Aboriginal Land Rights Act 1983 No 42

Effective date Publication date Amendments included Notes
30 October 2023 30 October 2023 2023 No 35
14 July 2023 14 July 2023 2023 No 7
25 November 2022 25 November 2022 2022 No 68
06 December 2019 06 December 2019 2019 (SI 587)
01 December 2018 01 December 2018 2018 No 33
01 July 2018 01 July 2018 2017 No 66
29 June 2018 29 June 2018 2018 No 25
07 December 2017 07 December 2017 2017 No 63
03 April 2017 03 April 2017 2017 No 1
25 October 2016 25 October 2016 2016 No 55
08 July 2016 08 July 2016 2016 No 27
01 July 2016 01 July 2016 2016 No 27
01 March 2016 01 March 2016 2015 No 48
08 July 2015 08 July 2015 2015 No 15
01 July 2015 01 July 2015 2014 No 75
2015 No 15
16 January 2015 16 January 2015 2015 (SI 4)
04 July 2014 04 July 2014 2014 No 33
01 January 2014 01 January 2014 2013 No 51
2013 No 66
2013 No 95
18 September 2013 18 September 2013 2013 No 66
05 July 2013 05 July 2013 2013 No 47
14 September 2012 14 September 2012 2012 No 16
06 July 2012 06 July 2012 2012 No 42
16 November 2011 16 November 2011 2011 No 56
01 October 2011 01 October 2011 2011 No 22
01 October 2010 01 October 2010 2010 No 61
10 September 2010 10 September 2010 2010 (SI 520)
09 July 2010 09 July 2010 2010 No 59
01 July 2010 01 July 2010 2009 No 54
2010 No 59
19 May 2010 19 May 2010 2010 No 19
31 March 2010 31 March 2010 2009 No 58
17 July 2009 17 July 2009 2009 No 56
22 September 2008 22 September 2008 2008 No 23
01 July 2008 01 July 2008 2008 No 62
04 July 2007 04 July 2007 2007 No 27
01 July 2007 01 July 2007 2006 No 111
09 February 2007 09 February 2007 2006 No 85
07 February 2007 07 February 2007 2006 No 111
01 September 2006 01 September 2006 2006 No 40
02 June 2006 02 June 2006 2006 No 30
24 November 2005 24 November 2005 2005 No 98
31 March 2005 31 March 2005 2003 No 4
28 September 2004 28 September 2004 2004 No 69
25 October 2002 25 October 2002 2001 No 118
28 September 2001 28 September 2001 1998 No 143
31 March 2000 31 March 2000 1999 No 42

Aboriginal Land Rights Act 1983 No 42

Assented to 04.05.1983.

Date of commencement, secs 1 and 2 excepted, 10.6.1983, sec 2 (2) and GG No 84 of 10.6.1983, p 2691.

Statute Law (Miscellaneous Provisions) Act (No 2) 2023 No 35

Assented to 30.10.2023.

Date of commencement of Sch 4, assent, sec 2(c).

Statute Law (Miscellaneous Provisions) Act 2023 No 7

Assented to 03.07.2023.

Date of commencement, 14.7.2023, sec 2.

Aboriginal Land Rights Amendment Act 2022 No 68

Assented to 25.11.2022.

Date of commencement, Sch 2.1[15]–[19] and [26] excepted, assent, sec 2(b).

Date of commencement of Sch 2.1[15]–[19] and [26]: not in force.

Aboriginal Land Rights Amendment (Regions) Order 2019 (SI 587)

notfd 06.12.2019.

Date of commencement of, on publication on LW, cl 2.

Criminal Legislation Amendment (Child Sexual Abuse) Act 2018 No 33

Assented to 27.06.2018.

Date of commencement of Sch 5.1, 1.12.2018, sec 2 and 2018 (671) LW 30.11.2018.

Statute Law (Miscellaneous Provisions) Act 2018 No 25

Assented to 15.06.2018.

Date of commencement of Sch 1.1, 14 days after assent, sec 2 (1).

Electoral Act 2017 No 66

Assented to 30.11.2017.

Date of commencement, 1.7.2018, sec 2 and 2018 (302) LW 29.6.2018.

Statute Law (Miscellaneous Provisions) Act (No 2) 2017 No 63

Assented to 23.11.2017.

Date of commencement of Sch 5, 14 days after assent, sec 2 (1).

Aboriginal Land Rights Amendment (Local Aboriginal Land Councils) Act 2017 No 1

Assented to 01.03.2017.

Date of commencement, 3.4.2017, sec 2 and 2017 (113) LW 31.3.2017.

Statute Law (Miscellaneous Provisions) Act (No 2) 2016 No 55

Assented to 25.10.2016.

Date of commencement of Sch 1.1, assent, Sch 1.1.

Statute Law (Miscellaneous Provisions) Act 2016 No 27

Assented to 07.06.2016.

Date of commencement of Sch 1.1 [1]–[8], 8.7.2016, sec 2 (1).

Date of commencement of Sch 1.1 [9], 1.7.2016, Sch 1.1.

Regulatory Reform and Other Legislative Repeals Act 2015 No 48

Assented to 05.11.2015.

Date of commencement of Sch 1, 1.3.2016, sec 2 (2) and 2015 (798) LW 18.12.2015.

Statute Law (Miscellaneous Provisions) Act 2015 No 15

Assented to 29.06.2015.

Date of commencement of Sch 1.1 [1] [3] and [4], 8.7.2015, sec 2 (1).

Date of commencement of Sch 1.1 [2], 1.7.2015, Sch 1.1 and 2015 (320) LW 26.6.2015.

Aboriginal Land Rights Amendment (Regions) Order 2014 (2015 SI 4)

notfd 16.01.2015.

Date of commencement, on publication on LW, cl 2.

Aboriginal Land Rights Amendment Act 2014 No 75

Assented to 19.11.2014.

Sch 1 [1]–[91] [95] [96] [100]–[102] [104]–[107] [113]–[115] [118] [123] and [125]–[136], 1.7.2015, sec 2 and 2015 (320) LW 26.6.2015; Sch 1 [92]–[94] [97]–[99] [103] [108]–[112] [116] [117] [119]–[122] and [124] were not commenced and the Act was repealed by the Aboriginal Land Rights Amendment (Local Aboriginal Land Councils) Act 2017 No 1..

Statute Law (Miscellaneous Provisions) Act 2014 No 33

Assented to 24.06.2014.

Date of commencement of Sch 1.1, 4.7.2014, sec 2 (1).

Civil and Administrative Legislation (Repeal and Amendment) Act 2013 No 95

Assented to 20.11.2013.

Date of commencement, 1.1.2014, sec 2.

Aboriginal Land Rights Amendment Act 2013 No 66

Assented to 18.09.2013.

Date of commencement of Sch 1, Sch 1 [14] [15] [43] and [44] excepted, assent, sec 2 (1).

Date of commencement of Sch 1 [14] [15] [43] and [44], 1.1.2014, sec 2 (2).

Local Land Services Act 2013 No 51

Assented to 01.07.2013.

Date of commencement of Sch 7, 1.1.2014, sec 2 (1).

Statute Law (Miscellaneous Provisions) Act 2013 No 47

Assented to 25.06.2013.

Date of commencement of Sch 1.1, 5.7.2013, sec 2 (1).

Statute Law (Miscellaneous Provisions) Act 2012 No 42

Assented to 21.06.2012.

Date of commencement of Sch 1.1, 6.7.2012, sec 2 (1).

Mining Legislation Amendment (Uranium Exploration) Act 2012 No 16

Assented to 04.04.2012.

Date of commencement, 14.9.2012, sec 2 and 2012 (459) LW 14.9.2012.

Aboriginal Land Rights Amendment (Housing) Act 2011 No 56

Assented to 16.11.2011.

Date of commencement, assent, sec 2.

Environmental Planning and Assessment Amendment (Part 3A Repeal) Act 2011 No 22

Assented to 27.06.2011.

Date of commencement of Sch 2.1, 1.10.2011, sec 2 and 2011 (509) LW 28.9.2011.

Aboriginal Land Rights Amendment (Regions) Order 2010 (SI 520)

notfd 10.09.2010.

Date of commencement, on publication on LW, cl 2.

Commercial Arbitration Act 2010 No 61

Assented to 28.06.2010.

Date of commencement, 1.10.2010, sec 1B and 2010 (541) LW 24.9.2010.

Sch 2.1 [3] was without effect..

Statute Law (Miscellaneous Provisions) Act 2010 No 59

Assented to 28.06.2010.

Date of commencement of Sch 1.1 [1] and [2], 9.7.2010, sec 2 (2).

Date of commencement of Sch 1.1 [3], 1.7.2010, Sch 1.1.

Relationships Register Act 2010 No 19

Assented to 19.05.2010.

Date of commencement of Sch 3, assent, sec 2 (2).

Aboriginal Land Rights Amendment Act 2009 No 58

Assented to 16.09.2009.

Date of commencement, 31.3.2010, sec 2 and 2009 (624) LW 24.12.2009.

Statute Law (Miscellaneous Provisions) Act 2009 No 56

Assented to 01.07.2009.

Date of commencement of Sch 4, 17.7.2009, sec 2 (1).

Government Information (Public Access) (Consequential Amendments and Repeal) Act 2009 No 54

Assented to 26.06.2009.

Date of commencement, 1.7.2010, sec 2 and 2010 (248) LW 18.6.2010.

Statute Law (Miscellaneous Provisions) Act 2008 No 62

Assented to 01.07.2008.

Date of commencement of Sch 1.1, assent, sec 2 (2).

Miscellaneous Acts Amendment (Same Sex Relationships) Act 2008 No 23

Assented to 11.06.2008.

Date of commencement, 22.9.2008, sec 2 and GG No 118 of 19.9.2008, p 9283.

Statute Law (Miscellaneous Provisions) Act 2007 No 27

Assented to 04.07.2007.

Date of commencement of Sch 1.1 [1] and [3]–[5], assent, sec 2 (2).

Date of commencement of Sch 1.1 [2], 7.2.2007, Sch 1.1 and GG No 24 of 2.2.2007, p 585.

Aboriginal Land Rights Amendment Act 2006 No 111

Assented to 04.12.2006.

Date of commencement of Sch 1 [1] [3] [6] (except to the extent to which it inserts the definition of Region into sec 4 (1)) [7] [8] [18]–[31] [33] [34] [36]–[44] [47] (to the extent to which it inserts secs 106 (3) (e), 107 and 131) [48] [52] [80] [82] [84]–[95] [103] [105]–[108] [114] [115] [119]–[124] [126]–[128] [131] [133] [136] (except to the extent to which it inserts Part 3 of Sch 3) [137] and [139] (except to the extent to which it inserts the heading to, and cll 40, 43, 44 and 47 (3) and (4) of, Part 7 of Sch 4), 1.7.2007, sec 2 and GG No 83 of 29.6.2007, p 3965.

Date of commencement of Sch 1 [2] [4] [5] [6] (to the extent to which it inserts a definition of Region into section 4 (1)) [9]–[17] [32] [35] [45] [46] [47] (except to the extent to which it inserts sections 106 (3) (e), 107 and 131) [49]–[51] [53]–[79] [81] [83] [96]–[102] [104] [109]–[113] [116]–[118] [125] [129] [130] [132] [134] [135] [136] (to the extent to which it inserts Part 3 of Sch 3) [138] [139] (to the extent to which it inserts the heading to, and cll 40, 43, 44 and 47 (3) and (4) of, Part 7 of Sch 4) and [140], 7.2.2007, sec 2 and GG No 24 of 2.2.2007, p 585.

Amending legislation

Statute Law (Miscellaneous Provisions) Act 2007 No 27

Assented to 04.07.2007.

Date of commencement of Sch 1.2, assent, sec 2 (2).

Crown Lands Legislation Amendment (Carbon Sequestration) Act 2006 No 85

Assented to 02.11.2006.

Date of commencement, 9.2.2007, sec 2 and GG No 31 of 9.2.2007, p 735.

State Property Authority Act 2006 No 40

Assented to 08.06.2006.

Date of commencement, 1.9.2006, sec 2 and GG No 111 of 1.9.2006, p 7063.

Legal Profession Amendment Act 2006 No 30

Assented to 26.05.2006.

Date of commencement of Sch 9, 2.6.2006, sec 2 and GG No 72 of 2.6.2006, p 3730.

Statute Law (Miscellaneous Provisions) Act (No 2) 2005 No 98

Assented to 24.11.2005.

Date of commencement of Sch 3, assent, sec 2 (2).

Aboriginal Land Rights Amendment (Gandangara Estate) Act 2004 No 69

Assented to 28.09.2004.

Date of commencement, assent, sec 2.

Valuers Act 2003 No 4

Assented to 28.05.2003.

Date of commencement of Sch 1.1, 31.3.2005, sec 2 (1) and GG No 37 of 29.3.2005, p 929.

Justices Legislation Repeal and Amendment Act 2001 No 121

Assented to 19.12.2001.

Date of commencement of Sch 2, 7.7.2003, sec 2 and GG No 104 of 27.6.2003, p 5978.

The amendment made by Sch 2.1 was without effect as the provision being amended was repealed by the Aboriginal Land Rights Amendment Act 2001.

Aboriginal Land Rights Amendment Act 2001 No 118

Assented to 19.12.2001.

Date of commencement, 25.10.2002, sec 2 and GG No 189 of 25.10.2002, p 9059.

Crimes Legislation Amendment (Sentencing) Act 1999 No 94

Assented to 08.12.1999.

Date of commencement of sec 7 and Sch 5, 1.1.2000, sec 2 (1) and GG No 144 of 24.12.1999, p 12184.

Statute Law (Miscellaneous Provisions) Act (No 2) 1999 No 85

Assented to 03.12.1999.

Date of commencement of Sch 4, assent, sec 2 (1).

Offshore Minerals Act 1999 No 42

Assented to 08.07.1999.

Date of commencement, 31.3.2000, sec 2 and GG No 42 of 31.3.2000, p 2490.

Rural Lands Protection Act 1998 No 143

Assented to 08.12.1998.

Date of commencement of Sch 6, 28.9.2001, sec 2 and GG No 146 of 28.9.2001, p 8183.

Native Title (New South Wales) Amendment Act 1998 No 88

Assented to 24.09.1998.

Date of commencement of Sch 2, 30.9.1998, sec 2 and GG No 142 of 29.9.1998, p 7885.

Aboriginal Housing Act 1998 No 47

Assented to 26.06.1998.

Date of commencement, 24.7.1998, sec 2 and GG No 112 of 24.7.1998, p 5601.

Statute Law (Miscellaneous Provisions) Act 1997 No 55

Assented to 02.07.1997.

Date of commencement of Sch 3, 3 months after assent, sec 2 (3).

Date of commencement of Sch 4, assent, sec 2 (1).

National Parks and Wildlife Amendment (Aboriginal Ownership) Act 1996 No 142

Assented to 16.12.1996.

Date of commencement of Sch 2, 5.5.1997, sec 2 (1) and GG No 49 of 5.5.1997, p 2647.

The proclamation appointed 2.5.1997 as the date of commencement. Pursuant to section 23 (5) of the Interpretation Act 1987, the proclamation does not fail merely because it was not published in the Gazette until after the day appointed in the proclamation, but section 23 (5) provides, in that event, for Sch 2 to the Act to commence on the day on which the proclamation was published in the Gazette..

Mining Legislation Amendment Act 1996 No 137

Assented to 16.12.1996.

Date of commencement of Sch 2.1, 14.3.1997, sec 2 and GG No 26 of 14.3.1997, p 1470.

The proclamation appointed 8.3.1997 as the date of commencement. Pursuant to section 23 (5) of the Interpretation Act 1987, the proclamation does not fail merely because it was not published in the Gazette until after the day appointed in the proclamation, but section 23 (5) provides, in that event, for Sch 2.1 to the Act to commence on the day on which the proclamation was published in the Gazette..

Statute Law (Miscellaneous Provisions) Act (No 2) 1996 No 121

Assented to 03.12.1996.

Date of commencement of Sch 3, 3 months after assent, sec 2 (3).

Financial Institutions (Miscellaneous Amendments) Act 1996 No 24

Assented to 21.06.1996.

Date of commencement, 12.7.1996, sec 2 and GG No 84 of 12.7.1996, p 3984.

Aboriginal Land Rights Amendment Act 1995 No 39

Assented to 26.10.1995.

Date of commencement, 10.11.1995, sec 2 and GG No 138 of 10.11.1995, p 7698.

Statute Law Revision (Local Government) Act 1995 No 11

Assented to 09.06.1995.

Date of commencement of the provisions of Sch 1 relating to the Aboriginal Land Rights Act 1983, 23.6.1995, sec 2 (1) and GG No 77 of 23.6.1995, p 3279.

Water Board (Corporatisation) Act 1994 No 88

Assented to 12.12.1994.

Date of commencement of Sch 7, 1.1.1995, sec 2 and GG No 170 of 16.12.1994, p 7400.

Native Title (New South Wales) Act 1994 No 45

Assented to 02.06.1994.

Date of commencement of the provisions of Sch 1 relating to the Aboriginal Land Rights Act 1983, 28.11.1994, sec 2 and GG No 156 of 25.11.1994, p 6868.

Statute Law (Penalties) Act 1992 No 112

Assented to 08.12.1992.

Date of commencement, assent, sec 2.

Statute Law (Miscellaneous Provisions) Act (No 2) 1992 No 57

Assented to 08.10.1992.

Date of commencement of the provisions of Sch 2 relating to the Aboriginal Land Rights Act 1983, assent, Sch 2.

Mining Act 1992 No 29

Assented to 18.05.1992.

Date of commencement, 21.8.1992, sec 2 and GG No 101 of 20.8.1992, p 5905.

Statute Law (Miscellaneous Provisions) Act (No 2) 1991 No 94

Assented to 17.12.1991.

Date of commencement of the provisions of Sch 2 relating to the Aboriginal Land Rights Act 1983, assent, Sch 2.

Charitable Fundraising Act 1991 No 69

Assented to 17.12.1991.

Date of commencement, 1.9.1993, sec 2 and GG No 91 of 20.8.1993, p 4619.

Aboriginal Land Rights (Amendment) Act 1991 No 59

Assented to 12.12.1991.

Date of commencement, assent, sec 2.

Hunter Water Board (Corporatisation) Act 1991 No 53

Assented to 11.12.1991.

Date of commencement of Sch 1, 1.1.1992, sec 2 and GG No 180 of 20.12.1991, p 10554.

Aboriginal Land Rights (Amendment) Act 1990 No 60

Assented to 11.10.1990.

Date of commencement of Schs 1 (1) and 8, assent, sec 2 (2).

Date of commencement of Sch 1 (3), 17.10.1990, sec 2 (1) and GG No 128 of 17.10.1990, p 9195.

Date of commencement of so much of Sch 6 (5) as inserts sec 33 into the Aboriginal Land Rights Act 1983 and Sch 7 (4), 28.6.1991, sec 2 (1) and GG No 98 of 28.6.1991, p 5009.

Date of commencement of remainder of provisions, 16.8.1991, sec 2 (1) and GG No 116 of 16.8.1991, p 6753.

Amending legislation

Statute Law (Miscellaneous Provisions) Act (No 2) 1990 No 108

Assented to 13.12.1990.

Date of commencement of the provisions of Sch 2 relating to the Aboriginal Land Rights (Amendment) Act 1990, assent, sec 2.

Aboriginal Land Rights (Revival of Financial Provision) Act 1990 No 32

Assented to 22.06.1990.

Date of commencement, assent, sec 2.

Water Legislation (Repeal, Amendment and Savings) Act 1987 No 143

Assented to 16.06.1987.

Date of commencement of Sch 1, 3.7.1987, sec 2 (2) and GG No 115 of 3.7.1987, p 3785.

Aboriginal Land Rights (Amendment) Act 1986 No 18

Assented to 02.05.1986.

Miscellaneous Acts (Public Finance and Audit) Repeal and Amendment Act 1983 No 153

Assented to 29.12.1983.

Date of commencement of Sch 1, 6.1.1984, sec 2 (2) and GG No 4 of 6.1.1984, p 19.

This is a consolidated list of all history notes for this title. View the history notes inline to see the point-in-time history of provisions for a particular historical version by clicking the Turn history notes on button.

No reference is made to certain amendments made by Schedule 3 (amendments replacing gender-specific language) to the Statute Law (Miscellaneous Provisions) Act (No 2) 1996 and the Statute Law (Miscellaneous Provisions) Act 1997.

Long title

Am 2014 No 75, Sch 1 [1].

Preamble

Am 2014 No 75, Sch 1 [2]; 2022 No 68, Sch 4.1[1]–[4].

Sec 3

Rep 1986 No 18, Sch 1 (1). Ins 2001 No 118, Sch 1 [1]. Am 2006 No 111, Sch 1 [2] [3].

Sec 4

Am 1986 No 18, Sch 1 (2); 1994 No 45, Sch 1; 1996 No 142, Sch 2 [1]; 2001 No 118, Sch 1 [2] [3]; 2006 No 111, Sch 1 [4]–[11]; 2008 No 23, Sch 3.1 [1] [2]; 2009 No 58, Sch 1 [1] [2]; 2010 No 19, Sch 3.1 [1]; 2010 No 59, Sch 1.1 [1]; 2011 No 56, Sch 1 [1]; 2013 No 95, Sch 1.1 [1]; 2014 No 75, Sch 1 [3]–[7]; 2022 No 68, Sch 3[1].

Part 2 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Secs 5–8

Rep 2001 No 118, Sch 1 [4].

Sec 9

Am 1986 No 18, Sch 1 (3) (4). Rep 2001 No 118, Sch 1 [4].

Secs 10, 11

Rep 2001 No 118, Sch 1 [4].

Sec 12

Am 1986 No 18, Sch 1 (5). Subst 1990 No 60, Sch 3 (1). Am 1996 No 142, Sch 2 [2] [3]. Rep 2001 No 118, Sch 1 [4].

Sec 12A

Ins 1990 No 60, Sch 3 (2). Rep 2001 No 118, Sch 1 [4].

Sec 13

Rep 2001 No 118, Sch 1 [4].

Part 3 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Sec 14

Rep 2001 No 118, Sch 1 [4].

Sec 15

Am 1986 No 18, Sch 1 (6). Rep 2001 No 118, Sch 1 [4].

Sec 16

Rep 2001 No 118, Sch 1 [4].

Sec 17

Am 1986 No 18, Sch 1 (3) (7). Rep 2001 No 118, Sch 1 [4].

Sec 18

Rep 2001 No 118, Sch 1 [4].

Sec 19

Rep 1990 No 60, Sch 1 (1).

Sec 20

Am 1986 No 18, Sch 1 (8). Subst 1990 No 60, Sch 2 (1). Rep 2001 No 118, Sch 1 [4].

Sec 21

Rep 2001 No 118, Sch 1 [4].

Part 4 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Part 4, Div 1, heading (as originally enacted)

Ins 1990 No 60, Sch 1 (2). Rep 2001 No 118, Sch 1 [4].

Part 4, Div 1 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Sec 22

Am 1986 No 18, Sch 1 (9); 1990 No 60, Sch 1 (3). Rep 2001 No 118, Sch 1 [4].

Sec 23

Subst 1990 No 60, Sch 1 (4). Am 1994 No 45, Sch 1; 1996 No 142, Sch 2 [4] [5]; 1998 No 88, Sch 2 [1]. Rep 2001 No 118, Sch 1 [4].

Sec 24

Am 1986 No 18, Sch 1 (3) (10). Subst 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Part 4, Div 2, heading (as originally enacted)

Ins 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Part 4, Div 2 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Sec 25

Subst 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Sec 26

Subst 1990 No 60, Sch 1 (4); 1995 No 39, Sch 1 (1). Rep 2001 No 118, Sch 1 [4].

Sec 27

Subst 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Sec 27A

Ins 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Part 4, Divs 2A, 2B (secs 27AA–27AH) (as originally enacted)

Ins 1995 No 39, Sch 1 (2). Rep 2001 No 118, Sch 1 [4].

Part 4, Div 3 (secs 27B–27E) (as originally enacted)

Ins 1990 No 60, Sch 1 (4). Rep 2001 No 118, Sch 1 [4].

Part 5 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Part 5, Div 1 (as originally enacted)

Rep 2001 No 118, Sch 1 [4].

Sec 28

Rep 2001 No 118, Sch 1 [4].

Sec 29

Am 1990 No 60, Sch 6 (1); 1996 No 24, Sch 1. Rep 2001 No 118, Sch 1 [4].

Sec 29A

Ins 1986 No 18, Sch 1 (11). Am 1990 No 60, Sch 6 (2). Rep 2001 No 118, Sch 1 [4].

Sec 30

Am 1990 No 60, Sch 6 (3); 1996 No 24, Sch 1. Rep 2001 No 118, Sch 1 [4].

Sec 31

Am 1990 No 60, Sch 6 (4); 1996 No 24, Sch 1. Rep 2001 No 118, Sch 1 [4].

Part 5, Div 2

Subst 1990 No 60, Sch 6 (5). Rep 2001 No 118, Sch 1 [4].

Sec 32

Subst 1990 No 60, Sch 6 (5). Rep 2001 No 118, Sch 1 [4].

Sec 33

Am 1983 No 153, Sch 1. Subst 1990 No 60, Sch 6 (5). Rep 2001 No 118, Sch 1 [4].

Sec 33A

Ins 1986 No 18, Sch 1 (12). Expired, 2.5.1990. Revived and am 1990 No 32, sec 3. Rep 1990 No 60, Sch 6 (5).

Secs 33B–33D

Ins 1986 No 18, Sch 1 (12). Rep 1990 No 60, Sch 6 (5).

Sec 34

Am 1983 No 153, Sch 1. Subst 1990 No 60, Sch 6 (5). Rep 2001 No 118, Sch 1 [4].

Secs 34A–34C

Ins 1990 No 60, Sch 6 (5). Rep 2001 No 118, Sch 1 [4].

Part 2 (previously Part 6)

Renumbered 2001 No 118, Sch 1 [5].

Part 2, Div 1 (sec 35)

Rep 2001 No 118, Sch 1 [6].

Sec 36

Am 1986 No 18, Sch 1 (13); 1990 No 60, Sch 2 (2); 1994 No 45, Sch 1; 1998 No 88, Sch 2 [2] [3]; 2006 No 40, Sch 3.1; 2006 No 85, Sch 4 [1] [2]; 2006 No 111, Sch 1 [12] [13]; 2014 No 75, Sch 1 [8] [9]; 2022 No 68, Sch 1[1].

Sec 36AA

Ins 2014 No 75, Sch 1 [10]. Am 2018 No 25, Sch 1.1.

Sec 36A

Ins 1996 No 142, Sch 2 [6]. Am 2001 No 118, Sch 1 [7].

Sec 36B

Ins 2014 No 75, Sch 1 [11].

Sec 37

Am 1986 No 18, Sch 1 (14); 1998 No 143, Sch 6.1 [1]–[4]; 2006 No 111, Sch 1 [14]; 2013 No 51, Sch 7.1 [1] [2]; 2013 No 66, Sch 1 [1].

Sec 38

Am 1990 No 60, Sch 2 (3); 1996 No 142, Sch 2 [7]; 2001 No 118, Sch 1 [8] [9]; 2003 No 4, Sch 1.1; 2013 No 66, Sch 1 [2] [3]; 2015 No 48, Sch 1.1 [1] [2]; 2022 No 68, Sch 1[2] [3].

Sec 39

Subst 1992 No 57, Sch 2. Am 2013 No 66, Sch 1 [1].

Part 2, Div 4

Subst 2009 No 58, Sch 1 [3].

Sec 40

Am 1986 No 18, Sch 1 (15). Subst 1990 No 60, Sch 5. Am 2001 No 118, Sch 1 [10]. Subst 2009 No 58, Sch 1 [3]. Am 2011 No 22, Sch 2.1; 2013 No 66, Sch 1 [1]; 2014 No 75, Sch 1 [12].

Sec 40AA

Ins 1994 No 45, Sch 1. Am 1996 No 142, Sch 2 [8]. Rep 2009 No 58, Sch 1 [3].

Sec 40AB

Ins 1996 No 142, Sch 2 [9]. Rep 2009 No 58, Sch 1 [3].

Sec 40A

Ins 1990 No 60, Sch 5. Am 2006 No 111, Sch 1 [15]. Rep 2009 No 58, Sch 1 [3].

Sec 40B

Ins 1990 No 60, Sch 5. Am 2001 No 118, Sch 1 [11] [12]. Rep 2009 No 58, Sch 1 [3].

Sec 40C

Ins 1990 No 60, Sch 5. Am 2001 No 118, Sch 1 [13]. Rep 2009 No 58, Sch 1 [3].

Sec 40D

Ins 1990 No 60, Sch 5. Am 2001 No 118, Sch 1 [14]; 2006 No 111, Sch 1 [16]. Rep 2009 No 58, Sch 1 [3].

Secs 41, 42

Subst 2009 No 58, Sch 1 [3].

Sec 42A

Ins 2006 No 111, Sch 1 [17]. Subst 2009 No 58, Sch 1 [3].

Secs 42B, 42C

Ins 2009 No 58, Sch 1 [3].

Sec 42D

Ins 2009 No 58, Sch 1 [3]. Am 2013 No 66, Sch 1 [1] [4].

Sec 42E

Ins 2009 No 58, Sch 1 [3]. Am 2011 No 56, Sch 1 [2]; 2013 No 66, Sch 1 [5]; 2014 No 75, Sch 1 [13].

Sec 42F

Ins 2009 No 58, Sch 1 [3].

Sec 42G

Ins 2009 No 58, Sch 1 [3]. Am 2013 No 66, Sch 1 [1].

Sec 42H

Ins 2009 No 58, Sch 1 [3].

Sec 42I

Ins 2009 No 58, Sch 1 [3].

Sec 42IA

Am 2022 No 68, Sch 1[4].

Sec 42J

Ins 2009 No 58, Sch 1 [3]. Am 2022 No 68, Sch 1[5]–[7].

Sec 42K

Ins 2009 No 58, Sch 1 [3]. Am 2022 No 68, Sch 1[8].

Sec 42L

Ins 2009 No 58, Sch 1 [3].

Sec 42M

Ins 2009 No 58, Sch 1 [3].

Sec 42N

Ins 2009 No 58, Sch 1 [3].

Sec 42O

Ins 2009 No 58, Sch 1 [3].

Sec 42P

Ins 2009 No 58, Sch 1 [3].

Part 2, Div 4A

Ins 2009 No 58, Sch 1 [3].

Secs 42Q–42S

Ins 2009 No 58, Sch 1 [3].

Sec 42T

Ins 2009 No 58, Sch 1 [3]. Subst 2013 No 66, Sch 1 [6].

Sec 42U

Ins 2009 No 58, Sch 1 [3].

Sec 42UA

Ins 2022 No 68, Sch 1[9].

Sec 42V

Ins 2009 No 58, Sch 1 [3].

Sec 42W

Ins 2009 No 58, Sch 1 [3]. Am 2013 No 66, Sch 1 [7].

Sec 42X

Ins 2009 No 58, Sch 1 [3].

Sec 43

Am 1991 No 53, Sch 1; 1994 No 88, Sch 7; 1995 No 11, Sch 1. Subst 2001 No 118, Sch 1 [15].

Sec 44

Am 1991 No 53, Sch 1; 1994 No 88, Sch 7; 1995 No 11, Sch 1; 2013 No 66, Sch 1 [8].

Sec 44A

Ins 1986 No 18, Sch 1 (16). Am 1990 No 60, Sch 6 (6).

Part 3 (previously Part 7)

Renumbered 2001 No 118, Sch 1 [5].

Sec 45

Am 1990 No 60, Sch 2 (4); 1992 No 29, Sch 5; 1996 No 137, Sch 2.1; 1999 No 42, Sch 3.1 [1]–[3]; 2012 No 16, Sch 5 [1]–[3].

Sec 46

Subst 1990 No 60, Sch 6 (7). Am 1996 No 24, Sch 1.

Part 4 (previously Part 8)

Renumbered 2001 No 118, Sch 1 [5].

Sec 47

Am 2013 No 66, Sch 1 [1].

Sec 48

Am 2001 No 118, Sch 1 [16]; 2013 No 66, Sch 1 [1].

Part 5

Ins 2001 No 118, Sch 1 [17].

Part 5, Div 1

Ins 2001 No 118, Sch 1 [17].

Sec 49

Ins 2001 No 118, Sch 1 [17].

Sec 50

Ins 2001 No 118, Sch 1 [17].

Sec 51

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 4.1[5].

Part 5, Div 1A

Ins 2006 No 111, Sch 1 [18].

Sec 52

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [18]. Am 2009 No 58, Sch 1 [4]; 2014 No 75, Sch 1 [14]–[16]; 2017 No 1, Sch 1 [1].

Sec 52A

Ins 2006 No 111, Sch 1 [18]. Am 2014 No 75, Sch 1 [17].

Sec 52AA

Ins 2009 No 58, Sch 1 [5].

Sec 52B

Ins 2006 No 111, Sch 1 [18]. Am 2009 No 58, Sch 1 [6]. Rep 2014 No 75, Sch 1 [18].

Sec 52C

Ins 2006 No 111, Sch 1 [18]. Subst 2014 No 75, Sch 1 [19].

Sec 52D

Ins 2006 No 111, Sch 1 [18].

Sec 52E

Ins 2006 No 111, Sch 1 [18]. Am 2013 No 66, Sch 1 [9].

Sec 52F

Ins 2006 No 111, Sch 1 [18].

Sec 52G

Ins 2006 No 111, Sch 1 [18]. Am 2009 No 58, Sch 1 [7]; 2011 No 56, Sch 1 [3]; 2013 No 66, Sch 1 [10] [11]; 2014 No 75, Sch 1 [20] [21]; 2022 No 68, Sch 2.1[1].

Sec 52H

Ins 2006 No 111, Sch 1 [18].

Part 5, Div 2

Ins 2001 No 118, Sch 1 [17].

Sec 53

Ins 2001 No 118, Sch 1 [17].

Sec 54

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [19]–[22].

Sec 55

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [23]–[27]; 2016 No 55, Sch 1.1 [1].

Sec 56

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [28]–[33].

Sec 57

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [34]–[37]; 2014 No 75, Sch 1 [22].

Sec 57A

Ins 2014 No 75, Sch 1 [23].

Sec 58

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [38] [39].

Sec 59

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [40]. Am 2013 No 66, Sch 1 [12].

Sec 60

Ins 2001 No 118, Sch 1 [17].

Part 5, Div 3

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41].

Sec 61

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41].

Sec 62

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2011 No 56, Sch 1 [4]–[6]; 2013 No 66, Sch 1 [13].

Sec 63

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41] (am 2007 No 27, Sch 1.2). Am 2013 No 66, Sch 1 [14] [15]; 2014 No 75, Sch 1 [24]; 2016 No 27, Sch 1.1 [1]; 2022 No 68, Sch 2.1[2].

Sec 63A

Ins 2022 No 68, Sch 2.1[3].

Sec 63B

Ins 2022 No 68, Sch 2.1[3].

Sec 64

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2016 No 27, Sch 1.1 [2]; 2016 No 55, Sch 1.1 [2].

Sec 65

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [16] [17]; 2022 No 68, Sch 2.1[4].

Sec 66

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [18]–[20]; 2022 No 68, Sch 2.1[5]–[11].

Sec 66A

Ins 2022 No 68, Sch 2[12].

Sec 67

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2016 No 55, Sch 1.1 [3]; 2022 No 68, Schs 2.1[13], 3[2].

Sec 68

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [21].

Sec 69

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 95, Sch 2.1 [1] [2].

Sec 70

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [22]; 2013 No 95, Sch 2.1 [3].

Sec 71

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [22]; 2013 No 95, Sch 2.1 [1] [4].

Sec 72

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [41]. Am 2013 No 66, Sch 1 [23]; 2022 No 68, Sch 4.1[6].

Part 5, Div 4 (secs 73–77)

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [41].

Part 5, Div 5

Ins 2001 No 118, Sch 1 [17].

Sec 78

Ins 2001 No 118, Sch 1 [17].

Sec 78A

Ins 2006 No 111, Sch 1 [42]. Am 2013 No 66, Sch 1 [24]; 2014 No 75, Sch 1 [25].

Sec 78B

Ins 2006 No 111, Sch 1 [42]. Am 2013 No 95, Sch 1.1 [2]; 2014 No 75, Sch 1 [26].

Sec 78C

Ins 2006 No 111, Sch 1 [42].

Sec 79

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 66, Sch 1 [25] [26]; 2014 No 75, Sch 1 [27]–[29]; 2016 No 27, Sch 1.1 [3]; 2018 No 33, Sch 5.1.

Sec 79A

Ins 2006 No 111, Sch 1 [43]. Subst 2013 No 66, Sch 1 [27]. Am 2022 No 68, Sch 4.1[7] [8].

Secs 80, 81

Ins 2001 No 118, Sch 1 [17].

Part 5, Div 6

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [44].

Sec 82

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [44]. Am 2014 No 75, Sch 1 [30]; 2022 No 68, Sch 1[10].

Sec 83

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [44]. Am 2009 No 58, Sch 1 [8]. Subst 2014 No 75, Sch 1 [31].

Sec 84

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [44]. Am 2014 No 75, Sch 1 [32]–[34]; 2015 No 15, Sch 1.1 [1].

Sec 85

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44]. Am 2014 No 75, Sch 1 [35].

Sec 86

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44].

Part 5, Div 7

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [44].

Secs 87, 88

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44].

Sec 89

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44]. Am 2013 No 47, Sch 1.1.

Sec 90

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44].

Sec 91

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44]. Am 2014 No 75, Sch 1 [36].

Sec 92

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45]. Ins 2006 No 111, Sch 1 [44].

Part 6

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [45].

Sec 93

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [45]. Am 2009 No 56, Sch 4.1.

Secs 94–103

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [45].

Part 7

Ins 2001 No 118, Sch 1 [17].

Part 7, Div 1, heading

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [46].

Part 7, Div 1 (secs 104, 105)

Ins 2001 No 118, Sch 1 [17].

Part 7, Div 2

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 106

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2009 No 58, Sch 1 [9]–[11]; 2014 No 75, Sch 1 [37]–[39]; 2016 No 27, Sch 1.1 [4]; 2022 No 68, Sch 4.1[9].

Sec 106A

Ins 2009 No 58, Sch 1 [12].

Sec 107

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 108

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2014 No 75, Sch 1 [40] [41].

Sec 109

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Rep 2014 No 75, Sch 1 [42].

Sec 110

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]; 2013 No 66, Sch 1 [28].

Sec 111

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]; 2014 No 75, Sch 1 [43]. Am 2015 No 15, Sch 1.1 [2].

Sec 112

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 113

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2009 No 58, Sch 1 [13]; 2014 No 75, Sch 1 [44]–[46]; 2022 No 68, Sch 4.1[10].

Sec 114

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2022 No 68, Sch 4.1[11] [12].

Sec 115

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 116

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2009 No 58, Sch 1 [14] [15]; 2013 No 66, Sch 1 [29]; 2016 No 27, Sch 1.1 [5]; 2022 No 68, Sch 2.1[14].

Sec 117

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 118

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2007 No 27, Sch 1.1 [1].

Sec 119

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Part 7, Div 3

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 120

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2007 No 27, Sch 1.1 [2].

Sec 121

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [30] [31].

Secs 122–124

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 125

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2017 No 66, Sch 8.1.

Secs 126–128

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 129

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2016 No 55, Sch 1.1 [4].

Secs 130, 131

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Part 7, Div 4

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47].

Sec 132

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [32] [33]; 2022 No 68, Schs 2.1[20]–[23], 4.1[13]; 2023 No 7, Sch 2.1.

Sec 132A

Ins 2013 No 66, Sch 1 [34].

Sec 133

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [35] [36]; 2016 No 55, Sch 1.1 [5]; 2022 No 68, Schs 2.1[24], 3[3].

Sec 134

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [37].

Sec 135

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 95, Sch 2.1 [5] [6].

Sec 136

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [22]; 2013 No 95, Sch 2.1 [7].

Sec 137

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [47]. Am 2013 No 66, Sch 1 [22]; 2013 No 95, Sch 2.1 [1] [8].

Part 7, Div 5

Subst 2006 No 111, Sch 1 [47].

Sec 137A

Ins 2006 No 111, Sch 1 [47].

Sec 137B

Ins 2006 No 111, Sch 1 [47]. Am 2009 No 58, Sch 1 [8]; 2014 No 75, Sch 1 [47]; 2022 No 68, Sch 1[11].

Sec 137C

Ins 2006 No 111, Sch 1 [47]. Am 2022 No 68, Sch 1[12] [13].

Sec 137D

Ins 2006 No 111, Sch 1 [47].

Part 7, Divs 6–8

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [47].

Part 7, Div 9

Ins 2001 No 118, Sch 1 [17].

Sec 138

Ins 2001 No 118, Sch 1 [17].

Sec 138A

Ins 2006 No 111, Sch 1 [48]. Am 2013 No 95, Sch 1.1 [3]; 2014 No 75, Sch 1 [48]; 2022 No 68, Sch 4.1[14] [15].

Sec 139

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [49].

Sec 140

Ins 2001 No 118, Sch 1 [17].

Sec 141

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [49].

Sec 141A

Ins 2006 No 111, Sch 1 [50].

Part 7, Div 10

Ins 2001 No 118, Sch 1 [17].

Sec 142

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [51].

Sec 143

Ins 2001 No 118, Sch 1 [17].

Sec 143A

Ins 2006 No 111, Sch 1 [52]. Subst 2013 No 66, Sch 1 [38]. Am 2022 No 68, Sch 4.1[16] [17].

Sec 144

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 66, Sch 1 [39]; 2016 No 27, Sch 1.1 [6]; 2022 No 68, Sch 2.1[25].

Sec 145

Ins 2001 No 118, Sch 1 [17].

Part 7, Div 11 (secs 146–148)

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [53].

Part 8

Ins 2001 No 118, Sch 1 [17].

Part 8, Div 1

Ins 2001 No 118, Sch 1 [17].

Sec 149

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [54]–[56]; 2013 No 66, Sch 1 [40].

Sec 149A

Ins 2009 No 58, Sch 1 [16]. Am 2022 No 68, Sch 1[14].

Sec 150

Ins 2001 No 118, Sch 1 [17]. Am 2009 No 58, Sch 1 [17]; 2022 No 68, Sch 4.1[18]–[20].

Sec 151

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [57].

Sec 152

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 66, Sch 1 [41]; 2014 No 75, Sch 1 [50].

Part 8, Div 1A

Ins 2022 No 68, Sch 4.1[21].

Sec 152A

Ins 2022 No 68, Sch 4.1[21].

Sec 152B

Ins 2022 No 68, Sch 4.1[21].

Sec 152C

Ins 2022 No 68, Sch 4.1[21].

Sec 152D

Ins 2022 No 68, Sch 4.1[21].

Sec 152E

Ins 2022 No 68, Sch 4.1[21].

Sec 152F

Ins 2022 No 68, Sch 4.1[21].

Sec 152G

Ins 2022 No 68, Sch 4.1[21].

Sec 152H

Ins 2022 No 68, Sch 4.1[21].

Part 8, Div 2, heading

Subst 2022 No 68, Sch 4.1[21].

Part 8, Div 2

Ins 2001 No 118, Sch 1 [17].

Sec 153

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [58]–[60]; 2013 No 66, Sch 1 [42]; 2014 No 75, Sch 1 [51]–[53].

Sec 154

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [61] [62]. Rep 2014 No 75, Sch 1 [54].

Sec 155

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [63]; 2022 No 68, Sch 4.1[23].

Sec 156

Ins 2001 No 118, Sch 1 [17].

Sec 157

Ins 2001 No 118, Sch 1 [17]. Rep 2022 No 68, Sch 4.1[24].

Sec 158

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [64]–[66]. Subst 2014 No 75, Sch 1 [55].

Sec 159

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [67]. Rep 2022 No 68, Sch 4.1[24].

Sec 160

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [68]–[70]; 2014 No 75, Sch 1 [56] [57].

Sec 161

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [71]; 2014 No 75, Sch 1 [58]; 2022 No 68, Sch 4.1[25].

Part 8, Div 3, heading

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [72].

Part 8, Div 3

Ins 2001 No 118, Sch 1 [17].

Sec 162

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [73]; 2013 No 66, Sch 1 [43].

Sec 163

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [74]. Rep 2013 No 66, Sch 1 [44].

Part 8A

Rep 2001 No 118, Sch 1 [17] (for information concerning Part 8A before the commencement of 2001 No 118, Sch 1 [17] see the Historical table of amendments in the Legislative history).

Part 9

Ins 2001 No 118, Sch 1 [17] (for information concerning Part 9 before the commencement of 2001 No 118, Sch 1 [17] see the Historical table of amendments in the Legislative history).

Part 9, Div 1

Ins 2001 No 118, Sch 1 [17].

Sec 164

Ins 2001 No 118, Sch 1 [17].

Sec 165

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [71] [75]–[78]; 2015 No 15, Sch 1.1 [3]; 2016 No 27, Sch 1.1 [7].

Sec 165AA

Ins 2014 No 75, Sch 1 [59]. Am 2017 No 63, Sch 5.

Sec 165A

Ins 2006 No 111, Sch 1 [79]. Am 2014 No 75, Sch 1 [60]; 2022 No 68, Sch 4.1[26]; 2023 No 35, Sch 4.1.

Part 9, Div 2

Ins 2001 No 118, Sch 1 [17].

Sec 166

Ins 2001 No 118, Sch 1 [17].

Sec 167

Ins 2001 No 118, Sch 1 [17].

Sec 168

Ins 2001 No 118, Sch 1 [17].

Sec 169

Ins 2001 No 118, Sch 1 [17].

Part 9, Div 3

Ins 2001 No 118, Sch 1 [17].

Sec 170

Ins 2001 No 118, Sch 1 [17].

Sec 171

Ins 2001 No 118, Sch 1 [17]. Am 2022 No 68, Sch 4.1[27]–[29].

Sec 172

Ins 2001 No 118, Sch 1 [17].

Sec 173

Ins 2001 No 118, Sch 1 [17].

Sec 174

Ins 2001 No 118, Sch 1 [17]. Am 2022 No 68, Sch 4.1[30] [31].

Sec 175

Ins 2001 No 118, Sch 1 [17].

Part 10, heading

Ins 2001 No 118, Sch 1 [17]. Subst 2014 No 75, Sch 1 [61]; 2022 No 68, Sch 3[4].

Part 10

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 1

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Sec 176

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [80]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 2

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Sec 177

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [81]–[83]; 2014 No 75, Sch 1 [62] [63]. Subst 2022 No 68, Sch 3[4].

Sec 178

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [84]. Rep 2013 No 95, Sch 1 [4]. Ins 2022 No 68, Sch 3[4].

Sec 179

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 30, Sch 9.1. Rep 2013 No 95, Sch 1.1 [4]. Ins 2022 No 68, Sch 3[4].

Sec 180

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [4]. Ins 2022 No 68, Sch 3[4].

Sec 181

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [4]. Ins 2022 No 68, Sch 3[4].

Sec 182

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 3

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [4]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 3, Subdiv 1

Ins 2022 No 68, Sch 3[4].

Sec 183

Ins 2001 No 118, Sch 1 [17]. Am 2010 No 19, Sch 3.2 [2]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 3, Subdiv 2

Ins 2022 No 68, Sch 3[4].

Sec 184

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [77] [78]. Subst 2022 No 68, Sch 3[4].

Sec 185

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Sec 186

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [79] [80]. Subst 2022 No 68, Sch 3[4].

Sec 187

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 3A, heading

Ins 2006 No 111, Sch 1 [85]. Subst 2014 No 75, Sch 1 [64]. Rep 2022 No 68, Sch 3[4].

Part 10, Div 3A

Ins 2006 No 111, Sch 1 [85]. Rep 2022 No 68, Sch 3[4].

Secs 181A–181E

Ins 2006 No 111, Sch 1 [85]. Subst 2014 No 75, Sch 1 [65]. Rep 2022 No 68, Sch 3[4].

Sec 181F

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 66, Sch 1 [45]. Subst 2014 No 75, Sch 1 [65]. Rep 2022 No 68, Sch 3[4].

Sec 181G

Ins 2006 No 111, Sch 1 [85]. Rep 2014 No 75, Sch 1 [65].

Sec 181H

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 1.1 [5]–[7]. Rep 2014 No 75, Sch 1 [65].

Sec 181I

Ins 2006 No 111, Sch 1 [85]. Rep 2014 No 75, Sch 1 [65].

Sec 181J

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 1.1 [8]–[10]; 2014 No 75, Sch 1 [66]–[68]. Rep 2022 No 68, Sch 3[4].

Sec 181K

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 1.1 [11] [12]; 2014 No 75, Sch 1 [69]. Rep 2022 No 68, Sch 3[4].

Sec 181L

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 1.1 [13]; 2014 No 75, Sch 1 [70] [71]. Rep 2022 No 68, Sch 3[4].

Sec 181M

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 2.1 [9]; 2014 No 75, Sch 1 [72]–[74]. Rep 2022 No 68, Sch 3[4].

Sec 181N

Ins 2006 No 111, Sch 1 [85]. Am 2013 No 95, Sch 1.1 [14]. Rep 2014 No 75, Sch 1 [75].

Sec 181O

Ins 2006 No 111, Sch 1 [85]. Am 2014 No 75, Sch 1 [76]. Rep 2022 No 68, Sch 3[4].

Part 10, Div 4

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Part 10, Div 4, Subdiv 1

Ins 2022 No 68, Sch 3[4].

Sec 188

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 3[4].

Sec 189

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4]

Sec 190

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 4, Subdiv 2

Ins 2022 No 68, Sch 3[4].

Sec 191

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 192

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 193

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 194

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [15]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 195

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 4, Subdiv 3

Ins 2022 No 68, Sch 3[4].

Sec 196

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 197

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [16]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Sec 198

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [18] [19]. Rep 2014 No 75, Sch 1 [82]. Ins 2022 No 68, Sch 3[4].

Sec 199

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [20] [21]. Rep 2014 No 75, Sch 1 [82]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 4, Subdiv 4

Ins 2022 No 68, Sch 3[4].

Sec 200

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [26]. Ins 2022 No 68, Sch 3[4].

Sec 201

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [27]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 4, Subdiv 5

Ins 2022 No 68, Sch 3[4].

Sec 202

Ins 2001 No 118, Sch 1 [17]. Am 2005 No 98, Sch 3.1 [1]. Rep 2013 No 95, Sch 1.1 [28]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 5

Ins 2001 No 118, Sch 1 [17]. Rep 2014 No 75, Sch 1 [81]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 5, Subdiv 1, heading

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [86].

Sec 203

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [29]. Ins 2022 No 68, Sch 3[4].

Sec 204

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [30]. Ins 2022 No 68, Sch 3[4].

Sec 205

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [31]. Ins 2022 No 68, Sch 3[4].

Sec 206

Ins 2001 No 118, Sch 1 [17]. Am 2005 No 98, Sch 3.1 [1] [2]. Rep 2013 No 95, Sch 1.1 [32]. Ins 2022 No 68, Sch 3[4].

Sec 207

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [33]. Subst 2022 No 68, Sch 3[4].

Sec 208

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [34]. Ins 2022 No 68, Sch 3[4].

Sec 209

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [89]–[91]. Rep 2013 No 95, Sch 1.1 [35]. Ins 2022 No 68, Sch 3[4].

Part 10, Div 5, Subdiv 2, heading

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [86].

Part 10, Div 6, heading

Ins 2006 No 111, Sch 1 [87]. Am 2013 No 95, Sch 1.1 [17]. Rep 2022 No 68, Sch 3[4].

Part 10, Div 6, Subdiv 1, heading

Ins 2006 No 111, Sch 1 [87]. Rep 2014 No 75, Sch 1 [82].

Part 10, Div 6, Subdiv 2, heading

Ins 2006 No 111, Sch 1 [88]. Subst 2014 No 75, Sch 1 [83]. Rep 2022 No 68, Sch 3[4].

Part 10, Div 6, Subdiv 2

Ins 2006 No 111, Sch 1 [88]. Rep 2022 No 68, Sch 3[4].

Sec 199A

Ins 2006 No 111, Sch 1 [88]. Am 2013 No 95, Sch 1.1 [22] [23]; 2014 No 75, Sch 1 [84]. Rep 2022 No 68, Sch 3[4].

Sec 199B

Ins 2006 No 111, Sch 1 [88]. Am 2013 No 95, Sch 1.1 [24] [25]. Rep 2022 No 68, Sch 3[4].

Part 10, Div 6, Subdiv 3, heading

Ins 2006 No 111, Sch 1 [88]. Rep 2022 No 68, Sch 3[4].

Sec 210

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [36].

Sec 211

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [92]; 2013 No 95, Sch 1.1 [37]. Rep 2014 No 75, Sch 1 [85].

Sec 211A

Ins 2006 No 111, Sch 1 [93]. Am 2013 No 95, Sch 1.1 [38]; 2014 No 75, Sch 1 [86]–[91]. Rep 2022 No 68, Sch 3[4].

Sec 212

Ins 2001 No 118, Sch 1 [17]. Rep 2013 No 95, Sch 1.1 [39].

Sec 213

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [94]. Rep 2013 No 95, Sch 1.1 [40].

Sec 214

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [95]. Rep 2013 No 95, Sch 1.1 [41].

Sec 215

Ins 2001 No 118, Sch 1 [17]. Am 2013 No 95, Sch 1.1 [42]. Rep 2022 No 68, Sch 3[4].

Sec 215A

Ins 2013 No 95, Sch 1.1 [43]. Rep 2022 No 68, Sch 3[4].

Part 11

Ins 2001 No 118, Sch 1 [17].

Part 11, Div 1

Ins 2001 No 118, Sch 1 [17].

Sec 216

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [96] [97]; 2010 No 59, Sch 1.1 [2].

Sec 217

Ins 2001 No 118, Sch 1 [17]. Am 2007 No 27, Sch 1.1 [3].

Sec 218

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [95] [96].

Sec 219

Ins 2001 No 118, Sch 1 [17].

Sec 220

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [98].

Sec 221

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [99].

Sec 221A

Ins 2006 No 111, Sch 1 [100]. Am 2014 No 75, Sch 1 [100] [101].

Sec 221B

Ins 2014 No 75, Sch 1 [102].

Part 11, Div 2

Ins 2001 No 118, Sch 1 [17].

Sec 222

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [101]–[105]; 2010 No 59, Sch 1.1 [2]; 2013 No 66, Sch 1 [46]; 2014 No 75, Sch 1 [104]–[107]; 2017 No 1, Sch 1 [2]; 2022 No 68, Sch 4.1[32].

Sec 223

Ins 2001 No 118, Sch 1 [17]; 2022 No 68, Sch 4.1[33].

Sec 223A

Ins 2006 No 111, Sch 1 [106].

Sec 223B

Ins 2006 No 111, Sch 1 [106]. Am 2017 No 1, Sch 1 [3]–[6].

Sec 224

Ins 2001 No 118, Sch 1 [17]. Am 2007 No 27, Sch 1.1 [4].

Sec 225

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [107]; 2014 No 75, Sch 1 [113].

Sec 226

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [108] [109].

Sec 227

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [114] [115].

Sec 228

Ins 2001 No 118, Sch 1 [17].

Sec 229

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [110].

Sec 230

Ins 2001 No 118, Sch 1 [17]. Am 2011 No 56, Sch 1 [7]; 2014 No 75, Sch 1 [118]; 2016 No 27, Sch 1.1 [8].

Sec 231

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [111] [112]; 2017 No 1, Sch 1 [7].

Sec 232

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [113].

Part 11, Div 3, heading

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [114].

Part 11, Div 3

Ins 2001 No 118, Sch 1 [17].

Sec 233

Ins 2001 No 118, Sch 1 [17].

Sec 234

Ins 2001 No 118, Sch 1 [17]. Subst 2006 No 111, Sch 1 [115]. Am 2010 No 59, Sch 1.1 [2]; 2014 No 75, Sch 1 [123]. Rep 2017 No 1, Sch 1 [8].

Part 11, Div 4 (secs 234A–234E)

Ins 2017 No 1. Sch 1 [9].

Part 12

Ins 2001 No 118, Sch 1 [17].

Sec 235

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [125] [126]; 2022 No 68, Sch 3[5].

Sec 236

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [127].

Sec 237

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [128].

Part 13

Ins 2001 No 118, Sch 1 [17].

Sec 238

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [116]–[119].

Sec 239

Ins 2001 No 118, Sch 1 [17].

Sec 239A

Ins 2009 No 58, Sch 1 [18].

Sec 240

Ins 2001 No 118, Sch 1 [17]. Am 2010 No 61, Sch 2.1 [1] [2].

Sec 241

Ins 2001 No 118, Sch 1 [17]. Am 2014 No 75, Sch 1 [129].

Part 14

Ins 2001 No 118, Sch 1 [17].

Sec 242

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [120]–[122]; 2009 No 58, Sch 1 [19]; 2013 No 66, Sch 1 [47] [48].

Sec 243

Ins 2001 No 118, Sch 1 [17].

Sec 243A

Ins 2013 No 66, Sch 1 [49]. Am 2022 No 68, Sch 3[6].

Sec 244

Ins 2001 No 118, Sch 1 [17].

Sec 245

Ins 2001 No 118, Sch 1 [17]. Subst 2022 No 68, Sch 4.1[34].

Sec 246

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [123] [124].

Sec 246A

Ins 2013 No 66, Sch 1 [50].

Sec 247

Ins 2001 No 118, Sch 1 [17].

Sec 248

Ins 2001 No 118, Sch 1 [17]. Am 2009 No 54, Sch 2.1; 2014 No 75, Sch 1 [130].

Sec 248A

Ins 2014 No 75, Sch 1 [131].

Sec 248B

Ins 2014 No 75, Sch 1 [132].

Sec 249

Ins 2001 No 118, Sch 1 [17].

Sec 249A

Ins 2006 No 111, Sch 1 [125].

Sec 250

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [126]–[128].

Sec 251

Ins 2001 No 118, Sch 1 [17]. Rep 2006 No 111, Sch 1 [129].

Sec 252

Ins 2001 No 118, Sch 1 [17]. Am 2006 No 111, Sch 1 [130]–[134]; 2013 No 66, Sch 1 [51]; 2014 No 75, Sch 1 [133].

Sec 252A

Ins 2006 No 111, Sch 1 [135].

Sec 253

Ins 2001 No 118, Sch 1 [17].

Sch 1

Rep 1992 No 57, Sch 2. Ins 2001 No 118, Sch 1 [18]. Am 2014 No 75, Sch 1 [134].

Sch 2

Ins 2001 No 118, Sch 1 [18]. Rep 2013 No 95, Sch 1.1 [44].

Sch 3

Am 1987 No 143, Sch 1. Rep 1999 No 85, Sch 4. Ins 2006 No 111, Sch 1 [136]. Am 2013 No 66, Sch 1 [52]; 2015 No 15, Sch 1.1 [4]; 2022 No 68, Sch 4.1[35] [36].

Sch 3A

Ins 2006 No 111, Sch 1 [137].

Sch 4

Am 1990 No 60, Sch 8; 1991 No 59, sec 3; 1996 No 142, Sch 2 [14] [15]; 1997 No 55, Sch 4 [1] [2]; 2001 No 118, Sch 1 [19]–[21]; 2004 No 69, Sch 1; 2006 No 111, Sch 1 [138] [139]; 2007 No 27, Sch 1.1 [5]; 2008 No 62, Sch 1.1; 2009 No 58, Sch 1 [20] [21]; 2010 No 59, Sch 1.1 [3]; 2011 No 56, Sch 1 [8] [9]; 2012 No 42, Sch 1.1; 2013 No 66, Sch 1 [53] [54]; 2014 No 33, Sch 1.1; 2014 No 75, Sch 1 [135] [136]; 2016 No 27, Sch 1.1 [9]; 2017 No 1, Sch 1 [10].

Sch 5

Ins 1990 No 60, Sch 1 (5). Am 1999 No 94, sec 7 (3) and Sch 5, Part 3. Rep 2001 No 118, Sch 1 [22]. Ins 2006 No 111, Sch 1 [140]. Am 2010 (520), cl 3 (1)–(3); 2015 (4), cl 3 (1)–(3); 2019 (587), cl 3; 2022 No 68, Sch 5.

Sch 6

Ins 1990 No 60, Sch 1 (5). Rep 2001 No 118, Sch 1 [22].

The whole Act (except Sch 4)

Am 2006 No 111, Sch 1 [1] (“Pecuniary Interest Tribunal” omitted wherever occurring, “Pecuniary Interest and Disciplinary Tribunal” inserted instead).

Information concerning Parts 8A and 9 before the commencement of 2001 No 118, Sch 1 [17].

Part 8A

Ins 1996 No 142, Sch 2 [10]. Rep 2001 No 118, Sch 1 [17].

Sec 49

Rep 1996 No 142, Sch 2 [11]. Ins 1996 No 142, Sch 2 [10]. Rep 2001 No 118, Sch 1 [17].

Secs 49A–49G

Ins 1996 No 142, Sch 2 [10]. Rep 2001 No 118, Sch 1 [17].

Part 9

Rep 2001 No 118, Sch 1 [17].

Sec 50

Rep 2001 No 118, Sch 1 [17].

Sec 51

Am 1991 No 69, Sch 1. Rep 2001 No 118, Sch 1 [17].

Sec 52

Rep 2001 No 118, Sch 1 [17].

Sec 53

Am 1990 No 60, Sch 2 (5). Rep 2001 No 118, Sch 1 [17].

Sec 54

Rep 2001 No 118, Sch 1 [17].

Sec 55

Subst 1990 No 60, Sch 7 (1). Rep 2001 No 118, Sch 1 [17].

Sec 56

Rep 1998 No 47, Sch 2.1. Rep 2001 No 118, Sch 1 [17].

Sec 56A

Ins 1986 No 18, Sch 1 (17). Rep 2001 No 118, Sch 1 [17].

Sec 56B

Ins 1990 No 60, Sch 4. Am 1991 No 94, Sch 1. Rep 2001 No 118, Sch 1 [17].

Sec 56C

Ins 1990 No 60, Sch 4. Rep 2001 No 118, Sch 1 [17].

Sec 56D

Ins 1990 No 60, Sch 6 (8). Rep 2001 No 118, Sch 1 [17].

Sec 57

Am 1986 No 18, Sch 1 (18). Subst 1990 No 60, Sch 6 (8). Rep 2001 No 118, Sch 1 [17].

Sec 57A

Ins 1986 No 18, Sch 1 (19). Subst 1990 No 60, Sch 6 (8). Rep 2001 No 118, Sch 1 [17].

Sec 57B

Ins 1990 No 60, Sch 6 (8). Rep 2001 No 118, Sch 1 [17].

Sec 58

Rep 2001 No 118, Sch 1 [17].

Sec 58A

Ins 1990 No 60, Sch 7 (2). Am 1991 No 94, Sch 2; 1996 No 142, Sch 2 [12]. Rep 2001 No 118, Sch 1 [17].

Sec 59

Am 1986 No 18, Sch 1 (20). Rep 2001 No 118, Sch 1 [17].

Sec 60

Rep 1990 No 60, Sch 7 (3).

Sec 61

Subst 1990 No 60, Sch 7 (4). Rep 2001 No 118, Sch 1 [17].

Sec 62

Rep 2001 No 118, Sch 1 [17].

Sec 63

Am 1986 No 18, Sch 1 (3). Rep 2001 No 118, Sch 1 [17].

Sec 64

Am 1986 No 18, Sch 1 (21). Rep 2001 No 118, Sch 1 [17].

Sec 65

Rep 2001 No 118, Sch 1 [17].

Sec 65A

Ins 1990 No 60, Sch 7 (5). Rep 2001 No 118, Sch 1 [17].

Sec 66

Am 1992 No 112, Sch 1. Rep 2001 No 118, Sch 1 [17].

Sec 67

Am 1990 No 60, Sch 7 (6). Rep 2001 No 118, Sch 1 [17].

Sec 68

Am 1986 No 18, Sch 1 (22); 1990 No 60, Schs 3 (3), 7 (7) (am 1990 No 108, Sch 2); 1992 No 112, Sch 1; 1995 No 39, Sch 1 (3); 1996 No 142, Sch 2 [13]. Rep 2001 No 118, Sch 1 [17].

Sec 69

Rep 2001 No 118, Sch 1 [17].

Sec 70

Rep 1999 No 85, Sch 4.

Sec 71

Rep 2001 No 118, Sch 1 [17].

Aboriginal Land Rights Bill 1983

More information on the passage of this Bill through Parliament, including links to the second reading speech and Legislation Review Committee report, is available via the Bills tab on the Parliament website.

Assent: 04 May 1983 PDF icon 1983 No 42