |
Maclean | Residential group, 1990323 | 9 Wharf Street | Lot B, DP 331596 | Local |
Maclean | Residential group, 1990323 | 11 Wharf Street | Lot A, DP 331596 | Local |
Maclean | Baptist Manse, 1990049 | 5a Wharf Street | Lot 2, DP 416054 | Local |
Maclean | Residence, 1990305 | 7 Wharf Street | Lot 1, DP 796850 | Local |
Maclean | Free Presbyterian Church, 1990140 | 8–10 Wharf Street | Lot 11, DP 853183 | Local |
Maclean | Residence, 1990307 | 11 Wharf Street | Lot A, DP 331596 | Local |
Maclean | Presbyterian Manse, 1990050 and 1990316 | 12 Wharf Street | Lot 12, DP 853183 | Local |
Maclean | Residential group, 1990317 | 14 Wharf Street | Lot A, DP 388476 | Local |
Maclean | Residential group, 1990317 | 16 Wharf Street | Lot B, DP 388476 | Local |
Maclean | Residential group, 1990317 | 18 Wharf Street | Lot 1, DP 379653 | Local |
Maclean | Residential group, 1990317 | 20 Wharf Street | Lot 2, DP 379653 | Local |
Maclean | Residential group, 1990317 | 22 Wharf Street | Lot 3, DP 951079 | Local |
Maclean | Residence, 1990051 | 19 Wharf Street | Lot 1, DP 204306 | Local |
Maclean | Masonic Lodge, 1990304 | 23 Wharf Street | Lot 1, DP 850290 | Local |
Maclean | Residential group, 1990416 | 31 Wharf Street | Lot 2, DP 721373 | Local |
Maclean | Residential group, 1990416 | 33a Wharf Street | Lot 11, DP 1046650 | Local |
Maclean | Residential group, 1990416 | 33b Wharf Street | Lot 11, DP 1046650 | Local |
Maclean | Residential group, 1990416 | 35 Wharf Street | Lot 1, DP 826969 | Local |
Maclean | Residence, 1990053 | 34 Wharf Street | Lot 2, DP 340210 | Local |
Maclean | Residential group, 1990320 | 36 Wharf Street | Lot 1, DP 219644 | Local |
Maclean | Residential group, 1990320 | 38 Wharf Street | Lot 2, DP 219644 | Local |
Maclean | Anglican Rectory, 1990054 | 44 Wharf Street | Lot 4, Sec 11, DP 758631 | Local |
Maclean | Maclean Public School, 1990055 | Woodford Street | Lot 1, DP 796977 | Local |
Maclean | Residence, 1990045 | 5 Woodford Street | Lot 2, DP 512409 | Local |
Maclean | Residential group, 1990396 | 12 Woodford Street | Lot 3, DP 515170 | Local |
Maclean | Residential group, 1990396 | 13 Woodford Street | Lot 24, DP 627 | Local |
Maclean | Catholic Church (1990056), Convent (1990044) and Rectory (1990042) | 27 Woodford Street | Lot 4, Sec 9, DP 758631 | Local |
Maclean | Residence, 1990219 | 38 Woodford Street | Lot 76, DP 13179 | Local |
Maclean | Residence, 1990021 | 51 Woodford Street | Lot 2, DP 350425 | Local |
Palmers Island | Palmers Island Village site, 1990136 | River Road | Lot 417, DP 751388 | Local |
Palmers Island | Residence (“Wynyabbie House”), 1990067 | 797 Yamba Road | Lot 21, DP 838061 | Local |
Palmers Island | Residence, 1990068 | 858 Yamba Road | Lot 1, DP 109044 | Local |
Palmers Island | Residence, 1990069 | 976 Yamba Road | Lot 4, DP 592835 | Local |
Palmers Island | Silo, 1990070 | 1096–1130 Yamba Road | Lot 20, DP 714069 | Local |
Palmers Island | Residence, 1990065 | 1096–1130 Yamba Road | Lot 20, DP 714069 | Local |
Romiaka Island | Oyster Channel Bridge, 1990419 | Yamba Road | Road reserve | Local |
Romiaka Island | Farm buildings (other than silo), 1990161 | 1200 Yamba Road, Palmers Channel | Lots 184–187, DP 751388 | Local |
Romiaka Island | Silo, 1990370 | 1200 Yamba Road, Palmers Channel | Lot 187, DP 751388 | Local |
Shark Creek | Shark Creek Bridge, 1990141 | Pacific Highway | Road reserve | Local |
Shark Creek | Pioneers Memorial, 1990255 | Shark Creek Road | Lot 108, DP 751372 | Local |
South Arm | Residence, 1990077 | 25 South Arm School Road | Lot 28 and part of Lot 29, DP 751392 | Local |
Taloumbi | Station Blaze Trees, 1990005 | 1099–1101 Brooms Head Road | Lot 191, DP 751372 | Local |
Taloumbi | Station Hoop Pine trees, 1990438 | 1099–1101 Brooms Head Road | Lot 191, DP 751372 | Local |
Townsend | Residence, 1990024 | 3 Jubilee Street | Lot 1, DP 501255 | Local |
Townsend | Residence (“Nungera Co-operative”), 1990420 | Hillcrest Road | Lots 61 and 62, DP 1036148 | Local |
Tullymorgan | Former school buildings and other structures, 1990079 | 1069 Jackybulbin Road, Tullymorgan Reserve | Lot 58, DP 751382 | Local |
Tullymorgan | Bails and tank (“Arndilly”), 1990276 | 662 Tullymorgan Road | Lot 21, DP 751382 | Local |
Tyndale | Shed and cane barracks, 1990385 | 18 Gallaghers Road | Lot 2, DP 210874 | Local |
Tyndale | Residence, 1990073 | 2742 Pacific Highway | Lot 40, DP 1095984 | Local |
Tyndale | Residence, 1990072 | 2860 Pacific Highway | Lot 2, DP 586049 | Local |
Tyndale | Residence, 1990071 | 3121 Pacific Highway | Lot 1, DP 518888, Lot 1, DP 232301 | Local |
Ulgundahi and Corolama Islands | Ulgundahi Island and Corolama Island, 1990162 | Clarence River by North Arm | State | |
Warregah Island | Residence (“Andersons”), 1990132 | 315 Warregah Island Road | Lot 1, DP 1077538 | Local |
Woodford Island | Woodford Leigh School, 1990178 | 3701 Lawrence Road | Lot 49, DP 751392 | Local |
Woodford Island | Smalls Cemetery, 1990177 | South Arm School Road reserve | Lot 1, DP 995802 | Local |
Woodford Island | South Arm Schoolhouse, 1990332 | 179 South Arm School Road | Lots 1 and 2, DP 554895 | Local |
Woody Head | Hall, 1990167 | Bundjalung National Park | Local | |
Woody Head | Hammond’s cottage, 1990244 | Bundjalung National Park | Local | |
Woombah | Former Woombah School, 1990058 | 43 Adams Street | Lot 2, DP 568278 | Local |
Yamba | Flinders Park, 1990266 | Clarence and Queen Streets | Reserve | Local |
Yamba | Commercial group, 1990180 | 7 Clarence Street | Lot 4, DP 301363 | Local |
Yamba | Commercial group, 1990180 | 9 Clarence Street | Lot 3, DP 301363 | Local |
Yamba | Commercial group, 1990180 | 11 Clarence Street | Lot 2, DP 301363 | Local |
Yamba | Commercial group, 1990180 | 13 Clarence Street | Lot 1, DP 169823 | Local |
Yamba | Milepost, 1990274 | Fred Phillips Park | Road reserve | Local |
Yamba | Calyspso Van Park, 1990286 | Harbour Street | Plan 81523 | Local |
Yamba | Surf life saving club building, 1990182 | Main Beach | Lots 125 and 139, DP 751395, Lot 180, DP 41513 | Local |
Yamba | Rock pool, 1990202 | Main Beach | Crown coastal reserve | Local |
Yamba | Flagpole, 1990083 | Norfolk Park, River Street | Lot 1, DP 759130 | Local |
Yamba | Agar Park, 1990258 | Ocean Street | Reserve | Local |
Yamba | Light House precinct, including 2 boatman’s cottages, 1990185 | Pilot and Clarence Streets (reserve fronting) | Lots 272–274, DP 48539, Lot 1, DP 90838, Lot 1, DP 802768 | Local |
Yamba | Pacific Hotel (only with respect to columns and 1950s facade fronting Pilot Street), 1990268 | 19 Pilot Street | Lot 1, DP 554606 | Local |
Yamba | War Memorial, 1990224 | Queen Street | Road reserve | Local |
Yamba | Storey House Museum, 1990059 | River Street | Lot 184, DP 704231 | Local |
Yamba | Sign, 1990381 | Rocky Laurie Drive | Road reserve | Local |
Yamba | Yamborra Cottages, 1990335 | Rocky Laurie Drive | Lot 182, DP 44782 | Local |
Yamba | Norfolk Pines, 1990152 | Wooli Street | Road reserve | Local |
Yamba | Residence and 2 Norfolk Island pine trees, 1990060 | 44 Wooli Street | Lot 5, Sec 9, DP 759130 | Local |
Yamba | Police Station, 1990158 | 45 Wooli Street | Lots 3 and 3A, DP 759130 | Local |
Yamba | Kearns boatshed, 1990184 | Yamba Road reserve | Lot 7041, DP 1023320 | Local |
Yamba | Gantry wall, 1990107 | Yamba Road, Clarence River | Crown land | Local |
sch 1: Am 6.7.2001. Subst 2008 (53), Sch 1 [4]. Am 2008 (519), Sch 1 [1] [2].
Schedule 2 Additional development
(Clause 22)
Map reference | Land | Development for the purpose of the following: |
1 | Lot 276, DP 751377, Pringles Way, Lawrence | A dwelling house or 2 attached dwellings |
2 | Lots 59 and 104, DP 751356, Old Ferry Road, Ashby | A dwelling house or 2 attached dwellings |
3 | Lot 2, DP 339553, Wooli Street, Yamba | Commercial premises |
4 | Lot B, DP 333887, Little High Street, Yamba | Shop |
5 | Lot 138, DP 751395, Wooli Street, Yamba | Funeral parlour |
6 | Lot 2, DP 520149, Yamba Road, Yamba | Shops |
7 | Lots 25 and 26, Section 7, DP 566, Richmond Street, Lawrence | Retail plant nursery |
8 | Lot 30, DP 635326, Havelock Street, Lawrence | Printing shop |
9 | Lots 8, 9 and 10, Section 3, DP 564 and Lot 111, DP 611537, Bridge Street, Lawrence | Service station and car repair station |
10 | Lot 8, Section 10, DP 758535, Spenser Street, Iluka | Restaurant |
11 | Lot 11, Section 10, DP 758535, Spenser Street, Iluka | Fishing tackle shop and take-away food shop |
12 | Lot 2, DP 551000, Spenser Street, Iluka | Service station |
13 | Lot 1, DP 551000, Young Street, Iluka | Shop |
14 | Lot 22, DP 619756, Rannoch Avenue, Maclean | Sports centre |
15 | Lot 31, DP 627, Argyle Street, Maclean | Bus depot |
16 | Lot 2, DP 867018, Church Street, Maclean | Tyre repair business |
17 | Lot 11, DP 827039, 109–117 River Street, Maclean | Service station and car repair station |
18 | Lot 1, DP 622022 and Lot Y, DP 414356, 51–55 River Street, Maclean | Commercial fishing activities including, but not limited to, storage and processing of fish |
19 | Lot 2, DP 387172, 49 River Street, Maclean | Administration in connection with the adjoining commercial fishing activities |
20 | Lot B, DP 376038, 59 River Street, Maclean | Funeral parlour and mortuary |
21 | Lot 9, Section 6, DP 759119, Middle Street, Woombah | Bakery and pie manufacturing |
22 | Lots 1 and 2, Section 6, DP 759119, Adams Street, Woombah | Coffee processing |
23 | Lot 6, Section 6, DP 759119, Middle Street, Woombah | Coffee plantation and shop |
24 | Lot 102, DP 616467, Morpeth Street, Harwood | Open air display of tractors and machinery |
25 | Lot 4, DP 19456, Lots 5A and 5B, DP 376103, Ocean Street, Yamba | One dwelling house on each allotment |
26 | Lot 1, DP 317367, 3 Wharf Street, Maclean | Offices for a community-based non-profit organisation |
27 | Lot 1121, DP 730289, Paines Road, Ashby | Subdivision into 2 allotments and the erection of one dwelling house on the vacant lot so created, subject to compliance with bushfire management guidelines, effluent disposal satisfactory to the Council, no additional clearing and no visual impact from the Clarence River valley floor. |
28 | Lot 24, DP 230180, Koala Lane, Townsend | A dwelling house, subject to the condition that no building is erected, and no work (including clearing) is carried out, within 100 metres of any adjoining land that is within Zone No 7 (a). |
Note—
Property descriptions are as at the date of gazettal of Maclean Local Environmental Plan 2001. The area identified on the maps marked “Maclean Local Environmental Plan 2001 (Schedule 2 properties)” shows the land to which clause 22 applies. Property descriptions may change over time.
sch 2: Am 30.5.2003; 21.11.2003; 30.4.2004.
Schedules 3, 4 (Repealed)
sch 3: Rep 8.10.2004.
sch 4: Rep 8.10.2004.
Schedule 5 Classification and reclassification of public land as operational land
(Clause 23)
Palmers Island
Lot 3, DP 603599, fronting the Clarence River, as shown by heavy black edging on the map marked “Maclean Local Environmental Plan 1992 (Amendment No 26)”.