State Environmental Planning Policy (Infrastructure) 2007
Current version for 26 June 2020 to date (accessed 9 August 2020 at 01:44)
Part 3 Division 7
Division 7 Flood mitigation work
49   Definition
In this Division—
flood mitigation work has the same meaning as it has in the Standard Instrument.
Note.
 
The Standard Instrument defines flood mitigation work as follows—
flood mitigation work means work designed and constructed for the express purpose of mitigating flood impacts. It involves changing the characteristics of flood behaviour to alter the level, location, volume, speed or timing of flood waters to mitigate flood impacts. Types of works may include excavation, construction or enlargement of any fill, wall or levee that will alter riverine flood behaviour, local overland flooding, or tidal action so as to mitigate flood impacts.
Note.
 Examples of flood mitigation work include levees, barrages, causeways, cuttings, embankments, floodgates and detention basins.
50   Development permitted without consent
(1)  Development for the purpose of flood mitigation work may be carried out by or on behalf of a public authority without consent on any land.
(2)  A reference in this clause to development for the purpose of flood mitigation work includes a reference to development for any of the following purposes if the development is in connection with flood mitigation work—
(a)  construction works,
(b)  routine maintenance works,
(c)  environmental management works.