State Environmental Planning Policy (Precincts—Regional) 2021 No 727

Effective date Publication date Amendments included Notes
28 November 2025 28 November 2025 2025 (EPI 644)
14 November 2025 14 November 2025 2025 (EPI 618)
01 October 2025 01 October 2025 2025 (EPI 405)
19 September 2025 19 September 2025 2025 (EPI 513)
08 August 2025 08 August 2025 2025 (EPI 402)
24 January 2025 24 January 2025 2025 (EPI 13)
23 August 2024 23 August 2024 2024 (EPI 427)
10 May 2024 10 May 2024 2024 (EPI 151)
08 March 2024 08 March 2024 2024 (EPI 65)
04 March 2024 04 March 2024 2023 (EPI 523)
15 December 2023 15 December 2023 2023 (EPI 698)
14 December 2023 14 December 2023 2023 (EPI 664)
24 November 2023 24 November 2023 2023 (EPI 626)
10 November 2023 10 November 2023 2023 (EPI 607)
2023 (EPI 609)
01 November 2023 01 November 2023 2023 (EPI 524)
01 October 2023 01 October 2023 2023 (EPI 554)
18 August 2023 18 August 2023 2023 (EPI 454)
04 August 2023 04 August 2023 2023 (EPI 437)
14 July 2023 14 July 2023 2023 No 7
01 May 2023 01 May 2023 2023 (EPI 83)
02 March 2023 02 March 2023 2023 (EPI 118)
2023 (EPI 119)
16 December 2022 16 December 2022 2022 (EPI 823)
2022 (EPI 824)
2022 (EPI 825)
2022 (EPI 835)
21 November 2022 21 November 2022 2022 (EPI 629)
26 August 2022 26 August 2022 2022 (EPI 516)
2022 (EPI 519)
19 August 2022 19 August 2022 2022 (EPI 472)
01 July 2022 01 July 2022 2022 (EPI 350)
30 March 2022 30 March 2022 2022 (EPI 116)
2022 (EPI 117)
02 March 2022 02 March 2022 2021 (EPI 727)
01 March 2022 01 March 2022 2021 (EPI 727)
2022 (EPI 48)
02 December 2021 02 December 2021

State Environmental Planning Policy (Precincts—Regional) 2021 SL No 727 (EPI 727)

notfd 02.12.2021.

Date of commencement, 1.3.2022, sec 2.

Amended by this Policy, Sch 11, sec 6.

Parkes Local Environmental Plan Amendment (Precincts—Regional) 2025 (EPI 644)

notfd 28.11.2025.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Port Kembla Land Transformation Precinct) 2025 (EPI 618)

notfd 14.11.2025.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Snowy Mountains) 2025 (EPI 513)

notfd 19.09.2025.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Alpine Region Fire Safety) 2025 (EPI 405)

notfd 08.08.2025.

Date of commencement, 1.10.2025, sec 2.

Parkes Local Environmental Plan (Activation Precincts) 2025 (EPI 402)

notfd 08.08.2025.

Date of commencement, on publication on LW, cl 2.

Wagga Wagga Local Environmental Plan Amendment (Complying Development) 2025 (EPI 13)

notfd 24.01.2025.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) 2024 (EPI 427)

notfd 23.08.2024.

Date of commencement, on publication on LW, sec 2.

Parkes Local Environmental Plan Amendment (Activation Precinct) 2024 (EPI 151)

notfd 10.05.2024.

Date of commencement, on publication on LW, cl 2.

Snowy River Local Environmental Plan Amendment (Kosciuszko Alpine Region) 2024 (EPI 65)

notfd 08.03.2024.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Design Competition Guidelines) 2023 (EPI 698)

notfd 15.12.2023.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (Housing) 2023 (EPI 664)

notfd 14.12.2023.

Date of commencement of Sch 2, on publication on LW, sec 2(b).

State Environmental Planning Policy (Precincts—Regional) Amendment (Snowy Mountains Activation Precinct) 2023 (EPI 626)

notfd 24.11.2023.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (Flood Planning) 2023 (EPI 609)

notfd 10.11.2023.

Date of commencement, on publication on LW, sec 2.

Snowy River Local Environmental Plan Amendment (Kosciuszko Alpine Region) 2023 (EPI 607)

notfd 10.11.2023.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (Housing and Productivity Contributions) 2023 (EPI 554)

notfd 29.09.2023.

Date of commencement, 1.10.2023, sec 2.

State Environmental Planning Policy Amendment (Exceptions to Development Standards) 2023 (EPI 524)

notfd 15.09.2023.

Date of commencement, 1.11.2023, sec 2.

State Environmental Planning Policy Amendment (Estimated Development Cost) 2023 (EPI 523)

notfd 15.09.2023.

Date of commencement, 4.3.2024, sec 2.

Central Coast Local Environmental Plan Amendment (Gosford City Centre) 2023 (EPI 454)

notfd 18.08.2023.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) (No 2) 2023 (EPI 437)

notfd 04.08.2023.

Date of commencement, on publication on LW, sec 2.

Statute Law (Miscellaneous Provisions) Act 2023 No 7 (SI )

Assented to 03.07.2023.

Date of commencement, 14.7.2023, sec 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) 2023 (EPI 119)

notfd 02.03.2023.

Date of commencement, on publication on LW, sec 2.

Snowy River Local Environmental Plan 2013 (Amendment No 5) (2023 EPI 118)

notfd 02.03.2023.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy Amendment (National Construction Code) 2023 (EPI 83)

notfd 24.02.2023.

Date of commencement, 1.5.2023, sec 2.

State Environmental Planning Policy Amendment (Riverstone West Precinct) 2022 (EPI 835)

notfd 16.12.2022.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy (Transport and Infrastructure) Amendment (Thermal Energy from Waste) 2022 (EPI 825)

notfd 16.12.2022.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Kosciuszko Alpine Region) 2022 (EPI 824)

notfd 16.12.2022.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) (No 2) 2022 (EPI 823)

notfd 16.12.2022.

Date of commencement, on publication on LW, sec 2.

State Environmental Planning Policy Amendment (Water Catchments) 2022 (EPI 629)

notfd 21.10.2022.

Date of commencement, 21.11.2022, sec 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 45) (2022 EPI 519)

notfd 26.08.2022.

Date of commencement, on publication on LW, cl 2.

Snowy River Local Environmental Plan 2013 (Amendment No 4) (2022 EPI 516)

notfd 26.08.2022.

Date of commencement, on publication on LW, cl 2.

Parkes Local Environmental Plan 2012 (Amendment No 8) (2022 EPI 472)

notfd 19.08.2022.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Snowy Mountains Activation Precinct) 2022 (EPI 350)

notfd 01.07.2022.

Date of commencement, on publication on LW, sec 2.

Wagga Wagga Local Environmental Plan 2010 (Amendment No 44) (2022 EPI 117)

notfd 30.03.2022.

Date of commencement, on publication on LW, cl 2.

Moree Plains Local Environmental Plan 2011 (Amendment No 7) (2022 EPI 116)

notfd 30.03.2022.

Date of commencement, on publication on LW, cl 2.

State Environmental Planning Policy (Precincts—Regional) Amendment (Activation Precincts) 2022 (EPI 48)

notfd 18.02.2022.

Date of commencement, except Sch 2, 1.3.2022, sec 2.

Amending legislation

Wagga Wagga Local Environmental Plan 2010 (Amendment No 43) (SI )

notfd 25.02.2022.

Date of commencement, on publication on LW, cl 2.

This is a consolidated list of all history notes for this title. View the history notes inline to see the point-in-time history of provisions for a particular historical version by clicking the Turn history notes on button.

Sec 2.3

Am 2022 (835), Sch 3[1] [2].

Sec 2.4

Am 2022 (835), Sch 3[3].

Sec 2.6A

Ins 2023 (524), Sch 2.3[1].

Sec 2.7

Am 2022 (835), Sch 3[4].

Sec 2.8

Am 2022 (835), Sch 3[4].

Sec 3.2

Am 2022 (48), Sch 1[1]; 2022 (823), Sch 1[1]–[3]; 2023 (626), Sch 1[1]; 2025 (644), Sch 1[1].

Sec 3.4

Am 2022 (48), Sch 1[2]; 2023 (437), sec 4; 2025 (402), Sch 1[1].

Sec 3.5

Am 2022 (823), Sch 1[4]; 2025 (513), Sch 1[1].

Sec 3.5A

Ins 2023 (609), Sch 2.20[1]. Am 2025 (513), Sch 1[2].

Part 3.3, note

Subst 2023 (119), Sch 1[1]. Rep 2023 (626), Sch 1[2]. Ins 2025 (513), Sch 1[3].

Sec 3.9

Am 2023 (119), Sch 1[2] [3].

Sec 3.10

Am 2022 (48), Sch 1[3]; 2023 (119), Sch 1[2] [4] [5].

Sec 3.11

Subst 2023 (119), Sch 1[6]. Am 2024 (427), Sch 1[1]–[3].

Sec 3.12A

Ins 2023 (119), Sch 1[7]. Am 2023 (626), Sch 1[3]; 2025 (513), Sch 1[4].

Sec 3.13

Am 2023 (119), Sch 1[2] [8].

Sec 3.14

Am 2023 (119), Sch 1[2].

Sec 3.15

Am 2023 (119), Sch 1[2] [9].

Sec 3.16

Am 2023 (119), Sch 1[10].

Part 3.4

Ins 2022 (823), Sch 1[5].

Part 3.4, Div 1, heading

Rep 2023 (119), Sch 1[11].

Part 3.4, Div 1

Ins 2022 (823), Sch 1[5].

Sec 3.17

Ins 2022 (823), Sch 1[5]. Subst 2023 (626), Sch 1[4]; 2025 (513), Sch 1[5].

Sec 3.18

Ins 2022 (823), Sch 1[5]. Am 2023 (626), Sch 1[5]; 2024 (427), Sch 1[4]; 2025 (402), Sch 1[2]; 2025 (513), Sch 1[6].

Sec 3.19

Ins 2022 (823), Sch 1[5]. Am 2023 (626), Sch 1[6]–[8]; 2025 (513), Sch 1[7] [8].

Sec 3.20

Ins 2022 (823), Sch 1[5]. Am 2023 (626), Sch 1[9] [10]; 2025 (513), Sch 1[9] [10].

Sec 3.21

Ins 2022 (823), Sch 1[5]. Am 2023 (626), Sch 1[11] [12]; 2025 (13), Sch 1; 2025 (513), Sch 1[11] [12].

Part 3.5

Ins 2024 (427), Sch 1[5].

Sec 3.22

Ins 2024 (427), Sch 1[5].

Chapter 4

Subst 2022 (824), Sch 1[1].

Part 4.1

Subst 2022 (824), Sch 1[1].

Sec 4.1

Subst 2022 (824), Sch 1[1].

Sec 4.2

Subst 2022 (824), Sch 1[1].

Sec 4.3

Subst 2022 (824), Sch 1[1].

Sec 4.4

Subst 2022 (824), Sch 1[1].

Sec 4.5

Subst 2022 (824), Sch 1[1]. Am 2025 (513), Sch 1[1].

Sec 4.6

Subst 2022 (824), Sch 1[1]; 2023 (664), Sch 2.4[1].

Part 4.2

Subst 2022 (824), Sch 1[1].

Sec 4.7

Subst 2022 (824), Sch 1[1].

Sec 4.8

Subst 2022 (824), Sch 1[1]. Am 2023 (607), Sch 1.

Sec 4.9

Subst 2022 (824), Sch 1[1].

Sec 4.10

Subst 2022 (824), Sch 1[1].

Land Use Table

Subst 2022 (824), Sch 1[1].

Part 4.3

Subst 2022 (824), Sch 1[1].

Sec 4.11

Subst 2022 (824), Sch 1[1]. Am 2024 (65), Sch 1[1] [2].

Sec 4.12

Subst 2022 (824), Sch 1[1]. Am 2024 (65), Sch 1[3].

Sec 4.13

Subst 2022 (824), Sch 1[1]. Am 2024 (65), Sch 1[4].

Part 4.4

Subst 2022 (824), Sch 1[1].

Sec 4.14

Subst 2022 (824), Sch 1[1].

Sec 4.15

Subst 2022 (824), Sch 1[1].

Sec 4.16

Subst 2022 (824), Sch 1[1].

Sec 4.17

Subst 2022 (824), Sch 1[1].

Sec 4.18

Subst 2022 (824), Sch 1[1].

Sec 4.19

Subst 2022 (824), Sch 1[1].

Sec 4.20

Subst 2022 (824), Sch 1[1].

Sec 4.21

Subst 2022 (824), Sch 1[1].

Sec 4.22

Subst 2022 (824), Sch 1[1].

Sec 4.23

Subst 2022 (824), Sch 1[1].

Sec 4.24

Subst 2022 (824), Sch 1[1].

Sec 4.25

Subst 2022 (824), Sch 1[1].

Sec 4.25A

Ins 2025 (405), Sch 1[1].

Part 4.5

Ins 2022 (824), Sch 1[1].

Sec 4.26

Subst 2022 (824), Sch 1[1].

Sec 4.27

Ins 2022 (824), Sch 1[1].

Sec 4.28

Ins 2022 (824), Sch 1[1].

Sec 4.29

Ins 2022 (824), Sch 1[1].

Sec 4.30

Ins 2022 (824), Sch 1[1].

Part 4.6

Ins 2022 (824), Sch 1[1].

Sec 4.31

Ins 2022 (824), Sch 1[1]. Am 2023 (609), Sch 2.20[2]; 2025 (405), Sch 1[2].

Sec 5.5

Am 2023 (523), Sch 2.5[1]–[3].

Sec 5.6

Am 2025 (513), Sch 1[13].

Sec 5.8

Am 2023 (524), Sch 2.3[2]; 2023 (609), Sch 2.20[3].

Part 5.3

Am 2022 (629), Sch 3.15.

Sec 5.28

Am 2023 (524), Sch 1.2[1].

Sec 5.38

Am 2023 (626), Sch 1[13].

Sec 5.40

Am 2023 (609), Sch 2.20[4].

Sec 5.41

Am 2023 (609), Sch 2.20[4].

Sec 5.46

Am 2023 (698), Sch 2.4[1]–[3].

Sec 5.50

Am 2023 (664), Sch 2.4[2] [3].

Sec 5.54

Am 2023 (523), Sch 2.5[4]; 2023 (626), Sch 1[14].

Chapter 6

Ins 2025 (618), Sch 2[1].

Part 6.1

Ins 2025 (618), Sch 2[1].

Sec 6.1

Ins 2025 (618), Sch 2[1].

Sec 6.2

Ins 2025 (618), Sch 2[1].

Sec 6.3

Ins 2025 (618), Sch 2[1].

Sec 6.4

Ins 2025 (618), Sch 2[1].

Sec 6.5

Ins 2025 (618), Sch 2[1].

Sec 6.6

Ins 2025 (618), Sch 2[1].

Sec 6.7

Ins 2025 (618), Sch 2[1].

Sec 6.8

Ins 2025 (618), Sch 2[1].

Sec 6.9

Ins 2025 (618), Sch 2[1].

Part 6.2

Ins 2025 (618), Sch 2[1].

Sec 6.10

Ins 2025 (618), Sch 2[1].

Sec 6.11

Ins 2025 (618), Sch 2[1].

Sec 6.12

Ins 2025 (618), Sch 2[1].

Sec 6.13

Ins 2025 (618), Sch 2[1].

Sec 6.14

Ins 2025 (618), Sch 2[1].

Part 6.3

Ins 2025 (618), Sch 2[1].

Part 6.4

Ins 2025 (618), Sch 2[1].

Sec 6.15

Ins 2025 (618), Sch 2[1].

Sec 6.16

Ins 2025 (618), Sch 2[1].

Sec 6.17

Ins 2025 (618), Sch 2[1].

Part 6.5

Ins 2025 (618), Sch 2[1].

Sec 6.18

Ins 2025 (618), Sch 2[1].

Sec 6.19

Ins 2025 (618), Sch 2[1].

Sec 6.20

Ins 2025 (618), Sch 2[1].

Part 6.6

Ins 2025 (618), Sch 2[1].

Sec 6.21

Ins 2025 (618), Sch 2[1].

Sec 6.22

Ins 2025 (618), Sch 2[1].

Part 6.7

Ins 2025 (618), Sch 2[1].

Sec 6.23

Ins 2025 (618), Sch 2[1].

Sec 6.24

Ins 2025 (618), Sch 2[1].

Sec 6.25

Ins 2025 (618), Sch 2[1].

Sec 6.26

Ins 2025 (618), Sch 2[1].

Sec 6.27

Ins 2025 (618), Sch 2[1].

Sec 6.28

Ins 2025 (618), Sch 2[1].

Sec 6.29

Ins 2025 (618), Sch 2[1].

Appendix 1, heading

Subst 2022 (835), Sch 3[5].

Appendix 1

Am 2023 (626), Sch 1[15].

Appendix 2, heading

Subst 2022 (835), Sch 3[6].

Appendix 2

Am 2023 (626), Sch 1[16].

Appendix 3, heading

Subst 2022 (835), Sch 3[7].

Appendix 3

Am 2023 (524), Sch 1.2[2]; 2023 (626), Sch 1[17].

Appendix 4, heading

Subst 2022 (835), Sch 3[8].

Appendix 4

Am 2023 (524), Sch 1.2[2]; 2023 (554), Sch 2.35[1]; 2023 (626), Sch 1[18].

Appendix 5, heading

Subst 2022 (835), Sch 3[9].

Appendix 5

Am 2023 (524), Sch 1.2[2]; 2023 (554), Sch 2.35[2]; 2023 (609), Sch 2.20[5]–[7]; 2023 (626), Sch 1[19].

Appendix 6, heading

Subst 2022 (835), Sch 3[10].

Appendix 6

Am 2023 (524), Sch 1.2[2]; 2023 (626), Sch 1[20].

Sch 1

Am 2022 (48), Sch 1[4]–[13]; 2022 (472), cl 5; 2022 (823), Sch 1[6]–[9]; 2022 (825), Sch 3; 2023 (119), Sch 1[12]; 2023 (626), Sch 1[21]; 2024 (151), Sch 1; 2024 (427), Sch 1[6]; 2025 (402), Sch 1[3]; 2025 (644), Sch 1[2].

Sch 1A

Ins 2022 (48), Sch 1[14]. Am 2022 (117), cl 4; 2022 (519), cl 5; 2022 (823), Sch 1[6] [10]–[12]; 2023 (626), Sch 1[21]–[24]; 2025 (402), Sch 1[4] [5]; 2025 (644), Sch 1[3] [4].

Sch 1B

Ins 2022 (48), Sch 1[14]. Am 2022 (116), cl 4; 2022 (350), Sch 1[1]; 2022 (823), Sch 1[6] [13]–[15]; 2023 (626), Sch 1[21] [25]; 2024 (427), Sch 1[7]; 2025 (644), Sch 1[5] [6].

Sch 1C, heading

Am 2022 (350), Sch 1[2].

Sch 1C

Ins 2022 (48), Sch 1[14]. Am 2022 (350), Sch 1[3] [4]; 2023 (83), Sch 2.5; 2023 (626), Sch 1[21] [26].

Sch 1D

Ins 2022 (350), Sch 1[5]. Am 2022 (516), Sch 2[1]–[5]; 2022 (823), Sch 1[6] [16]–[18]; 2023 (118), cl 6(1) (2); 2023 (523), Sch 2.5[5] [6]; 2023 (626), Sch 1[21] [27]–[29]; 2025 (644), Sch 1[7] [8].

Sch 1E

Ins 2022 (823), Sch 1[19]. Am 2023 (119), Sch 1[13] [14]; 2023 No 7, Sch 2.46[1] [2]; 2023 (609), Sch 2.20[8] [9].

Sch 2, heading

Am 2022 (350), Sch 1[6]. Subst 2022 (824), Sch 1[2].

Sch 2

Subst 2022 (824), Sch 1[2].

Sch 3, heading

Am 2022 (350), Sch 1[7]. Subst 2022 (824), Sch 1[2].

Sch 3

Subst 2022 (824), Sch 1[2].

Sch 4

Subst 2022 (824), Sch 1[2].

Sch 4A

Ins 2022 (824), Sch 1[2]. Am 2023 (609), Sch 2.20[10]; 2025 (405), Sch 1[3].

Sch 5, heading

Am 2022 (350), Sch 1[8].

Sch 6, heading

Am 2022 (350), Sch 1[9].

Sch 7, heading

Am 2022 (350), Sch 1[10].

Sch 8, heading

Am 2022 (350), Sch 1[11].

Sch 8

Am 2023 (454), Sch 1.

Sch 9, heading

Am 2022 (350), Sch 1[12].

Sch 10

Am 2023 (523), Sch 2.5[7]; 2023 (554), Sch 2.35[3]; 2023 (609), Sch 2.20[11]; 2023 (698), Sch 2.4[4].

Sch 11

Rep 2022 (727), Sch 11. Ins 2025 (618), Sch 2[2].

State Environmental Planning Policy (Precincts—Regional) 2021

Publication: 02 December 2021 PDF icon 2021 (SI 727)